Docket 272 - Connecticut Light and Power Company and The
United Illuminating Company UIL Holdings Corporation application for a new 345-kV electric transmission line between Scovill Rock Switching Station in Middletown and Norwalk Substation in Norwalk.
Note: The application material files are very large. Persons having difficulty downloading them may request a package of CDs that contain the application materials in PDF files by submitting an email request to the Siting Council. Emails should be addressed to: siting.council@po.state.ct.us. Please include a mailing address with your request. There is no charge to send these CDs.
To see a chronological listing of documents filed in this proceeding, click here.
To see limited appearance comments received from elected officials, click here.
Docket 272 Development and Management Plans
Docket 272 Application Materials
(to download pdf file versions from Northeast Utilities website)
Docket 272 Application - Zip Files
Docket 272 Service List - as of 5/14/07
Letter to State Treasurer
Docket 272 Evidentiary Hearing Dates
Applicant's Letter Re Docket Schedule
Applicant's Supplemental Filing
- Highway Corridor Study-Revisedy
- East Devon - Beseck 40-mile Cable Option
Harmonic Study
- East Devon - Beseck 20-mile Cable Option
Harmonic Study
- Cable Transient & Harmonic Feasibility Study
Final Report
(Appendices to Final Report available
upon request)
Addendum #1 to Applicant's Supplemental Filing
Addendum #1 - Revised 1/28/04
Addendum #2 to Applicant's Supplemental Filing
Addendum #2 - Attachment 1, East Shore
345 kV Alternative
Addendum #2 - Attachment 3, East Shore
Line Reconductor
Addendum #2 - Attachment #4, East Shore
Alternative
Addendum #3 to Applicant's Supplemental Filing
Addendum #3 - Attachment 1: Comparison
Study: Middletown to Norwalk Project vs.
East Shore Alternative
Addendum #3 - Attachment 2: East Shore
Alternative - Transmission Loading and
Voltage Analysis
Addendum #3 - Attachment 3: East Shore
Alternative - 387 Line Reconductored
Plumtree - Norwalk Project Final Report, Rev. 3
Switching Transient Study Draft Report
Applicant's Memorandum re Eminent Domain
Durham/Wallingford Motion to Compel Discovery
Durham/Wallingford Interrogatories - Set One
Applicant's Response to Durham/Wallingford Interrogatories - 1/2/04
Additional Applicant Responses to Durham/Wallingford Interrogatories - 1/6/04s
Applicant's Responses to D/W Interrogatories - Set One (1-7-04)
Bulk filed response to Question 014: High Voltage Direct Current Transmission Study
Attachments to Applicant Response to D/W Interrogatory No. 31
Applicant Responses to Interrogatories from D/W (Set One) and All Towns 5-28-04
Durham/Wallingford Interrogatories - Set Two
Applicant Responses to D/W Interrogatories - Filed 3/2/04
Durham/Wallingford Interrogatories re ROW Structures (Set Three) - 6/15/04
Applicant Response to D/W Interrogatory 03, Q62 - 1/26/05
Applicant Response to D.W Interrogatory 03, Q63 - 1/26/05
Durham/Wallingford Interrogatories re EMF Measurements (Set Four) - 8/18/04
Applicant Reponses to D/W Interrogatories (Set Four) - filed 9/3/04
Durham/Wallingford Interrogatory (Set Five) - 9/10/04
Applicant Response to D/W Interrogatories (Set Five) - 2/3/05
Town of Durham Interrogatories 6-9-04
Applicant Response to Durham Interrogatories - 2/1/05
All Towns Interrogatories - Set One
Applicant Responses to All Towns Interrogatories - 3/3/04s
Applicant's Additional Responses to All Towns Interrogatories - 3/9/04s
