The Connecticut Department of Transportation is announcing that a milling and resurfacing project will be performed on Route 69 from the Mad River Overpass to .02 Miles north of North Street in Wolcott.
The project consists of milling and resurfacing a 2.67-mile segment of Route 69 from the Mad River Overpass to .02 Miles north of North Street, in Wolcott. This project is scheduled to begin milling from Friday, April 23, 2021, to Friday, April 30, 2021. The resurfacing segment of this project is anticipated to occur from Monday, May 3, 2021 to Wednesday, May 12, 2021.
This project is included in the Department of Transportation’s 2021 Vendor Resurfacing Program.
Motorists can expect lane closures on Route 69 from the Mad River Overpass to .02 Miles north of North Street, in Wolcott. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone. The regular work schedule for this project is 7:00 a.m. to 4:00 p.m. (Monday – Friday).
Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions. Motorists are advised to remain alert, drive cautiously, and to maintain a safe speed when driving in this vicinity.