The Connecticut Department of Transportation (CTDOT) is announcing the start of work for the replacement of Bridge No. 02100 on Route 154 over Bible Rock Brook in the Town of Middletown on April 1, 2022.
This project consists of replacing the bridge with a new three-sided precast structure, new wing walls, footings, and approaches.
DOT Project No. 0082-0321 was awarded to Spazzarini Construction Company, LLC at a cost of $1,578,979.00 on March 4, 2022, and is scheduled to be completed on November 30, 2022. This project is administered by the Bureau of Engineering and Construction, Office of Construction, District 1 in Rocky Hill.
LANE CLOSURE INFORMATION
Motorists can expect traffic operation impacts on U.S. Route 154 (Saybrook Road) in Middletown Monday through Friday between 9 a.m. and 3 p.m. and 6 p.m. and 6 a.m. Additional operation impacts may occur Saturday and Sunday between 6 p.m. and 10 a.m.
During the actual bridge replacement, one-way traffic operation will be implemented using temporary signalization.