The Connecticut Department of Transportation (CTDOT) is announcing that survey operations will be performed on I-95 in Westport. This project is scheduled to occur on Saturday, April 5 and be completed on Saturday, May 3, 2025. The project 0158-0224PE consists of Pavement Rehab, Guiderail and Roadside Safety Upgrades.
This project is being performed by State Forces.
CTDOT is expected to perform survey options every Saturday through May 17, 2025, between 6:30 a.m. and 2:00 p.m. Please be advised that weather conditions or other circumstances may not allow for the survey work to be performed.
LANE CLOSURE/DETOUR INFO
There will be a moving traffic protection pattern on I-95 from Exit 17 to Exit 19 Saturday, April 5 to Saturday, May 17, 2025, from 6:30 a.m. to 2:00 p.m. Traffic control signing and traffic control signing patterns, CTDOT Crash Trucks will guide motorists through the work zone.
Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions. Motorists are advised to maintain a safe speed when driving in this area.