12/6/2022
CTDOT is announcing several upcoming short-term closures of I-84 Eastbound and Westbound in West Hartford between Exit 40 and Exit 41 for no more than 15-minute periods on Monday, December 12, 2022 and Tuesday December 13, 2022 between 12 a.m. and 5 a.m.
12/2/2022
CTDOT is announcing that a concrete repair project will be performed during the day on Bridge #174a (Q-Bridge) on I-95 Northbound in New Haven.
12/2/2022
CTDOT is announcing that a concrete repair project will be performed during the day on Bridge #3560 (North Avenue) on Route 8 Northbound in Bridgeport.
12/2/2022
CTDOT is announcing that a concrete repair project will be performed during the night on Bridge #98 on I-95 Northbound in Bridgeport.
12/1/2022
CTDOT is announcing the replacement of a railroad crossing, a portion of Route 6 at Clark Street will be closed in Bristol.
12/1/2022
CTDOT is announcing that an electrical sign installation project will be performed on I-84 Westbound in East Hartford on Monday December 5, 2022 5:30 a.m. - 6:30 p.m.
12/1/2022
CTDOT is announcing that guiderail upgrades will be performed on I-84 Westbound in East Hartford.
12/1/2022
CTDOT is announcing that an electrical sign installation project will be performed on I-91 Northbound in Windsor on Monday, December 5 from 5:30 a.m. - 6:30 p.m.
11/27/2022
CTDOT is announcing the replacement of traffic control signals to meet current standards at various locations in Western Connecticut starting April 1, 2023.
11/27/2022
CTDOT is announcing that a transmission line insulator bell replacement operation will require the closure of one right lane northbound and one right lane southbound on I-95 at Exit 8 in Stamford.