Public Notices Proposed Actions - Opportunity for Comment
Page 20 of 24
-
ReEnergy Holding's Petition for a Declaratory Ruling Regarding the Applicability of the Section 16-245a(g) Statutory Exemption from the Reduction in Value of Renewable Energy Certificates Generated by Biomass Facilities.
-
Plainfield Renewable Energy LLC
Plainfield Renewable Energy, LLC's Petition for a Declaratory Ruling Regarding the Applicability of the Section 16-245a(g) Statutory Exemption from the Reduction in Value of Renewable Energy Certificates Generated by Biomass Facilities.
-
Safety Kleen Systems, Inc., Branford
Safety-Kleen Systems, Inc., 11 Tipping Drive, Branford , CT Notice of Tentative Determination that Remediation is Complete Without Controls RCRA Permit is Not Needed
-
Connecticut Department of Transportation, Southbury (20250413-IW)
Notice of tentative determination to approve an application submitted by Connecticut Department of Transportation for proposed activity that includes rehabilitating Bridge 07043 via sliplining and installing baffles and rock weirs. This activity will affect 2,200 s.f. of watercourses permanently and 420 s.f. of watercourses temporarily. Written comments due by June 18, 2026.
-
Ahlstrom Nonwoven LLC-Ahlstrom Power Windsor Locks LLC
Notice of tentative determination to approve an application submitted by Ahlstom Nonwoven LLC-Ahlstrom Power Windsor Locks LLC for renewal of a Title V and CAIR Permit. Written comments are due by July 3, 2026.
-
City of Meriden (202505082-DIV & 20250580-WQC)
Notice of tentative determination to approve an application submitted by City of Meriden for proposed activity that includes excavation and discharge of excavated and fill materials to construct and operate a Flood Control and Linear Trail project to create compensatory flood storage consistent with the one percent chance flood to reduce flooding within the City of Meriden. This activity will affect 304,484.4 s.f. of wetlands/watercourses permanently . Written comments due by July 11, 2026.
-
USA Hauling & Recycling, Inc., Enfield
Notice of tentative determination to approve an application submitted by USA Hauling & Recycling, Inc. for the renewal of a permit to construct and operate a volume reduction plant and transfer station. Written comments due July 12, 2026.
-
Notice of tentative determination to approve an application submitted by the Town of Haddam for the renewal of a stewardship permit. Written comments due August 23, 2026.
-
R.E.D. Technologies, LLC, Portland
Notice of tentative determination to approve a renewal authorization application submitted by R.E.D. Technologies, LLC. Written comments due August 20, 2026.
-
ABB Inc., Windsor - Separation of 5.013 Acres From Main Site
Notice of tentative determination of Resource Conservation and Recovery Act Corrective Action regarding obligations under RCRA are complete without controls for the Fifth Portion (5.103 acres) owned by ABB Inc. (aka Combustion Engineering) located at 2000 Day Hill Road in Windsor; and to separate the 300 Groton Road parcel of land from the Main Site. Public Hearing to be held on July 16, 2026. Written comments are due July 30, 2026.
-
Iroquois Gas Transmission System LP, Brookfield (Second Notice)
Second notice of tentative determination has been reached to approve amendments to applications submitted by Iroquois Gas Transmission System L.P. in Brookfield. Written comments due by August 26, 2026.
-
David O. Bond, East Haven (202605825-SDF)
Notice of tentative determination to approve an application submitted by David O. Bond for proposed activity that includes installation of a dock. This activity will affect aquatic resources. Written comments due by August 25, 2026.
-
Herrick & White, LTD.,Cumberland RI
Notice of public comment regarding a proposal to issue an Emissions Cap for Herrick & White, LTD in Cumberland RI. Written comments are due by August 7, 2026.
-
Laurelbrook Natural Resources, LLC, East Canaan (WQC-202508095)
Notice of tentative determination to approve an application submitted by Laurelbrook Natural Resources, LLC for proposed activity that includes the withdrawal of water from the Whiting River to fill an onsite reservoir to supply an aggregate processing wash plant. This activity will affect the Whiting River and Blackberry River. Written comments due by July 29, 2026.
-
Notice that the Draft Comprehensive General Permit for Discharges to Surface and Ground Water noticed on December 24, 2025 is withdrawn.