The Connecticut Department of Transportation (CTDOT) is developing plans to upgrade existing traffic control signal equipment or install new traffic control signal equipment to meet current CTDOT standards in Bethany, Bridgeport, Monroe, New Haven, Trumbull, Fairfield, Norwalk, and Wilton. At applicable locations, pedestrian control features (countdown pedestrian indications, accessible pushbuttons, sidewalk ramps) will be upgraded in an effort to improve accessibility and pedestrian safety. The CTDOT will coordinate with the city or town during the design phase. The following intersections are included:
Traffic Control Signal – New Signal
Project |
Town/City |
Area
|
059-231 |
Guilford |
Route 77 (Durham Rd.) at Flat Meadow Rd. |
Traffic Control Signal – Full Replacement:
Project |
Town/City |
Area
|
008-204 |
Bethany |
Route 42 (Cheshire Rd.) at Route 69 (Carrington Rd.)
|
015-222 |
Bridgeport |
U.S. Route 1 (Boston Ave.) at Pembroke St.
|
015-227 |
Bridgeport |
U.S. Route 1 (Boston Ave.) at Central Ave. and Palisade Ave.
|
084-202 |
Monroe |
Route 111 (Monroe Tpke.) at Purdy Hill Rd.
|
092-299 |
New Haven |
Route 80 (Foxon Blvd.) at New Haven Plaza Driveway
|
144-206 |
Trumbull |
State Road 731 (Main St.) at Trumbull Shopping Park Driveway
|
144-214 |
Trumbull |
Route 127 (White Plains Rd.) at State Road 734 (Daniels Farm Rd.)
|
144-218 |
Trumbull |
Route 127 (White Plains Rd.) at Trumbull Center and Bank of America Driveway
|
144-221 |
Trumbull |
Route 127 (White Plains Rd.) at Reservoir Ave. |
Traffic Control Signal – Partial Replacement (pedestrian facility upgrades):
Project |
Town/City |
Area
|
015-221 |
Bridgeport |
U.S. Route 1 (Boston Ave.) at Bayview Shopping Plaza |
050-236 |
Fairfield |
Route 58 (Tunxis Hill Cut-Off) at Knapps Highway and Tunxis Hill Rd.
|
102-217 |
Norwalk |
U.S. Route 1 (Westport Ave.) at George Avenue and Drive to Shopping Center
|
102-249 |
Norwalk |
U.S. Route 1 (Westport Ave.) at Dry Hill Rd. and Stew Leonard’s Driveway
|
161-216 |
Wilton |
U.S. Route 7 and Route 33 (Norwalk-Danbury Rd.) at Cricket Lane, Town Hall, Old Highway, and Old Ridgefield Rd.
|
Traffic Control Signal – Partial Replacement (controller upgrades):
Project |
Town/City |
Area
|
161-202 |
Wilton |
U.S. Route 7 (Norwalk-Danbury Rd.) at Route 33 (Westport Rd. and Norwalk-Danbury Rd.)
|
161-203 |
Wilton |
U.S. Route 7 and Route 33/U.S. Route 7 (Norwalk-Danbury Rd.) at Route 33 (Ridgefield Rd.) and Crossways Plaza Drive
|
161-207 |
Wilton |
U.S. Route 7 (Norwalk-Danbury Rd.) at School Road and Wilton Plaza
|
161-208 |
Wilton |
U.S. Route 7 (Norwalk-Danbury Rd.) at Drives to Wilton High School and Kiwanis Park
|
161-215 |
Wilton |
U.S. Route 7 and Route 33 (Norwalk-Danbury Rd.) at Route 106 (Wolfpit Rd.) South Junction
|
161-217 |
Wilton |
Route 33 (Westport Rd.) at Drive to 10/20 Westport Rd. and Lambert - Commons
|
161-223 |
Wilton |
U.S. Route 7 (Norwalk-Danbury Rd.) at Station Access Rd. |
161-230 |
Wilton |
U.S. Route 7 and Route 33 (Norwalk-Danbury Rd.) at Route 106 North Junction (Sharp Hill Rd.) and Private Drive
|
161-231 |
Wilton |
U.S. Route 7 (Norwalk-Danbury Rd.) at Cannon Rd. and Olmstead Hill Rd. |
It’s important to CTDOT to ensure the public’s feedback and thoughts are heard and included.
The design plans for this project are expected to be completed in April 2025 with a tentative advertising date of June 2025. Anyone interested in requesting information on the project may do so by contacting Gregory R. Palmer, Project Manager at (860) 594-2748 or via email at Gregory.Palmer@ct.gov. Please refer to Project No. 0173-0531.