Skip to Content Skip to Chat
Report an accessibility issue.
There are no tolls in Connecticut and CTDOT will never solicit you to pay a toll fee.
CT.gov State of Connecticut
×
 
Close Search
  • Arabic
  • Chinese (Simplified)
  • Chinese (Traditional)
  • English
  • French
  • German
  • Haitian Creole
  • Hindi
  • Italian
  • Korean
  • Pashto
  • Polish
  • Portuguese Brazil
  • Russian
  • Spanish
  • Filipino
  • Ukrainian
  • Vietnamese
Department of Transportation
Department of Transportation logo
Department of Transportation
  • Facebook
  • X
  • Linkedin
  • YouTube
Department of Transportation
☰ Department of Transportation Main Menu
× Close
⮐ Back
⮐ Back
  • Home
  • Travel Gateway
    • Roads & Highways
      • Park & Ride
      • Parkway Restrictions
      • Rest Areas
      • Traffic Monitoring Data
      • Transportation Maps
    • Motorcycle resources
      • CONREP
    • Public Transportation
      • CT Buses
      • CT Ferries
      • CT Rail
      • CTDOT Ridesharing
    • Bicycle & Pedestrian resources
  • Business
    • Resources
      • Consultant Resources
      • Contractor Resources
      • Disadvantaged Business Enterprise (DBE)
    • Contracting & Project Awards
    • Equal Opportunity & Diversity
    • Title VI/Office of Equity
    • Manuals
    • Permits
  • Careers
    • Find a job
  • Bureaus
    • Commissioner
    • Engineering & Construction
    • Finance & Administration
    • Operations & Maintenance
    • Policy & Planning
    • Public Transportation
  • News
    • Construction Advisories
    • Press Releases
    • Upcoming Meetings
  • Programs
  • Projects & Initiatives
    • Active Projects
    • Get Involved
    • Major Projects & Initiatives
  • FAQ
  • About
    • Branding
    • Resources
    • Contact
      • Report An Issue
      • Email Alerts Signup
      • Submit An FOI Request
      • Media Inquiry
      • Submit a Claim

You are about to Logout

Are you sure you want to log out of your account? If you do want to logout, please click "Logout".
Logout
Press Release Homepage
CTDOT Construction Advisories Header graphic

Closure: I-95 Southbound Ramps at Exit 17 and Saugatuck Avenue (Route 33) in Westport

Share:

facebook logo Facebook
twitter logo Twitter
10/26/2023

The Connecticut Department of Transportation (CTDOT) is announcing the scheduled closure and detour of I-95 southbound, Saugatuck Avenue (Route 33), on and off-ramps to I-95 northbound and I-95 southbound off-ramp at Exit 17 in Westport from 8:00 p.m. Friday, November 3 through 6:00 a.m. Monday, November 6, 2023.

I-95 southbound, Saugatuck Avenue and ramp closures are necessary for the new I-95 southbound bridge to be slid into place using Accelerated Bridge Construction techniques. A new I-95 southbound bridge is already constructed on temporary supports adjacent to the existing I-95 southbound bridge. The old bridge will be demolished in place and the new bridge will be installed at the same location under an Accelerated Bridge Construction technique called “Bridge Slide”.

I-95 southbound will be closed, and two lanes of I-95 southbound traffic will be crossed over on the new I-95 northbound bridge with positive channelizing devices, thus severely impacting traffic flow on both I-95 southbound and I-95 northbound throughout the whole weekend. Motorists are strongly advised not to drive through this area for the entire weekend. The on-ramp to I-95 northbound at Exit 17 has been closed to traffic since October 16 and will remain shut during the weekend of November 3 through November 6. The Exit 17 off-ramps from I-95 northbound and I-95 southbound will also be closed to traffic during this weekend to facilitate the I-95 southbound bridge construction. Saugatuck Avenue (Route 33) will also be closed to both motorists and pedestrians between the on and off-ramps at this location. The on-ramp to I-95 southbound at Exit 17 will remain open.

CTDOT Project No. 0102-0295 was awarded to Yonkers Contracting Company, Inc. at a cost of $103,411,848 on April 30, 2022, and is scheduled to be completed on November 1, 2024. This project is administered by the Bureau of Engineering and Construction, Office of Construction, District 3 in New Haven.

 

DETOUR INFO:

I-95 SB at Exit 17:

Two lanes of I-95 southbound traffic will be crossed over onto to the new I-95 northbound side with positive separation by channelizing devices. Traffic flow will be severely impacted in both directions.

 

I-95 NB On Ramp at Exit 17:

Traffic will be detoured to Saugatuck Avenue to Riverside Avenue to Route 1, then to the Sherwood Island Connector and onto I-95 northbound at Exit 18.

 

I-95 NB Off Ramp at Exit 17:

Traffic will be detoured to Exit 18 to Sherwood Island Connector onto Route 1 to Riverside Avenue to Saugatuck Avenue.

 

I-95 SB Off Ramp at Exit 17:

Traffic will be detoured to Exit 18 to Sherwood Island Connector onto Route 1 to Riverside Avenue to Saugatuck Avenue.

 

Saugatuck Avenue at Exit 17:

Traffic will be detoured to Park Street onto Franklin Street and to Saugatuck Avenue. Pedestrians will also use the same detour.

 

 

Media Contact:

FOR MORE INFORMATION:
860-594-2560
DOT.CustomerCare@ct.gov
Operating Hours: Monday - Friday 8:00 a.m. to 4:30 p.m.

 

Share this information on:

Department of Transportation
Facebook X Linkedin YouTube

Mailing address
2800 Berlin Turnpike
P.O. Box 317546
Newington CT 06131-7546

Report an Issue or Ask a Question
860-594-2560
DOT.CustomerCare@ct.gov
Online Webform
ct.gov logo with flag embelishment
  • About CT
  • Policies
  • Accessibility
  • Directories
  • Social Media
  • For State Employees
US Flag Status icon
United States
Mast: (Full)
CT Flag Status icon
Connecticut
Mast: (Full)

© 2025 CT.gov - Connecticut's Official State Website