The Connecticut Department of Transportation (CTDOT) is announcing that work will be performed on Route 113 (main street) in Stratford. This project is scheduled to occur on Tuesday, November 26 and be completed on Friday, December 13, 2024. The project 0138-0256 consists of installing a cofferdam system and rebuilding the roadway.
CTDOT Project No. 0138-0256 was awarded to ROTHA Construction on October 30, 2024, and is scheduled to be completed December 13, 2024. This project is administered by the Bureau of Engineering and Construction, Office of Construction, District 3 in New Haven.
LANE CLOSURE/DETOUR INFO
Route 113 (main street) will be closed to traffic starting Monday, December 2 to Friday, December 13, 2024. Traffic will be detoured around the airport using the following roads: Access Road, Lordship Blvd, Oak Bluff Ave, Prospect Drive and Stratford Road. Traffic control signing patterns will guide motorists through the work zone.
Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions. Motorists are advised to maintain a safe speed when driving in this area.