For real-time and up to date road closures, construction, lane closures, visit CTroads.org!
CTDOT Construction Advisories
Page 121 of 281
2809 total results
2809 total results
4/20/2023
CTDOT is announcing the application of ultra-thin bonded overlay preservation treatments on various state roads in Cromwell. in District 1: Route 9 Northbound from Route 372 (West St) to .09 miles south of North Rd over Route 9NB, and Route 9 Southbound from .06 miles north of North Rd over Route 9SB
4/19/2023
CTDOT is announcing that an overhead relamping replacement project will be performed on Interstate 95 in Darien/Norwalk by State Forces.
4/18/2023
The Connecticut Department of Transportation (CTDOT) is announcing that a milling and resurfacing project will be performed on Route 10 in Cheshire and Southington from Stoney Hill Road to the beginning of the overpass to Route 322. Body of the Message The Connecticut Department of Transportation CTDOT is announcing that a milling and resurfacing project will be performed on Route 10 in Cheshire and Southington from Stoney Hill Road to the beginning of the overpass to Route 322. The project (DOT01710498CN “C”) consists of milling and resurfacing a 2.96-mile segment of Route 10 This project is scheduled to begin milling by Rafferty on Sunday, April 30, 2023, to Monday, May 8, 2023. The resurfacing segment of this project is anticipated to begin on Monday, May 15, 2023, to Sunday, May 28, 2023, by Tilcon Inc. This project is included in the District 1, Department of Transportation’s 2023 Vendor Resurfacing Program. LANE CLOSURE INFO Motorists can expect lane closures on Route 10 in Cheshire and Southington from Stoney Hill Road to the beginning of the overpass to Route 322. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone. The work schedule for this project is 7:00 p.m. to 5:00 a.m. (Sunday – Thursday). Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions. Motorists are advised to maintain a safe speed when driving in this vicinity.
4/18/2023
4/18/2023
CTDOT is announcing that a milling and resurfacing project will be performed on Route 15 in Wallingford.
4/18/2023
CTDOT is announcing that a milling and resurfacing project will be performed on Route 186 in Somers from Route 190 (Main Street) to the Massachusetts State Line.
4/18/2023
CTDOT is announcing that a milling and resurfacing project will be performed on Service Road 708 in Milford.
4/18/2023
CTDOT is announcing that a milling and resurfacing project will be performed on Route 275 in Coventry and Mansfield from Route 31 (Main Street) to Route 32 (Stafford Road).
4/18/2023
The Connecticut Department of Transportation (CTDOT) is announcing that a milling and resurfacing project will be performed on Route 10 in Cheshire and Southington from Stoney Hill Road to the beginning of the overpass to Route 322.
4/18/2023
CTDOT is announcing that a milling and resurfacing project will be performed on Route 200 in Thompson.