KILLINGLY

DOCKET NO. 96 - Killingly Energy Limited Partnership Certificate for the construction of a 32.2 MW (net) wood burning electric generating facility in Killingly. (Findings of Fact)(Opinion)(Dissenting Opinion), and  (Decision and Order).

DOCKET NO. 157 - Department of Public Safety, Division of State Police Certificate for telecommunications facilities located in Sterling, Thompson, south of Westcott Road behind Troop D Barracks in Killingly, and Brooklyn. (Findings of Fact)(Opinion),  and  (Decision and Order).

DOCKET NO. 189 - Lake Road Generating Company, LLC Certificate of Environmental Compatibility and Public Need for an electric generating project located off of Lake Road in Killingly, Connecticut. (Findings of Fact), (Opinion), and (Decision and Order)

DOCKET NO. 189A - Lake Road Generating Company, LLC Certificate of Environmental Compatibility and Public Need for the Lake Road Generating Project located off of Lake Road, Killingly, Connecticut. Reopening of this docket pursuant to Connecticut General Statutes § 4-181a(b) to Modify the Decision and Order in Docket 189 to Allow Lake Road Generating Company to Suspend its Backup Fuel System Based on Changed Conditions.   (Record.) (Findings of Fact), (Opinion), and (Decision and Order).

DOCKET NO. 283 - AT&T Wireless PCS, LLC d/b/a AT&T Wireless application for a Certificate of Environmental Compatibility and Public need for the construction, maintenance and operation of a wireless telecommunications facility in Killingly, Connecticut. (Findings of Fact),  (Opinion), and (Decision and Order).

DOCKET NO. 302 - Northeast Utilities Service Company, on behalf of The Connecticut Light and Power Company (CL&P) application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance and operation of the proposed Killingly 2G Substation at 193 Tracy Road and 227-257 Park Road in the Towns of Killingly and Putnam, and the proposed connections to the existing #347 345-kV line and the existing #1607 and #1505 115-kV lines. (Findings of Fact),  (Opinion),  and  (Decision and Order).

DOCKET NO. 424 - The Connecticut Light & Power Company application for a Certificate of Environmental Compatibility and Public Need for the Connecticut portion of the Interstate Reliability Project that traverses the municipalities of Lebanon, Columbia, Coventry, Mansfield, Chaplin, Hampton, Brooklyn, Pomfret, Killingly, Putnam, Thompson, and Windham, which consists of (a) new overhead 345-kV electric transmission lines and associated facilities extending between CL&P’s Card Street Substation in the Town of Lebanon, Lake Road Switching Station in the Town of Killingly, and the Connecticut/Rhode Island border in the Town of Thompson; and (b) related additions at CL&P’s existing Card Street Substation, Lake Road Switching Station, and Killingly Substation.  (Record), Findings of Fact Cover  Findings of Fact Table of Contents   Findings of Fact,  Findings of Fact AppendixOpinion,Errata to Findings and Opinion,  Decision and Order.

DOCKET NO. 469 – Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at Killingly Tax Assessor’s Map 143, Lot 6, 520 Bailey Hill Road, Killingly, Connecticut. (Findings of Fact), (Opinion), (Decision and Order).

DOCKET NO. 470 - NTE Connecticut, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a 550-megawatt dual-fuel combined cycle electric generating facility and associated electrical interconnection switchyard located at 180 and 189 Lake Road, Killingly, Connecticut. (Findings of Fact),  (Opinion),  (Decision and Order).

DOCKET NO. 470B – NTE Connecticut, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a 550-megawatt dual-fuel combined cycle electric generating facility and associated electrical interconnection switchyard located  at 180 and 189 Lake Road, Killingly, Connecticut.  Reopening of this application based on changed conditions pursuant to Connecticut General Statutes §4-181a(b). (Findings of Fact),  (Opinion),  (Decision and Order)

PETITION NO. 216 - DENIED 8/19/88 , became Docket No. 96.

