The Connecticut Department of Transportation is announcing that epoxy painting will be performed on multiple routes throughout Western Connecticut.
The project consists of repainting of epoxy paint lines on multiple routes. The upgrades are scheduled to begin about Monday, May 1, 2022 and continue through Saturday, October 1, 2022.
LANE CLOSURE INFO
Motorists can expect lane closures. The night work schedule for this project is 7 p.m. to 5 a.m. (Sunday – Thursday) with a rain day of Friday. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone.
Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions. Motorists are advised to maintain a safe speed when driving in this vicinity.