Waste Management and Disposal
Page 8 of 9
-
Information about contingency plan and emergency response requirements for Large Quantity Generators of hazardous waste in Connecticut.
-
Determining Generator Category
How a generator of hazardous waste can determine their hazardous waste generator category.
-
Inspection requirements for large- and small-quantity generators of hazardous waste in Connecticut.
-
Information about how hazardous waste Large Quantity Generators must manage containers of hazarodus waste.
-
Hazardous Waste Determinations
How a generator of a waste in Connecticut can determine if that waste is a hazardous waste.
-
DEEP Inspection & Enforcement Process
A description of DEEP's hazardous waste inspection and enforcement process.
-
Information about Connecticut's requirements for the manaagement of hazardous waste, as well as links for additional, more in-depth information.
-
Information about personnel training requirements for Large Quantity Generators of Hazardous Waste.
-
Information about the use of the hazardous waste manifest in Connecticut.
-
Information on the requirements for Large Quantity Generators of hazardous waste in Connecticut.
-
Permitting and Reporting Requirements for HHW
Permitting and reporting requirements for companies that are involved in the collection of household hazardous waste and other similar wastes.
-
Information about the management of construction and demolition waste in Connecticut.
-
Composting and Organics Recycling
Organic materials that are source-separated from the trash are highly recyclable and should be thought of as a resource, not a waste.
-
Solid Waste Facilities in CT are required to have operators to be certified
-
Vermicomposting Pilot Project Photo Gallery
Pictures of a school composting project.