For real-time and up to date road closures, construction, lane closures, visit CTroads.org!
CTDOT Construction Advisories
Page 127 of 281
2809 total results
2809 total results
3/2/2023
CTDOT is announcing that a safety improvement project will be performed on Route 2 westbound in Colchester and Route 2 eastbound in Marlborough.
3/2/2023
CTDOT is announcing that a left lane closure on I-95 Northbound (Gold Star Memorial Bridge) in New London and Groton will begin on March 5, 2023.
3/2/2023
CTDOT is announcing that overnight road closures of Route 82 over the Connecticut River (East Haddam Swing Bridge) will occur nightly from March 13, 2023, to March 17, 2023.
2/27/2023
CTDOT is announcing that a Rumble Strip Installation project will be performed in March 2023.
2/24/2023
CTDOT is announcing that a Rumble Strip Installation project will be performed on Route 25 Trumbull
2/24/2023
CTDOT is announcing construction work associated with removing the former IMAX building in Norwalk will begin Monday, February 27, 2023.
2/23/2023
CTDOT is announcing daytime bridge repairs will take place starting on Thursday, March 2, 2023 from 8:00 a.m. to 4:00 p.m. on Route 8 northbound and southbound in Harwinton, Torrington from Exit 42 to Exit 45.
2/23/2023
CTDOT is announcing that a bridge hanger and conduit removal operation will require the closure of the left lane northbound and southbound on I-95 at between exits 19 and 20 at the Mill Hill Road overpass in Fairfield.
2/23/2023
CTDOT is announcing that exit numbering will be revised on Route 72 both Eastbound and Westbound from Plainville to New Britain beginning on February 26, 2023, weather permitting.
2/17/2023
CTDOT is announcing that construction work on the I-691 and I-91 Interchange in Meriden will begin February 23, 2023.