The Connecticut Department of Transportation is announcing that a thin surface pavement treatment project will occur on Route 4 in Sharon from Old Sharon Road No. 1 to Route 7. Work is scheduled to occur on Tuesday, September 21, 2021, through Friday, September 24, 2021.
Motorists can expect delays and one-lane alternating Traffic. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone. The regular work schedule for this project is 7:00 a.m. to 4:00 p.m. (Monday through Friday).
Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions. Motorists are advised to remain alert, drive cautiously, and to maintain a safe speed when driving in this vicinity.