PETITION NO. 236 - Killingly Energy Limited Partnership (KELP) petition for a proposed interconnection line from the KELP facility to the Connecticut Light and Power Company electrical system. Staff Report.  Approved 11/22/89

PETITION NO. 415 - Lake Road Generating Company, L.P. petition that no Certificate of Environmental Compatibility and Public Need is required for the installation of the proposed electric interconnection transmission line tap with an existing 345-kV Card Street - Sherman Road electric transmission line in Killingly. Staff Report.  Approved 5/24/99

PETITION NO. 416 - Algonquin Gas Transmission Company petition that no Certificate of Environmental Compatibility and Public Need is required for the 1.8 mile extension of an interstate natural gas transmission line in the Towns of Putnam and Killingly. Staff Report 1.   Staff Report 2.  Approved 7/23/99, Reconsidered 8/16/99

PETITION NO. 603 - Lake Road Generating Company L.P. petition for a declaratory ruling that its existing electric generating facility complies with the Certificate and Decision and Order for operation on low sulfur fuel oil for Unit 1 and implementation plans for Units 2 and 3 in Killingly, Connecticut. Staff Report.  Approved 01/28/03

PETITION NO. 638 - Lake Road Generating Company L.P. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the Lake Road Generating substation off of Lake Road, Killingly, Connecticut. Staff Report.  Approved 09/09/03.

PETITION NO. 664 - Lake Road Generating Company L.P. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modification in operations at the Lake Road Generating facility located off of Lake Road, Killingly, Connecticut. Staff Report.  Approved 5/19/04.

PETITION NO. 848 – Frito-Lay, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction of a 5MW electric generating facility located at 1886 Upper Maple Street, Dayville (Killingly), Connecticut. Staff Report. Approved 3/13/08.

PETITION NO. 1132 - Cellco Partnership D/B/A Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the Killingly Town Hall building located at 172 Main Street, Killingly, Connecticut. Filing.  Staff Report.Completion Letter. Approved 02/19/15.

PETITION NO. 1453 The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for proposed modifications to its existing Killingly Substation located at 257 Tracy Road in Killingly, Connecticut. Approved 7/29/21

PE1133-VER-20151104 - Cellco Partnership d/b/a Verizon Wireless sub-petition for a declaratory ruling for approval of an eligible facility request for modifications to an existing telecommunications facility located at 1249 Hartford Pike, Killingly, Connecticut.  Decision. Extension Request and CSC Approval.2nd Extension Request and Modification to Filing with CSC Approval  3rd Extension Request and CSC Approval  Minor Modification Request   Council Decision on Modification  Will Not Complete

SUB-PETITION NO. 1293-BPKP-01 (Brooklyn, Pomfret, Killingly, and Putnam) – Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Decision Extension Request and Council Approval  Additional Extension Request and Council Approval  Request for Amendment  Council Amendment Decision  Extension Request and Council Extension Approval  Request for Amendment  Council Amendment Decision  Additional Extension Request and Council Extension Approval Notice of Construction Completion

SUB-PETITION NO. 1293-KL-01 (Killingly) – Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Decision  Notice of Completion

PETITION NO. 1308 - The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed replacement of two existing radio telecommunications facilities with a new 63.6-foot telecommunications facility on the roof of its existing Danielson Work Center used as a service center and maintenance yard located on property owned by Eversource Energy at 173 Mechanic Street, Killingly, Connecticut. Approved 7/20/2017.

CONN-2 Partnership notice of intent to modify an existing telecommunications facility located off North Rd., Killingly.

Nextel Communications notice of intent to modify an existing telecommunications facility locate at 1375 North Road in Killingly

TS-BAM-069-990701 - Bell Atlantic Mobile Request for an Order to approve tower sharing at an existing telecommunications facility located a t246 East Franklin Street, Danielson, Connecticut.

EM-SBA-069-020628 - SBA Properties, Inc. notice of intent to modify an existing telecommunications facility located at 246 East Franklin Street, Danielson (Killingly), Connecticut.

EM-AT&T-069-030501 - AT&T Wireless notice of intent to modify an existing telecommunications facility located at 79 Putnam Turnpike, Killingly, Connecticut.

EM-VER-069-051006 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at North Road, Killingly, Connecticut.
 
TS-T-MOBILE-069-060303 - Omnipoint Communications, Inc. (T-Mobile) request for an order to approve tower sharing at an approved telecommunications facility located at 280 Ross Road, Killingly, Connecticut.
 
EM-CING-069-060712 - New Cingular Wireless PCS, LLC notice of intent to modify an existing telecommunications facility located at 1375 North Road, Killingly, Connecticut.
 
EM-VER-069-061103 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 246 East Franklin Street, Danielson, Connecticut.
 