Additional Applicant Responses to All Towns Interrogatories - 3/8/04s
Additional Applicant Responses to All Towns Interrogatories - 3/16/04
Additional Applicant Response to All Towns Interrogatories - 4/2/04
Additional Applicant Response to All Towns Interrogatories (Bulk Filing) - 4/6/04
Bulk Filing - Harmonic Study for East Shore Alternatives
Additional Applicant Responses - 4-15-04
All Towns Interrogatories - Set Two
Applicant Responses to Towns' Interrogatories - Set Two
Applicant Responses to All Towns Interrogatories, Set Two - 3/18/04
Applicant Responses to All Towns Interrogatories, Set Two - 3/19/04
Applicant Responses to All Towns Interrogatories, Set Two - 3/25/04
All Towns Interrogatories: Motion to Compel Discovery
Applicant Opposition to Towns' Motion
All Towns' Reply to Applicant's Opposition
All Towns Motion to Dismiss or Reschedule
Applicant's Objection to Towns' Motion to Dismiss
All Towns' Interrogatories - Set Three
Applicant's Responses to All Towns' Interrogatories - Set Threes
All Towns Interrogatories - Set Four
All Towns Interrogatories - Set Five
Applicant Responses to All Towns Interrogatories (Set Five) - 4-15-04
Applicant Responses to All Towns Interrogatories (Set Five) - 5/7/04
All Towns Interrogatories - Set Six
Applicant Responses to All Towns Interrogatories (Set Six) - 4-15-04
Applicant Responses to All Towns Interrogatories (Set Six) - 4-30-04
Applicant Responses to All Towns Interrogatories (Set Six) - 5-24-04
Applicant Responses to Interrogatories from Durham/Wallingford and All Towns (Set Six) - 5-28-04
All Towns Interrogatories - Set Seven
Applicant Responses to All Towns Interrogatories (Set Seven) - 6/24/04
Applicant Response to All Towns Interrogatories Q85 - 1/26/05
Applicant Response to All Town Interrogatories Q86 - 1/26/05
All Towns Interrogatories for ISO-New England
ISO Response 2a - Cable Flows and Rating
ISO Response 2b - Devon Reactor
ISO Response 2c - Grand Summary Results
ISO Response 2d - NE-NY Transfer
ISO Response 2e - NE-NY 1000MW
ISO Response 2f - NE-NY Cable
ISO Response 2g - Besseck-Devon Off
ISO Response 2h - Besseck-Devon On
Attorney-General Interrogatories - Set One
Applicant Responses to Attorney-General Interrogatories
Applicant Responses to Attorney-General Interrogatories 1/12/04
Attorney-General Interrogatories - Set Two
Applicant Response to Attorney-General Interrogatories - Set Two
Attorney-General Interrogatories - Set Three
Measured & Calculated EMF at Boundaries of Facility Locations
Applicant Response to A-G Interrogatories - Set Three, 7/29/04
Applicant's Interrogatories for Parties
All Towns Responses to Applicant Interrogatories
Milford Responses to Applicant Interrogatories
Woodbridge Responses to Applicant Interrogatories
ConnDOT Responses to Applicant Interrogatories
Joel N. Gordes Statement of Limited Appearance
Office of Consumer Counsel (OCC) Interrogatories - Set One
Applicant's Response to OCC Interrogatories
OCC Interrogatories - Set Two
Applicants' Response to OCC Interrogatories - Set Two, 7-28-04
OCC Interrogatories - Set Three, 7-29-04
Cheshire, Durham, Middlefield, Milford, Orange, Wallingford, and Woodbridge Objection to OCC Interrogatories, Set Three
Applicant Responses to CSC Interrogatories (Set Three) and OCC Interrogatories (Set Three) - 1-17-05
Applicant Responses to OCC Interrogatories (Set Three) - 1-19-05
OCC Interrogatories - Set Five, 12/29/04
Applicant Response to OCC Interrogatories (Set Five) - 2/3/05
