The Connecticut Department of Transportation (CTDOT) is announcing a wrong way detection maintenance and recertification will take place on I-84 eastbound at Exits 28, 32, 37, 39, and 56 and westbound at Exits 29, 37, 39, and 56 in East Hartford, Farmington, and Southington. This project is scheduled to start on Monday, April 7, 2025.
The Wrong Way Detection System uses video cameras to detect vehicles that are traveling in the wrong direction. If a vehicle is detected, wrong way signs outlined with multiple sets of red lights are activated and begin flashing to alert the driver they are traveling in the wrong direction. Additionally, the system alerts the CTDOT Highway Operations Center and local State Police Troop barracks in real-time, allowing staff to monitor the activities of the wrong way driver on the ramp.
For more information on CTDOT’s commitment to stopping wrong way drivers, visit https://portal.ct.gov/wrongwaydriving
The work is being performed by TAPCO and Maintenance Contractors
LANE CLOSURE/DETOUR INFO
Motorists can expect ramp closures of I-84 eastbound at Exits 28, 32, 37, 39, and 56 and westbound at Exits 29, 37, 39, and 56 in East Hartford, Farmington, and Southington starting on Monday, April 7, 2025. Traffic control personnel and signing patterns will guide motorists through the work zone. The work schedule for this project is from 6:30 p.m.to 2:30 a.m., Monday to Friday.
Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions. Motorists are advised to maintain a safe speed when driving in this area.