For real-time and up to date road closures, construction, lane closures, visit CTroads.org!

CTDOT Construction Advisories
Page 234 of 281
2809 total results
6/2/2020
The Connecticut Department of Transportation is announcing that a resurfacing project will be performed on Route 6 in Bristol, from the Plymouth town line to Sherman Street – Thursday, June 11, through Friday, June 19, 2020.
6/1/2020
The Connecticut Department of Transportation is announcing that a milling and resurfacing project will be performed on a 1.69-segment of Route 178 in Bloomfield from Route 185 to Route 189 – Thursday, June 11 through Friday, June 26, 2020.
5/29/2020
Lane closures will be required for bridge safety inspections and evaluations around Connecticut, June 1 – 5, 2020, weather permitting. View the complete list and plan ahead. (NB and SB mean northbound and southbound; EB and WB mean eastbound and westbound.)
5/29/2020
The Connecticut Department of Transportation is announcing that nighttime line painting will be performed on I-84 eastbound and westbound at various locations from Exit 26 to Exit 8 in Cheshire, Waterbury, Middlebury, Southbury, Newtown, Brookfield, and Danbury. Also, Route 8 northbound and southbound at various locations from Exit 14 to Exit 45 in Derby, Seymour, Ansonia, Beacon Falls, Naugatuck, Waterbury, Watertown, Thomaston, Litchfield, Harwinton, & Torrington.
5/29/2020
The Connecticut Department of Transportation is announcing that a nighttime resurfacing project will be performed on State Road 846 (Watertown Ave) from Route 8 northbound access to Route 73 in Waterbury – Sunday, June 7, through Wednesday, June 17, 2020.