The project consists of:
- Construction of access roads
- Diverting water through temporary bypass
- Repair existing pipe
- Install pipe liner through existing pipe
DOT Project No. 0173-0415 was awarded to Guerrera Construction Company, Inc. at a cost of $1,339,163.25 on October 19, 2021 and is scheduled to be completed October 10, 2022. This project is administered by District 3 Construction, New Haven.
LANE CLOSURE INFO
Route 25 NB
Monday – Friday between 7:00 p.m. - 5:00 a.m. and 9:00 a.m. - 2:00 p.m.
Saturday - Sunday 24-hour lane closure allowed
Route 25 SB
Monday – Friday between 7:00 p.m. - 5:00 a.m. and 9:00 a.m. - 2:00 p.m.
Saturday - Sunday 24-hour lane closure allowed