For real-time and up to date road closures, construction, lane closures, visit CTroads.org!
CTDOT Construction Advisories
Page 116 of 281
2809 total results
2809 total results
5/25/2023
CTDOT is announcing that a milling and resurfacing project will be performed on Route 5 in East Hartford from Pitkin Street to Ranney Street.
5/25/2023
CTDOT is announcing that a milling and resurfacing project will be performed on I-395 northbound and southbound in Griswold and Plainfield.
5/25/2023
The Connecticut Department of Transportation (CTDOT) is announcing that a pavement marking applications on center lines, shoulder lines and handwork will occur on various state routes.
5/25/2023
CTDOT is announcing that a milling and resurfacing project will be performed on I-395 Southbound in Norwich.
5/25/2023
CTDOT is announcing that tree work will be performed on I-84 Eastbound and Westbound in Newtown.
5/25/2023
CTDOT is announcing that a milling and resurfacing project will be performed on Route 16 in Colchester.
5/23/2023
CTDOT is announcing that replacement of catch basin tops will require the on-ramps and off-ramps on I-95 between Exit 51 and 54 in New Haven, East Haven, and Branford to be closed intermittently.
5/20/2023
The Connecticut Department of Transportation CTDOT is announcing that a safety improvement project will be performed on Route 32 in New London.
5/19/2023
CTDOT is announcing that a joint and crack sealing project will be performed on State Routes within Central Connecticut.
5/18/2023
CTDOT is announcing that, to facilitate construction work associated with the I-95 Interchange 74 Improvements in East Lyme, the on-ramp to I-95 Northbound at Exit 74 will need to close for two nights during nighttime hours on May 21, 2023 and May 22, 2023.