CTDOT Press Releases

CTDOT Press Release Header graphic

01/23/2024

Installations and Revisions of Traffic Control Signals in Bethany, Bridgeport, Monroe, New Haven, Trumbull, Fairfield, Norwalk, and Wilton.

The Connecticut Department of Transportation (CTDOT) is developing plans to upgrade existing traffic control signal equipment or install new traffic control signal equipment to meet current CTDOT standards in Bethany, Bridgeport, Monroe, New Haven, Trumbull, Fairfield, Norwalk, and Wilton. At applicable locations, pedestrian control features (countdown pedestrian indications, accessible pushbuttons, sidewalk ramps) will be upgraded in an effort to improve accessibility and pedestrian safety. The CTDOT will coordinate with the city or town during the design phase. The following intersections are included:


Traffic Control Signal – New Signal

Project

Town/City

Area

 

059-231

Guilford

Route 77 (Durham Rd.) at Flat Meadow Rd.

 

Traffic Control Signal – Full Replacement:

Project

Town/City

Area

 

008-204

Bethany

Route 42 (Cheshire Rd.) at Route 69 (Carrington Rd.)

 

015-222

Bridgeport

U.S. Route 1 (Boston Ave.) at Pembroke St.

 

015-227

Bridgeport

U.S. Route 1 (Boston Ave.) at Central Ave. and Palisade Ave.

 

084-202

Monroe

Route 111 (Monroe Tpke.) at Purdy Hill Rd.

 

092-299

New Haven

Route 80 (Foxon Blvd.) at New Haven Plaza Driveway

 

144-206

Trumbull

State Road 731 (Main St.) at Trumbull Shopping Park Driveway

 

144-214

Trumbull

Route 127 (White Plains Rd.) at State Road 734 (Daniels Farm Rd.)

 

144-218

Trumbull

Route 127 (White Plains Rd.) at Trumbull Center and Bank of America Driveway

 

144-221

Trumbull

Route 127 (White Plains Rd.) at Reservoir Ave.

 

Traffic Control Signal – Partial Replacement (pedestrian facility upgrades):

Project

Town/City

Area

 

015-221

Bridgeport

U.S. Route 1 (Boston Ave.) at Bayview Shopping Plaza

050-236

Fairfield

Route 58 (Tunxis Hill Cut-Off) at Knapps Highway and Tunxis Hill Rd.

 

102-217

Norwalk

U.S. Route 1 (Westport Ave.) at George Avenue and Drive to Shopping Center

 

102-249

Norwalk

U.S. Route 1 (Westport Ave.) at Dry Hill Rd. and Stew Leonard’s Driveway

 

161-216

Wilton

U.S. Route 7 and Route 33 (Norwalk-Danbury Rd.) at Cricket Lane, Town Hall, Old Highway, and Old Ridgefield Rd.

 

 

 

Traffic Control Signal – Partial Replacement (controller upgrades):

Project

Town/City

Area

 

161-202

Wilton

U.S. Route 7 (Norwalk-Danbury Rd.) at Route 33 (Westport Rd. and Norwalk-Danbury Rd.)

 

161-203

Wilton

U.S. Route 7 and Route 33/U.S. Route 7 (Norwalk-Danbury Rd.) at Route 33 (Ridgefield Rd.) and Crossways Plaza Drive

 

161-207

Wilton

U.S. Route 7 (Norwalk-Danbury Rd.) at School Road and Wilton Plaza

 

161-208

Wilton

U.S. Route 7 (Norwalk-Danbury Rd.) at Drives to Wilton High School and Kiwanis Park

 

161-215

Wilton

U.S. Route 7 and Route 33 (Norwalk-Danbury Rd.) at Route 106 (Wolfpit Rd.) South Junction

 

161-217

Wilton

Route 33 (Westport Rd.) at Drive to 10/20 Westport Rd. and Lambert - Commons

 

161-223

Wilton

U.S. Route 7 (Norwalk-Danbury Rd.) at Station Access Rd.

161-230

Wilton

U.S. Route 7 and Route 33 (Norwalk-Danbury Rd.) at Route 106 North Junction (Sharp Hill Rd.) and Private Drive

 

161-231

Wilton

U.S. Route 7 (Norwalk-Danbury Rd.) at Cannon Rd. and Olmstead Hill Rd.

 

It’s important to CTDOT to ensure the public’s feedback and thoughts are heard and included.

The design plans for this project are expected to be completed in April 2025 with a tentative advertising date of June 2025. Anyone interested in requesting information on the project may do so by contacting Gregory R. Palmer, Project Manager at (860) 594-2748 or via email at Gregory.Palmer@ct.gov. Please refer to Project No. 0173-0531.



FOR MEDIA INQUIRIES:
OFFICE OF COMMUNICATIONS
860-594-3062
CTDOTMedia@ct.gov

Twitter: @CTDOTOfficial
Facebook: Connecticut Department of Transportation

 

Share this information on: