The milling segment for this project is scheduled for Monday, April 11, 2022 through Wednesday, April 13, 2022.
This performed on Route 78 in Stonington. The project consists of milling a 0.86-mile segment of Route 78 in Stonington. project is included in the Department of Transportation’s 2022 Vendor Resurfacing Program.
The Connecticut Department of Transportation (CTDOT) is announcing that a roadway milling project will be LANE CLOSURE INFO:
Motorists can expect lane closures to occur on Route 78 from Route 2 to the Rhode Island state line. The regular work schedule for this project is Monday through Wednesday between 7 a.m. and 4 p.m. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone.
Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions. Motorists are advised to maintain a safe speed when driving in this vicinity.