DOCKET NO. 194 – An application by Comcast Cablevision of New Haven for a Certificate of Environmental Compatibility and Public Need for the installation of a community antenna television head-end facility located at 11 Hamden Park Drive in Hamden, Connecticut. (Findings of Fact) (Opinion) and (Decision and Order)
DOCKET NO. 195 – An application by Cellco Partnership d/b/a Bell Atlantic Mobile for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications tower disguised as an agricultural silo located at Lockwood Farm, 890 Evergreen Avenue in Hamden, Connecticut. (Findings of Fact) (Opinion) and (Decision and Order)
DOCKET NO. 272 – The Connecticut Light and Power Company and The United Illuminating Company Certificate of Environmental Compatibility and Public Need for the construction of a new 345-kV electric transmission line and associated facilities between the Scovill Rock Switching Station in Middletown and the Norwalk Substation in Norwalk, Connecticut. This includes construction of the Beseck Switching Station in Wallingford, East Devon Substation in Milford, and Singer Substation in Bridgeport and modifications to the Scovill Rock Switching Station and the Norwalk Substation and certain interconnections. (Hamden) (Findings of Fact) (Appendix A) (Appendix B) (Appendix C) (Opinion) (Decision and Order) (Record)
DOCKET NO. 310 – Omnipoint Communications, Inc., a subsidiary of T-Mobile USA, Inc., application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a cellular telecommunications facility located at 190 Wintergreen Avenue, Hamden, Connecticut. Withdrawn
DOCKET NO. 324 – Sprint Nextel Corporation application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance and operation of a wireless telecommunications facility at 150 Willow Street, Hamden, Connecticut. (Record) (Findings of Fact) (Opinion) and (Decision and Order)
DOCKET NO. 471 – Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at Hamden Tax Assessor’s Map 2826, Block 24, 208 Kirk Road (a/k/a 1075 Paradise Avenue), Hamden, Connecticut. (Findings of Fact) (Opinion) (Decision and Order)
DOCKET NO. 486 – Tarpon Towers II, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at 796 Woodin Street, Hamden, Connecticut. (Findings of Fact) (Opinion) (Decision and Order)
PETITION NO. 131 – Northeast Utilities Service Company petition for modification of the Southington-Glen Lake Junction 115-kV line in Southington, Meriden, Wallingford, Cheshire, Hamden, and Bethany. Staff Report Approved 08/20/85
PETITION NO. 132 – Northeast Utilities Service Company petition for modifications to Cook Hill Junction-Devon 115-kV line in Hamden and Orange. Staff Report Approved 08/20/85
PETITION NO. 259 – United Illuminating Company petition for temporary transformer installation project at Mix Avenue Substation, in Hamden. Staff Report Approved 11/14/90
PETITION NO. 316 – Springwich Cellular Limited Partnership petition for the proposed addition of antennas to an existing tower at 975 Mix Avenue, in Hamden. Staff Report Approved 01/12/94
PETITION NO. 339 – The Connecticut Light and Power Company petition that no Certificate is required for placement of a fiber optic shield wire and certain structural changes along several 115-kV and 345-kV transmission corridors in Connecticut. Staff Report Approved 07/06/95
PETITION NO. 339A – Connecticut Light and Power Company petition that no Certificate of Environmental Compatibility and Public Need is required for installation of a fiber optic cable and associated structural changes along several 115-kV and 345-kV transmission corridors in the Towns of Berlin, Bethany, Cheshire, Hamden, Meriden, Milford, Orange, Wallingford, and Woodbridge, Connecticut. Request for Amendment. Staff Report Approved 04/02/98
PETITION NO. 348 – The Connecticut Light and Power Company petition for proposed modifications to the Cook Hill Junction to Glen Lake Junction 115-kV transmission line, in Cheshire and Hamden. Staff Report Approved 03/13/96
PETITION NO. 391 – United Illuminating Company Petition that No Certificate of Environmental Compatibility and Public Need is necessary to replace certain structures on United Illuminating’s 115-kV Mix-Glen Lake overhead transmission line located in Hamden, Connecticut. Staff Report Approved 05/28/98
PETITION NO. 421 – Bell Atlantic Mobile petition for a Declaratory Ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction of a telecommunications tower disguised as an agricultural silo located at Lockwood Farm in Hamden, Connecticut. Staff Report Denied 07/15/99
PETITION NO. 437 – United Illuminating Company (UI) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of telecommunications facilities associated with a remote network meter reading system within UI's service area. Staff Report. Approved nine of eleven sites 11/9/99. Reconsideration of the Woodbridge site. Approved 03/22/00. Reconsidered and Approved Ansonia site 08/10/00.
PETITION NO. 438 – United Illuminating Company (UI) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of transmitters and receivers associated with a remote network meter reading system within UI's service area. Staff Report Approved 11/09/99
PETITION NO. 440 – Omnipoint Communications petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modification to an existing Connecticut Light and Power high-voltage electric transmission line support structure located at Whitney Avenue (Route 10) in Hamden. Staff Report Approved 12/08/99
PETITION NO. 496 – United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of telecommunications facilities associated with a remote network meter reading system within UI's service area. Staff Report. Approved five of the seven proposed sites. 12/14/00
PETITION NO. 500 – United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for modifications to the Mix Avenue Substation located at 690 Mix Avenue, Hamden, Connecticut. Staff Report Approved 02/08/01
PETITION NO. 524 – The United Illuminating Company (UI) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications on the UI 115kV Mix-Glen Lake overhead transmission line, Woodbridge and Hamden, Connecticut. Staff Report Approved 09/12/01
PETITION NO. 570 – The United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for proposed lightning protection modifications to the Mix Avenue Substation, located at 690 Mix Avenue in Hamden, Connecticut. Staff Report Approved 07/11/02
PETITION NO. 592 – Southwestern Bell Mobile Systems, LLC petition for 1) reconsideration of exempt modification EM-CING-062-020930, or in the alternative 2) a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed replacement and modifications to an existing telecommunications facility located at 975 Mix Avenue, Hamden, Connecticut. Staff Report Approved 10/23/02.
PETITION NO. 629T – Southwestern Bell Mobile Systems, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing telecommunications facility located at the Quinnipiac College Carl Hansen Student Center, New Road, Hamden, Connecticut. Staff Report Approved 06/19/03
PETITION NO. 1627R– LSE Libra LLC (Lodestar Energy) petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 1.5-megawatt AC solar photovoltaic electric generating facility and associated equipment located at 410 Denslow Hill Road, Hamden, Connecticut, and associated electrical interconnection. Court-ordered Remand Regarding Connecticut Siting Council’s August 2, 2024 Final Decision pursuant to Connecticut General Statutes §4-183(j). (Link to PETITION NO. 1627) Denied 08/21/25
PETITION NO. 1663 – VFS, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a customer-side 920-kilowatt fuel cell facility collocated with a 1.99-megawatt AC battery energy storage facility and associated equipment located at the Quinnipiac University York Hill Campus, 305 Sherman Avenue, Hamden, Connecticut, and associated electrical interconnection. Approved 08/21/25
PETITION NO. 1666 – VFS, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a customer-side 2.76-megawatt fuel cell facility collocated with a 1.99-megawatt AC battery energy storage facility and associated equipment located at the Quinnipiac University Mount Carmel Campus, 275 Mount Carmel Avenue, Hamden, Connecticut, and associated electrical interconnection. Approved 08/21/25