EM-SPRINT-NEXTEL-069-061204 - Sprint/Nextel Communications of the Mid-Atlantic, Inc. notice of intent to modify an existing telecommunications facility located at 1375 North Road, Killingly, Connecticut.  Decision Letter
 
EM-CING-069-080508 - New Cingular Wireless PCS, LLC notice of intent to modify an existing telecommunications facility located at 246 East Franklin Street, Killingly, Connecticut.
 
EM-CING-069-080514 – New Cingular Wireless PCS, LLC notice of intent to modify an existing telecommunications facility located at 79 Putnam Pike, Killingly, Connecticut.
 
EM-VER-069-080725 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 79 Putnam Pike, Killingly, Connecticut.
EM-CING-069-081024 - New Cingular Wireless PCS, LLC notice of intent to modify an existing telecommunications facility located at 246 East Franklin Street, Killingly, Connecticut.
 
EM-CING-069-081113- New Cingular Wireless PCS, LLC notice of intent to modify an existing telecommunications facility located at 79 Putnam Pike, Killingly, Connecticut.
 
EM-CING-069-090213 - New Cingular Wireless PCS, LLC notice of intent to modify an existing telecommunications facility located at 43 Connecticut Mills Avenue, Killingly, Connecticut.

EM-VER-069-090217 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 280 Ross Road, Danielson (Killingly), Connecticut.

EM-METROPCS-069-090728 – MetroPCS Massachusetts, LLC d/b/a MetroPCS notice of intent to modify an existing telecommunications facility located at 246 East Franklin Street, (Danielson) Killingly, Connecticut. Decision
 
EM-METROPCS-069-090807 - MetroPCS Massachusetts, LLC d/b/a MetroPCS notice of intent to modify an existing telecommunications facility located at 79 Putnam Pike, Killingly, Connecticut.
 
EM-METROPCS-069-090814 – MetroPCS Massachusetts, LLC d/b/a MetroPCS notice of intent to modify an existing telecommunications facility located at 280-296 Ross Road, (Danielson) Killingly, Connecticut.
 
EM-CING-069-100730 - New Cingular Wireless PCS, LLC notice of intent to modify an existing telecommunications facility located at 1395 North Road, Killingly, Connecticut.
 
EM-VER-069-120514 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 246 East Franklin Street, Danielson, Connecticut.
 
EM-VER-069-120607- Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 1375 North Road, Killingly, Connecticut.
 
EM-CING-069-121011 - New Cingular Wireless PCS, LLC notice of intent to modify an existing telecommunications facility located at 43 Connecticut Avenue, Killingly (Danielson), Connecticut.
 
EM-CING-069-121025 - New Cingular Wireless PCS, LLC notice of intent to modify an existing telecommunications facility located at 79 Putnam Pike, Killingly, Connecticut. Decision
 
EM-CING-069-121105 New Cingular Wireless PCS, LLC notice of intent to modify an existing telecommunications facility located at 280 Ross Road, Killingly, Connecticut.
 
EM-CING-069-130123 New Cingular Wireless PCS, LLC notice of intent to modify an existing telecommunications facility located at 1375 North Road, Dayville (Killingly), Connecticut.
EM-CING-069-130130 - New Cingular Wireless PCS, LLC notice of intent to modify an existing telecommunications facility located at 246 East Franklin Street, Danielson, Connecticut.
 
EM-SPRINT-069-130409Sprint Spectrum L.P. notice of intent to modify an existing telecommunications facility located at 246 East Franklin Street, Killingly, Connecticut.  
 
TS-AT&T-069-131216 - AT&T request for an order to approve tower sharing at an existing telecommunications facility located at 1249 Hartford Pike, (East) Killingly, Connecticut.
 
TS-VER-069-140117 - Cellco Partnership d/b/a Verizon Wireless request for an order to approve tower sharing at an existing telecommunications facility located at 812 Providence Pike, Killingly, Connecticut. Decision. Extension Letter. Completion Letter.

 

EM-AT&T-069-140114American Telephone and Telegraph (AT&T) notice of intent to modify an existing telecommunications facility located at 79 Putnam Pike, Dayville (Killingly), Connecticut. Decision. Extension Request and CSC Decision. Extension Request and CSC Decision. Extension Request and CSC Decision
.
EM-AT&T-069-140127 - American Telephone & Telegraph (AT&T) notice of intent to modify an existing telecommunications facility located at 43 Connecticut Mills Road, Danielson (Killingly), Connecticut. Decision. Extension Request and CSC Decision. Extension Request and CSC Decision. Extension Request and CSC Decision.

