The Connecticut Department of Transportation is announcing that joint and crack sealing will be performed on Route 79 in Madison.
The project consists of filling joints and cracks on Route 79 in Madison. This work will be performed beginning on Monday, May 24, 2021, through Friday, May 28, 2021.
Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone. Motorists can expect lane closures on Route 79 in Madison from US 1 (Boston Post Road) to Whitman Road. The work schedule is 7:00 a.m. to 4:00 p.m. (Monday through Friday).
Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions. Motorists are advised to remain alert, drive cautiously, and to maintain a safe speed when driving in this vicinity.