Development & Management Plan

D&M Process
Prior to constructing the transmission line approved by the Connecticut Siting Council (Council)in Docket 272, United Illuminating (UI) and Connecticut Light & Power (CL&P) must submit for Council approval plans showing construction details. These plans are called Development and Management Plans. Each of the two applicants in this proceeding will be responsible for constructing that portion of the project for which it is responsible, and each applicant will therefore submit D&M plans for its respective part of the project. Due to its scope, this project will be broken down into segments, and each segment will require its own, separate D&M plan. The schedule in which these separate plans will be submitted to the Council is explained in this letter. 
The towns that will be affected by the different segments are:
Segment 1
   Middletown, Haddam, Durham, Middlefield, Meriden, 
   Wallingford
Segment 2
   Wallingford, Cheshire, Hamden, Bethany, Woodbridge,
   Orange, West Haven, Milford
Segment 3
   Milford, Stratford, Bridgeport
Segment 4
   Bridgeport, Fairfield, Westport, Norwalk
Singer Substation - UI:
UI Segment 3 - Singer Substation to Housatonic River West Bank:
UI D&M Plan for Section between Singer Substation and Housatonic River West Bank
(Appendices for this plan are too large to be posted on this website; they may be inspected at the Siting Council office.)
Scovill Rock Switching Station:
Segment 4a:
D&M Plan for Singer Substation to Fairfield/Westport Town Line Segment
(Vol. 1 of 3 available on website; Vol. 2, Plan and Profile Drawings, and Vol. 3, Traffic Inventory Report for Maintenance and Protection of Traffic, are too large to be uploaded to website; plans are available at CSC office)
Segment 4a Revisions:
Segment 4a Revisions:
Beseck Switching Station:
Segment 1a - Scovill Rock to Chestnut Junction, Oxbow Junction to Beseck Switching Station, Black Pond Junction to Beseck Switching Station:
Segment 1b: Royal Oak Bypass
Revised Plan for Segment 1b: Royal Oak Bypass - 6/16/06
Segment 3: East Devon Substation to Housatonic River Crossing
East Devon Substation
Segment 2a: Beseck Switching Station to Cheshire/Hamden Town Line
Segment 2b: Cheshire/Hamden Town Line to East Devon Substation
Segment 4b: Sasco Creek to Father Conlon Place, Norwalk
Application to Modify Underground Route through Norwalk (NU Water Crossing)
UI River Crossings:  Bridgeport to Stratford
CL&P Watercourse & Railroad Crossings:  Milford, Stratford, Bridgeport, Fairfield & Westport