Project 0050-0224 Webpage

Welcome to the webpage for Project 0050-0224, U.S. Route 1 Road Diet, in the Town of Fairfield. 

The purpose of the project is to enhance safety, mobility, and access for all road users. Within the project limits of this project, U.S. Route 1 will be restriped from a 4-lane roadway to a 3-lane roadway with a center two-way left turn lane. The project will be predominately implemented through resurfacing U.S. Route 1 and restriping the corridor as illustrated in the road diet conceptual pavement marking plan submitted with Project 0170-3480. Additional improvements, such as traffic control signal adjustments and upgrades, sidewalk repairs, sidewalk ramp modifications and upgrades, curb improvements and storm drainage structure top replacements will be incorporated into the project.

Right-of-way impacts associated with the proposed project are not anticipated.

Construction is anticipated to begin Summer 2025 based on the availability of funding and approval of permit(s).  The estimated construction cost for this project is approximately $1,860,000. This project is anticipated to be undertaken with 90% federal funds and 10% state funds.

A Virtual Public Information Meeting (VPIM) was held for the project on April 25, 2024.

The video is available here: Awaiting Upload

 

The proposed project concept plans can be viewed here

 

Questions should be addressed to Customer Care at DOT.customercare@ct.gov. Please include the project number when making inquiries.

 

Additional Information for Public

Voluntary Feedback Survey - After the meeting, we hope you’ll take a few extra minutes to fill out our brief survey.

DOT Office of Equity – Title VI Program

MS-4 Municipal Separate Storm Sewer Systems