The Connecticut Department of Transportation (CTDOT) is developing plans for the replacements of the oil-water separators at CTDOT’s weigh station on I-84 in Union and underground storage tanks at the CTDOT Maintenance Facility off Route 6 in Bolton.
The purpose of this project is to upgrade the storage tanks to comply with the Department of Energy and Environmental Protection’s regulations.
This project involves the replacement of the fuel oil underground storage tank with an aboveground storage tank, potable water underground storage tank, wastewater underground storage tank, the installation of a diesel exhaust fluid tank adjacent to the existing motor fueling station, and the installation of a building standby generator.
The present schedule indicates that final design plans will be available in September 2024. The project will be 100 percent (100%) state funded.
It is the CTDOT’s policy to keep the public informed when such projects are undertaken and important that the community share their concerns to assist in the project's development. If anyone has any questions or comments on this project, contact Mr. Adam G. Fox, Principal Engineer, at (860) 594-3298 or by e-mail at adam.fox@ct.gov. Please make reference to State Project No. 0171-0503.