 

EM-CING-069-140516New Cingular Wireless PCS, LLC notice of intent to modify an existing telecommunications facility located at 79 Putnam Pike, Killingly, Connecticut. Decision.

 

EM-SPRINT-069-140807Sprint Spectrum notice of intent to modify an existing telecommunications facility located at 246 East Franklin Street, Killingly, Connecticut. Decision. Not Constructed.

 

EM-VER-069-140828 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 79 Putnam Turnpike, Killingly, Connecticut.  Decision. Completion Letter.   
 
EM-VER-069-141120 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 246 East Franklin Street, Danielson (Killingly), Connecticut.  Decision.
 
EM-T-MOBILE-069-150305 - T-Mobile Northeast LLC notice of intent to modify an existing telecommunications facility located at 79 Putnam Pike, Killingly, Connecticut. Revised Cover LetterDecision. Completion Letter.
 
EM-T-MOBILE-069-150402 - T-Mobile notice of intent to modify an existing telecommunications facility located at 818 Providence Pike, Killingly, Connecticut. Decision. Completion Letter.
 
EM-CING-069-150423 - New Cingular Wireless PCS, LLC notice of intent to modify an existing telecommunications facility located at 79 Putnam Pike, Killingly, Connecticut. DecisionExtension Request and CSC Decision2nd Extension Request and CSC Decision3rd Extension Request and CSC Decision4th Extension Request and CSC DecisionCompletion Letter
 
EM-VER-069-150605 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 280 Ross Road, Killingly, Connecticut. DecisionModifications Will Not Be Completed Letter.
 
EM-T-MOBILE-069-150608 - T-Mobile notice of intent to modify an existing telecommunications facility located at 280 Ross Road, Killingly, Connecticut.  DecisionCompletion Letter.
 
EM-VER-069-150626 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 246 East Franklin Street, Killingly, Connecticut. Decision.  Extension Request and CSC Approval.Will Not Complete
 
EM-VER-069-160824Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 280 Ross Road, Killingly, Connecticut. Decision.  Completion Letter.
 
TS-SMARTSKY-069-170227 – SmartSky Networks LLC request for an order to approve tower sharing at an existing telecommunications facility located at 280 Ross Road, Killingly, Connecticut. Town LetterDecisionExtension Request with CSC ApprovalCompletion Letter
 
EM-CING-069-170417 – New Cingular Wireless PCS, LLC notice of intent to modify an existing telecommunications facility located at 246 East Franklin Street, Danielson, Connecticut. Decision Completion Letter
 
EM-SPRINT-069-170511 - Sprint Spectrum, LP notice of intent to modify an existing telecommunications facility located at 70 Putnam Pike, Killingly, Connecticut. Decision 
 
EM-VER-069-170828 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 1375 North Road, Killingly, Connecticut. Denial Letter
 
EM-VER-069-171019 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 1375 North Road, Killingly, Connecticut. DecisionExtension Request and CSC DecisionCompletion Letter
 
EM-VER-069-171227Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 812 Providence Pike, Killingly, Connecticut. Decision  T-Arm Replacement Information  Completion Letter
 
EM-SPRINT-069-180123 – Sprint notice of intent to modify an existing telecommunications facility located at 79 Putnam Pike, Killingly, Connecticut. IncompleteResponse to IncompleteDecision
 
EM-SPRINT-069-180131 – Sprint notice of intent to modify an existing telecommunications facility located at 246 East Franklin Street, Killingly (Danielson), Connecticut. Incomplete Letter  Response to Incomplete Letter   Structural Analysis Report  DecisionCompletion Letter
 
TS-T-MOBILE-069-180301 - T-Mobile request for an order to approve tower sharing at an existing telecommunications facility located at 1375 North Road, Killingly, Connecticut.
 
TS-T-MOBILE-069-180301 - T-Mobile request to amend an order tower sharing at an existing telecommunications facility located at 1375 North Road, Killingly, Connecticut.  Withdrawn 8/28/18
 
EM-SPRINT-069-180607 - Sprint Spectrum Realty Company, L.P. notice of intent to modify an existing telecommunications facility located at 79 Putnam Pike, Killingly, Connecticut. Incomplete LetterResponse and Acknowledgment Letter Decision.

