Interactive Map
Frequently Asked Questions (FAQs)
Exit numbers will be determined based on the mileage contained in the CTDOT Linear Referencing System. Mileage typically runs from south to north and west to east.
- No Exit 0
- Mileage 0.00 - 1.49 = Exit 1
- Mileage 1.50 - 2.99 = Exit 2
- Mileage 3.00 – 3.99 and beyond.
- + Round down to the nearest whole mile
- CTDOT may round up or down to the next nearest whole mile to reduce suffix letters or utilize the existing exit number.
- Splits on off-ramps will not be designated as separate numbers/suffix letters.
National Uniformity
- Same exit numbering system as almost every other state
Driver friendly navigation
- Allows drivers to quickly determine distances to destinations
- Easier to calculate miles traveled
More accurate emergency response
- Improves reporting of highway incidents, resulting in better navigation of emergency services
Easier to add future exits without renumbering entire corridor
CTDOT issues a press release during the design phase of each corridor sign replacement project. CTDOT then reaches out to the highest elected official in each of the municipalities directly impacted by the numbering change and provides a link to the press release which contains the future numbering. This communication allows municipalities to inform local business and emergency services of the upcoming change.
As construction commences, CTDOT will publish another press release relating to the project. At least two (2) weeks prior to the renumbering occurring, portable changeable message signs will be installed notifying drivers of the upcoming revision. As the numbers are revised, the “OLD EXIT” numbers will be posted at select locations throughout the corridor, typically for 2 years. The changeover takes about 1-6 weeks per route depending on the length of the route and the complexity with revising the numbers, such as the quantity of overhead vs side mounted signs.
CTDOT will coordinate the changes with the various GPS companies (Waze, Apple, Google, Garmin, etc).
Exit sign panels will look the same, just the numbers themselves will change. “OLD EXIT” signs will typically have a yellow background with black lettering and will be installed at key locations for a minimum of 2 years. ”OLD EXIT” signs on the Merritt Parkway will have a green background with white lettering.
The images at the end of this document are examples of what you can expect to see after the numbers have been revised in future projects. The “OLD EXIT” signs will be removed approximately 2 years after installation. Actual installation may be slightly different as adjustments may be needed during field installation.
New exit numbers will be provided when signs are replaced in corridor sign projects. Projects are programmed based on need when signs reach or exceed their useful service life. The list below includes major routes only and the year is the approximate construction completion year. Please note that the schedule is subject to change.
- CT-2: January 7, 2025
- CT-8: Completed 2024
- CT-9: Completed 2023
- CT-15: 2025
- I-84: 2026
- I-91: 2027
- I-95: 2028
- I-291: 2025
- I-384: Completed 2024
- I-395: Completed 2015
- I-691: Completed 2023