General Permit to Discharge from Subsurface Sewage Disposal Systems Serving Existing Facilities
Notice of tentative decision to issue the General Permit to Discharge from Subsurface Sewage Disposal Systems Serving Existing Facilities which will require registration for eligible discharges, treatment of wastewater as may be required, monitoring of wastewater discharges, and compliance with effluent limitations, permit conditions and best management practices. Written comments are due by August 21, 2021.
-
General Permit for the Discharge of Swimming Pool Wastewater
Notice of tentative decision to reissue the General Permit for the Discharge of Swimming Pool Wastewater to protect waters of the state from discharges associated with swimming pool maintenance and draining from public pools and private residential pools. Written comments are due by August 9, 2021.
-
Mount Sinai Medical Center, NY
Notice of tentative determination, subject to public comment or other information, to approve an application for the renewal of Mount Sinai Medical Center’s Title V permit located in Manhattan. Written comments due by June 5, 2026.
-
Mason Industries, Inc., Hauppauge, NY
Notice of tentative determination to renew the Air Title V permit for Mason Industries, Inc., in NY. Written comments are due by June 12, 2026.
-
Dodson Boatyard, LLC, Stonington (202509093-SDF)
Notice of tentative determination to approve an application submitted by Dodson Boatyard, LLC for proposed activity that includes the removal of existing moorings and the installation of new fixed and floating docks. This activity will affect coastal resources. Written comments due by May 14, 2026.
-
New York Power Authority-Brentwood Plant, Islip NY
Notice of tentative determination to approve an application to renew the Air Title IV and V permits for New York Power Authority, Brentwood Plant in Islip NY. Written comments are due by June 22, 2026.
-
Notice of tentative determination to approve an application submitted by Oak Ridge for a permit to construct and operate a volume reduction plant, transfer station and intermediate processing facility. Written comments due by June 14, 2026.
-
Notice of tentative determination to approve an application submitted by Milford Power Company, LLC for the renewal of a combined Title IV and Title V permit. Written comments are due June 11, 2026.
-
United Aluminum Corporation, North Haven
Notice of tentative determination to approve an application submitted by United Aluminum Corporation for renewal of a Title V permit. Written comments are due by March 17, 2026.
-
Milford Power Company, LLC - DIV-202510001
Notice of tentative determination to approve an application submitted by Milford Power Company, LLC for proposed activity that includes the withdraw up to 8.0 Million gallons per day from the Housatonic River. This activity will affect the Housatonic River. Written comments due by May 7, 2026.
-
Notice of tentative determination to approve an application submitted by Polly-Rob LLC to construct and operate a compost facility. Written comments due February 8, 2026.
-
Wieland Rolled Products North America, LLC, Waterbury
Notice of tentative determination to approve an application submitted by Wieland Rolled Products North America LLC for a New Source Review permit. Written comments are due by February 15, 2026.
-
Southeastern Connecticut Regional Resources Recovery Authority, Preston
Notice of tentative determination to approve an application submitted by Southeastern Connecticut Regional Resources Recovery Authority to construct and operate a solid waste facility. Written comments due February 14, 2026.
-
Smart Feed Tech., Inc. (dba Bright Feeds), Berlin
Notice of tentative determination to approve an application submitted by Smart Feed Tech., Inc. dba Bright Feeds for a New Source Review Permit. Written comments are due by May 9, 2026.
-
Notice of tentative determination to approve an application for a permit submitted by Pfizer Inc. to discharge at a maximum of 750,000 gallons per day of blowdown from heating and cooling equipment, hydrostatic pressure testing, non-contact cooling water, stormwater, water production wastewater, and miscellaneous wastewaters to the Thames River from the on-site power plant that provides steam and electricity for heating, ventilation, and air conditioning at a research and development facility. Written comments due by March 3, 2026.