For real-time and up to date road closures, construction, lane closures, visit CTroads.org!
CTDOT Construction Advisories
Page 173 of 281
2809 total results
2809 total results
11/5/2021
11/4/2021
11/4/2021
11/3/2021
11/2/2021
11/2/2021
11/2/2021
Bridge inspection work will be performed on Route 130 (Stratford Avenue) in Bridgeport. Route 130 between Water Street and Route 127 (East Main Street) will be closed to traffic during the inspection process. This project is scheduled to take place on Monday, November 8, 2021 weather permitting.
11/2/2021
The Connecticut Department of Transportation is announcing that full depth reconstruction of Route 136 in Darien will begin on November 10, 2021. The roadway will be reduced to one lane of alternating traffic during working hours Monday through Saturday 6:00 AM to 6:00 PM.
10/29/2021
The Connecticut Department of Transportation is announcing that a bridge joint replacement project will be performed on the Gold Star Memorial Bridge (#3819) on I-95 Northbound over the Thames River in New London.
10/29/2021
The Connecticut Department of Transportation is announcing that a bridge maintenance project will be performed on I-91 South in New Haven.