The Connecticut Department of Transportation (CTDOT) is announcing bridge joint repairs will be performed over the Mystic River on Interstate 95 in Mystic. The bridges are located between Exits 89 and 90.
The work is scheduled through Thursday, March 20, 2026, from 6:00 a.m. to 4:00 p.m., Monday through Thursday. This project is being performed to maintain the structural integrity of the bridges and ensure the continued safety of the traveling public.
The repairs will be performed by Hammonasset Construction.
LANE CLOSURE/DETOUR INFO
There will be a single lane closure on I-95 northbound and southbound, between Exits 89 and 90, during the scheduled work hours. Traffic control signing patterns and crash units will guide motorists safely through the work zone.
CTDOT urges motorists to maintain a safe speed, follow posted signage, and be alert to construction personnel and equipment when traveling through the area.