Welcome to the webpage for Project 0057-0123, Replacement of Bridge No. 00293 over Bishop Crossing Road, in Griswold.
A public informational meeting for the project will be held on Wednesday, October 25, 2023 at 7:00 p.m. in Griswold Town Hall. The recording of that event can be accessed at the CTDOT Virtual Public Information Meeting Video Library.
The purpose of the project is to replace the existing bridge. Replacement is required based on the findings of the latest Bridge Inspection Report. The proposed structure is a single span steel girder superstructure with curb-to-curb width of 102 feet 2 inches and a span length of 68 feet. The superstructure will be supported on GRS-IBS abutments.
Right-of-way impacts associated with the proposed project are not anticipated.
Construction is anticipated to begin SPRING 2026 based on the availability of funding, acquisition of rights of way, and approval of permit(s). The estimated construction cost for this project is approximately $10.2 million. This project is anticipated to be undertaken with 90% federal funds and 10% state funds.
The project documents can be found below:
Questions should be addressed to Customer Care at DOT.customercare@ct.gov. Please include the project number when making inquiries.
Additional Information for Public
Voluntary Feedback Survey - After the meeting, we hope you’ll take a few extra minutes to fill out our brief survey.