EM-SPRINT-069-180619 - Sprint Spectrum L.P. notice of intent to modify an existing telecommunications facility located at 1375 North Road, Dayville (Killingly), Connecticut. Denial Letter

EM-SPRINT-069-180730 – Sprint Spectrum, LP notice of intent to modify an existing telecommunications facility located at 1375 North Road, Killingly, Connecticut. Decision Construction Complete

EM-VER-069-190423 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 520 Bailey Hill Road, Killingly, Connecticut. Decision Extension Request and Council Approval   Will Not Complete

EM-T-MOBILE-069-190624 – T-Mobile notice of intent to modify an existing telecommunications facility located at 246 East Franklin Street, Danielson (Killingly), Connecticut. Incomplete LetterResponse to Incomplete and Council AcknowledgementDecision  Will Not Complete

EM-T-MOBILE-069-190703 – T-Mobile notice of intent to modify an existing telecommunications facility located at 818 Providence Pike, Killingly, Connecticut. Decision Completion Letter

TS-SIGFOX-069-190712 - Sigfox NIP, LLC request for an order to approve tower sharing at an existing telecommunications facility located at 1375 North Road, Dayville (Killingly), Connecticut. Town LetterIncomplete LetterExtension LetterResponse to Incomplete and Council Acknowledgment Decision

EM-VER-069-190814 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 1375 North Road, Killingly (a/k/a Dayville), Connecticut. Incomplete LetterResponse to Incomplete and Council Acknowledgement  Decision Will Not Complete Letter

EM-T-MOBILE-069-200714 – T-Mobile notice of intent to modify an existing telecommunications facility located at 812 Providence Pike, Killingly, Connecticut. Decision Completion Letter

EM-CING-069-200826 - New Cingular Wireless PCS, LLC  notice of intent to modify an existing telecommunications facility located at 246 East Franklin Street, Danielson (Killingly), Connecticut.  Decision  Notice of Completion

EM-T-MOBILE-069-200910 - T-Mobile notice of intent to modify an existing telecommunications facility located at 1375 North Road, Killingly, Connecticut. Decision  Notice of Completion

EM-EVER-069-201104 - The Connecticut Light and Power Company d/b/a Eversource Energy notice of intent to modify an existing telecommunications facility located at 173 Mechanic Street, Killingly, Connecticut.  Supplemental Filing - Mount Analysis Decision  Notice of Completion

EM-T-MOBILE-069-210208 – T-Mobile notice of intent to modify an existing telecommunications facility located at 246 East Franklin Street, Killingly, Connecticut. Decision  Notice of Construction Start Notice of Completion

EM-T-MOBILE-069-210223 – T-Mobile notice of intent to modify an existing telecommunications facility located at 79 Putnam Pike, Killingly, Connecticut. Decision Notice of Completion

EM-T-MOBILE-069-210325 – T-Mobile notice of intent to modify an existing telecommunications facility located at 280 Ross Road, Killingly, Connecticut.  Decision  Notice of Completion

EM-T-MOBILE-069-210609 - T-Mobile notice of intent to modify an existing telecommunications facility located at 812 Providence Pike, Killingly, Connecticut. Decision  Notice of Construction Start  Notice of Completion

EM-CING-069-210617 – New Cingular Wireless PCS, LLC (AT&T) notice of intent to modify an existing telecommunications facility located at 1375 North Road, Killingly, Connecticut. Decision-Denial

EM-T-MOBILE-069-210823 - T-Mobile notice of intent to modify an existing telecommunications facility located at 79 Putnam Pike, Killingly, Connecticut.  Decision  Notice of Completion

EM-CING-069-210830 - New Cingular Wireless PCS, LLC (AT&T) notice of intent to modify an existing telecommunications facility located at 1375 North Road, Killingly, Connecticut.  Incomplete Letter  Response to Incomplete Council Acknowledgement  Decision  Notice of Completion

EM-VER-069-210902 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 1375 North Road, Killingly, Connecticut. Incomplete Letter  Decision - Denial

EM-T-MOBILE-069-210908 – T-Mobile notice of intent to modify an existing telecommunications facility located at 246 East Franklin Street, Killingly, Connecticut.   Oct. 4, 2021 Corrected Submission Corrected Submission  Decision Notice of Construction Start  Notice of Completion

