The Connecticut Department of Transportation (CTDOT) is announcing that bridge strengthening will be performed across the Gold Star Memorial Bridge in Groton and New London. This project is scheduled to occur on Tuesday, March 25, and be completed on November 1, 2025. The project 0094-0256 consists of bridge strengthening that will require the closure of the left lane to develop access to the underside of the bridge deck.
CTDOT Project No. 0094-0256 was awarded to Aetna Bridge Company at a cost of $50,895.103.60 on December 1, 2021, and is scheduled to be completed November 1, 2025. This project is administered by the Bureau of Engineering and Construction, Office of Construction, District 2 in Norwich.
For more information about the Gold Star Memorial Bridge Rehabilitation project, visit https://portal.ct.gov/goldstar-bridge
LANE CLOSURE/DETOUR INFO
There will be a left lane closure on I-95 southbound across the Gold Star Memorial Bridge from Tuesday, March 25 to November 1, 2025. Traffic control signing patterns will guide motorists through the work zone.
Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions. Motorists are advised to maintain a safe speed when driving in this area.