The Connecticut Department of Transportation is announcing that a surveying operation will be performed on I-95 southbound at the Exit 15 overpass and at the I-95 Route 7 overpass, north and southbound, in Norwalk on Saturday and Sunday, March 6 and 7, 2021.
This surveying operation will be performed by state forces.
Motorists can expect lane closures on I-95 north and southbound in Norwalk in the vicinity of Exit 15. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone. The regular work schedule for this project is from 7:30 a.m. to 2:30 p.m.
Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions. Motorists are advised to maintain a safe speed when driving in this vicinity.