DOT Project 0111-0127 Webpage

Welcome to the webpage for Project 0111-0127, Replacement of Bridge No. 05350 – Bosworth Road over Mashamoquet Brook, in the Town of Pomfret.

A Virtual Public Information Meeting (VPIM) was held for the project on June 25, 2024. The recording of that event can be accessed at the Virtual Public Information Meeting Video Library. Scroll down that page to find the video.

The video is also available on this YouTube Channel. https://www.youtube.com/live/on5CbtNEtFg

Report of Meeting from Virtual Public Information Meeting can be viewed here.

The purpose of the project is to replace the existing 28’-7” long single span bridge with a new 43-foot-long, single span bridge to address the poor condition of the existing bridge substructure due to observed undermining at the scour walls and abutments. This project will also eliminate the scour critical condition and improve the hydraulic performance of the bridge. The existing substandard bridge rail system will be replaced with one that meets current safety standards.

There are right-of-way impacts associated with the proposed improvements including a Partial Take (1 Property), Slope Easements (4 Properties), Temporary Construction Easements (5 Properties), and a Guiderail End Anchorage Installation & Maintenance Easement (1 Property).

The 2-season construction is anticipated to begin Spring 2027 based on the availability of funding, acquisition of rights of way, and approval of permits.  The estimated construction cost for this project is approximately $3,470,000. This project is anticipated to be undertaken with 80% federal funds and 20% state funds.

The Public Meeting Notice can be viewed here.

The proposed project plans can be viewed here.

Additional Information for Public

Voluntary Feedback Survey

After the meeting, we hope you’ll take a few extra minutes to fill out our brief survey.

DOT Office of Equity – Title VI Program

MS-4 Municipal Separate Storm Sewer Systems