The Connecticut Department of Transportation (CTDOT) is announcing that a drainage pipe rehabilitation operation will require the closure of the left lane and right shoulder on I-95 Northbound X-43 in the town of West Haven.
The Drainage Pipe Rehabilitation operation will be performed in West Haven on the northbound side of I-95 Exit 43 West Haven. The night work is scheduled to occur the evening of Thursday July 14, 2022 through the morning of Friday July 15, 2022.
The Drainage Pipe Rehabilitation operation will be performed by National Water Main Cleaning.
LANE CLOSURE INFO
Motorists can expect Left Lane and Right Shoulder closure to occur on I-95 Northbound in the Town of West Haven. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone. The night work schedule for this project is from 8:00 p.m. to 5:00 a.m. (Thursday night through Friday morning).
Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions. Motorists are advised to maintain a safe speed when driving in this vicinity.