The Connecticut Department of Transportation (CTDOT) is announcing that a 1-inch thin surface treatment will take place on Route 45 in Warren/Cornwall (0.26 miles north of North Junction of Route 341 to 7). This project is scheduled to begin on Tuesday, September 16 and be completed on Monday, September 22, 2025.
LANE CLOSURE/DETOUR INFO
Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone. The regular work schedule for this project is 7:00 a.m. to 4:00 p.m., Monday through Friday.
Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions. Motorists are advised to maintain a safe speed when driving in this area.