EM-VER-069-210923 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 246 East Franklin Street, Danielson (Killingly), Connecticut. Decision  Extension Request and Council Extension Approval  Notice of Completion

EM-VER-069-211019 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 520 Bailey Hill Road, Killingly, Connecticut. Decision  Extension Request and Council Extension Approval  Notice of Completion

EM-VER-069-211208 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 812 Providence Pike, Killingly, Connecticut. Decision  Notice of Completion

EM-CING-069-220113 - New Cingular Wireless PCS, LLC (AT&T) notice of intent to modify an existing telecommunications facility located at 79 Putnam Pike, Killingly, Connecticut. Decision  Notice of Completion

EM-VER-069-220317 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 79 Putnam Pike, Killingly, Connecticut.  Decision  Notice of Completion

EM-VER-069-220324 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 1375 North Road, Killingly, Connecticut.  Decision  Notice of Construction Start   Notice of Completion

EM-VER-069-220419 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 280 Ross Road, Killingly, Connecticut. Decision  Extension Request and Council Extension Approval Notice of Construction Commencement

EM-CING-069-220421New Cingular Wireless PCS, LLC (AT&T) notice of intent to modify an existing telecommunications facility located 246 East Franklin Street, Killingly, Connecticut.  Incomplete Letter  Response to Incomplete and Council Acknowledgement Decision Notice of Completion

TS-DISH-069A-220527 - Dish Wireless, LLC request for an order to approve tower sharing at an existing telecommunications facility located at 246 East Franklin Street, Killingly, Connecticut.  Town Letter Decision Notice of Construction Completion

TS-DISH-069B-220527 - Dish Wireless, LLC request for an order to approve tower sharing at an existing telecommunications facility located at 280 Ross Road, Killingly, Connecticut.  Town Letter Decision Notice of Construction Completion

TS-DISH-069-220830 – Dish Wireless, LLC request for an order to approve tower sharing at an existing telecommunications facility located at 79 Putnam Pike, Killingly, Connecticut.  Town Letter Decision Extension Request and Council Extension Approval

TS-DISH-069-220927 – Dish Wireless, LLC request for an order to approve tower sharing at an existing telecommunications facility located at 1375 North Road, Killingly, Connecticut.  Town Letter Decision Extension Request and Council Extension Decision  Second Extension Request and Council Approval  

EM-VER-069-230110 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 172 Main Street, Killingly, Connecticut. Decision Revision Request and Council Revision Decision Notice of Construction Commencement/Request for Extension and Council Extension Approval Notice of Construction Completion

TS-ATT-069-230331 – AT&T request for an order to approve tower sharing at an existing telecommunications facility located at 812 Providence Pike, Killingly, Connecticut.  Town LetterIncomplete LetterResponse to IncompleteCouncil AcknowledgementDecision Notice of Construction Commencement Extension Request and Council Extension Decision

EM-ATT-069-230626 – AT&T notice of intent to modify an existing telecommunications facility located at 79 Putnam Pike, Killingly, Connecticut.  Decision Notice of Construction Completion

EM-VER-069-230810 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 246 East Franklin Street, Killingly, Connecticut. Original Tower Approval Decision  Notice of Construction Commencement Extension Request and Council Extension Approval

EM-VER-069-231006 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 520 Bailey Hill Road, Killingly, Connecticut.  DecisionNotice of Construction Commencement Notice of Construction Completion

EM-VER-069-231020 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 812 Providence Pike, Killingly, Connecticut.  Decision Notice of Construction Commencement

EM-VER-069-231031Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 1375 North Road, Killingly, Connecticut.  Decision Notice of Construction Commencement Notice of Construction Completion

TS-VER-069-231108 - Cellco Partnership d/b/a Verizon Wireless request for an order to approve tower sharing at an existing telecommunications facility located at 1249 Hartford Pike, Killingly, Connecticut.  Town LetterDecision Notice of Construction Commencement Notice of Construction Completion

EM-T-MOBILE-069-240118 – T-Mobile notice of intent to modify an existing telecommunications facility located at 280 Ross Road, Killingly, Connecticut.  DecisionNotice of Construction CommencementNotice of Construction Completion

EM-ATT-069-240815 - AT&T notice of intent to modify an existing telecommunications facility located at 246 East Franklin Street, Killingly, Connecticut.  Decision