Skip to Content Skip to Chat
Report an accessibility issue.
Connecticut's official state website logo State of Connecticut
×
 
Close Search
  • Arabic
  • Chinese (Simplified)
  • Chinese (Traditional)
  • English
  • French
  • German
  • Haitian Creole
  • Hindi
  • Italian
  • Korean
  • Pashto
  • Polish
  • Portuguese Brazil
  • Russian
  • Spanish
  • Filipino
  • Ukrainian
  • Vietnamese
Department of Transportation
Department of Transportation logo
Department of Transportation
  • YouTube
  • Instagram
  • Linkedin
  • X
  • Facebook
  • Tiktok
Department of Transportation
☰ Department of Transportation Main Menu
× Close
⮐ Back
⮐ Back
  • Home
  • Travel
    • Roads & Highways
      • Park & Ride
      • Parkway Restrictions
      • Rest Areas
      • Traffic Monitoring Data
      • Transportation Maps
    • Motorcycle resources
      • CONREP
    • Public Transportation
      • CT Buses
      • CT Ferries
      • CT Rail
      • CTDOT Ridesharing
    • Bicycle & Pedestrian
  • Business
    • Resources
      • Consultant Resources
      • Contractor Resources
      • Disadvantaged Business Enterprise (DBE)
    • Contracting & Project Awards
    • Equal Opportunity & Diversity
    • Title VI/Opportunity and Business Development
    • Manuals
    • Permits
  • Careers
    • Find a job
  • Bureaus
    • Commissioner
    • Engineering & Construction
    • Finance & Administration
    • Operations & Maintenance
    • Policy & Planning
    • Public Transportation
  • News
    • Construction Advisories
    • Press Releases
    • Upcoming Meetings
  • Programs & Projects
    • Active Projects
    • Major Projects & Initiatives
    • Programs
  • About
    • Branding
    • Resources
    • FAQ
    • Contact
      • Report An Issue
      • Email Alerts Signup
      • Submit An FOI Request
      • Media Inquiry
      • Submit a Claim

You are about to Logout

Are you sure you want to log out of your account? If you do want to logout, please click "Logout".
Logout
Press Release Homepage
CTDOT Connecticut Transportation Header image

Replacement of Roadway Illumination Systems in Eastern Connecticut

9/30/2024

The Connecticut Department of Transportation (CTDOT) is announcing that replacement of roadway illumination systems in eastern Connecticut will begin on October 7, 2024. The purpose of this project is to improve the operation and reduce the maintenance requirements of several roadway lighting systems located in eastern Connecticut that have reached the end of their life cycles.

This project consists of the replacement of existing roadway lighting systems on Route 1, Route 2, Route 6, Route 12, Route 78,1-95 and Route 154, which involves the replacement of the existing light standards, light standard foundations, light fixtures, concrete handholes, underground circuitry/conduits, and lighting control cabinets with new light standards, light standard foundations, light emitting diode (LED) type light fixtures, concrete handholes, underground circuitry/conduits, and lighting control cabinets, and the replacement of existing decorative post top light fixtures and lighting control cabinet with new LED type decorative post top fixtures and lighting control cabinet on the pedestrian walkway along 1-95 southbound at the south end of the Baldwin Bridge.

This project is located in eastern Connecticut at the following locations:

  • I-95 from Vauxhall Street Extension through Interchange 83 to the Goldstar Bridge in New London
  • Route 2 and Route 78 interchange in Stonington
  • Route 1 and Route 154 overlap in Old Saybrook
  • Route 1 from the end of the Route 154 overlap to Mill Rock Road East #1 in Old Saybrook
  • Route 154 from the end of the Route 1 overlap to the I-95 ramp in Old Saybrook
  • Route 2 at Interchange 13 in Marlborough
  • Route 6 from Willimantic Road to Boston Post Road in Columbia, Coventry, Mansfield and Windham
  • Route 12 and Route 2 overlap from Laurel Hill Avenue to the end of the overlap in Norwich
  • Route 2 from the end of the Route 12 overlap to Taiman Street in Norwich
  • Pedestrian walkway along I-95 southbound at the south end of the Baldwin Bridge in Old Saybrook.

CTDOT Project No. 0172-0524 was awarded to Ferguson Electric Company Inc., at a cost of $9,676,730.00 on August 23, 2024, and is scheduled to be completed August 8, 2026.  This project is administered by the Bureau of Engineering and Construction, Office of Construction, District II in Norwich.

 

LANE CLOSURE/DETOUR INFO

There will be a separate notice issued prior to work on the specific Routes listed below:

  • Route 1
  • Route 2
  • Route 6
  • Route 12
  • Route 78
  • Route 154
  • I-95
Media Contact:
860-594-2560
DOT.CustomerCare@ct.gov
Operating Hours: Monday - Friday 8:00 a.m. to 4:30 p.m.
Department of Transportation
Facebook external link Instagram external link Linkedin external link Tiktok external link X external link YouTube external link

Mailing address
2800 Berlin Turnpike
P.O. Box 317546
Newington CT 06131-7546

Report an Issue or Ask a Question
860-594-2560 
Online Webform

CTDOT Deaf, DeafBlind & Hard of Hearing Contact

ct.gov logo with flag embelishment
  • About CT
  • Policies
  • Accessibility
  • Directories
  • Social Media
  • For State Employees
US Flag Status icon
United States
Mast: (Full)
CT Flag Status icon
Connecticut
Mast: (Full)

© 2025 CT.gov - Connecticut's Official State Website