The Connecticut Department of Transportation (CTDOT) is announcing that Bridge No 01547 over Beaver Brook will be replaced on Route 207 in Franklin. This project is scheduled to begin on Tuesday, April 1 and be completed by November 18, 2025. The project 0052-0093 consists of installing construction signs, temporary signalization, removal of existing structure, installation of micro-piles and construction of a new structure with integrated abutments.
CTDOT Project No. 0052-0093 was awarded to McNamee Construction Corporation at a cost of $4,744,000.00 on October 28, 2024, and is scheduled to be completed November 18, 2025. This project is administered by the Bureau of Engineering and Construction, Office of Construction, District 2 in Norwich, CT.
LANE CLOSURE/DETOUR INFO
Stages 1-2:
There will be alternating one-way traffic on Route 207 Tuesday, April 1 to Saturday, June 21, 2025. Traffic control signing patterns will guide motorists through the work zone.
Stages 3-5:
The bridge will be closed, and traffic will be detoured onto SR-610 from Saturday, June 21 to Sunday, August 24, 2025. Detour signage will guide motorists through the detour.
Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions. Motorists are advised to maintain a safe speed when driving in this area.