The project consists of Asphaltic Joint Installation to the I-91 South Bridge #’s 03039 over I-95 Ramp 317, 03041 over Chapel St. in New Haven. This project is scheduled to occur the evening of Thursday October 28, 2021 to the morning of Friday, November 12, 2021.
The work is included in the Department of Transportation’s 2021 bridge maintenance program to support state forces with bridge repairs and is being performed by Dynamic Surface Applications.
LANE CLOSURE INFO
Motorists can expect lane closures on I-91 South between Exit 2 (Hamilton St.) and Exit 1 (MLK Blvd./Downtown New Haven) in New Haven. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone. The night work schedule for this project is from 8:00pm to 5:00am. (Monday evenings through Friday mornings).
Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions. Motorists are advised to maintain a safe speed when driving in this vicinity.