Siting Council Interrogatories 3-3-04
Applicant's Response to Council Interrogatories
Additional Applicant Responses to Council Interrogatories - 3/16/04
Applicant Responses to Council Interrogatories - 3/18/04
Applicant Responses to Council Interrogatories - 3/19/04
Applicant Responses to Council Interrogatories - 4/19/04
Applicant Responses to Council Interrogatories - 4/21/04
Applicant Response to CSC Interrogatory 01, SP1 - 1/26/05
Siting Council Interrogatories - Set Two, 3-31-04
Applicants' Response to Council Interrogatories (Set Two) - 4-15-04
Applicant Responses to Council Interrogatories - 4/19/04
Applicant Responses to Council Interrogatories - 4/21/04
Applicant Responses to Council Interrogatories (Set Two) - 4/27/04
Applicant Responses to Council Interrogatories (Set Two) - 5/7/04
Applicant Response to Counci Interrogatories (Set Two) - 5/10/04
Applicant Responses to Council Interrogatories (Set Two) - 5/18/04
Siting Council Interrogatories - Set Three, 6/7/04
Applicant Response to CSC Interrogatories (Set Three) - 6/14/04
Applicant Response to CSC Interrogatories (Set Three) - 6/24/04
Applicant Response to CSC Interrogatories (Set Three) - 7-14-04
Applicant Responses to Council Interrogatories (Set Three) - 1/5/05
Applicant Responses to CSC Interrogatories (Set Three) and OCC Interrogatories (Set Three) - 1-17-05
Applicant Response to CSC Interrogatory 03, Q64 - 1/26/05
Siting Council Interrogatories - Set Four, 8/25/04
Applicant Responses to CSC Interrogatories (Set Four) - filed 9/3/04
Applicant Responses to CSC Interrogatories (Set Four) - filed 9/14/04
Siting Council Interrogatories - Set Five 10/22/04
Applicant Responses to CSC Interrogatories (Set Five) - 11/18/04
Applicant Response to Interrogatory #91 at 15GW loading
Applicant Response to Interrogatory #91 at 27GW loading
Applicant Response to CSC Interrogatory 05, Q95 - 1/26/05
Applicant Response to Q95 - Attachment 1
Applicant Response to Q95 - Attachment 2
Applicant Response to CSC Interrogatories (Set Five) - 2/3/05
Siting Council EMF-Related Exhibits:
Exhibits 1-4
Exhibit 5
Exhibit 6: Dr. Ginsberg Supplemental Testimony
Applicant Information on Property Rights Needed
PSEG Interrogatories
Applicant Responses to PSEG Interrogatories
CL&P/UI Conceptual State Agreement
Milford Power Plant System Impact Study
Applicant Additional Responses to PSEG Interrogatories
ISO Southwest CT Electric Reliability Study - Vol. I
(Appendices to this Study available upon request)
ISO Southwest CT Electric Reliability Study - Comparative Analysis
Harmonics Tutorial for Southwest CT Electric Reliability Study
ISO Pre-filed Testimony of Stephen Whitley
Applicant: Pre-filed Testimony of Roger Zaklukiewicz
Applicant: Pre-filed Testimony of Michael Coretto
Pre-filed Testimony for Jewish Organization Intervenors
Supplemental Pre-filed Testimony of Dr. Eric Grubman
Applicants' Errata Pages for Hearings Held 3/23-25/04
Woodbridge/Milford Interrogatories - Set One
Applicant Responses to W/M Interrogatories 5/13/04
Applicant Responses to W/M Interrogatories 5-28-04
Town of Milford Interrogatories
Applicant Response to Milford Interrogatories - 5/7/04
Applicant Response to Milford Interrogatories - 5/10/04
Applicant Response to Milford Interrogatories 5/13/04
Town of Milford Interrogatories - Set Two
SCCRWA Interrogatories
Applicants' Responses to SCCRWA Interrogatories - 4-16-04
Dr. Cole letter re EMF studies
ConnDOT motion for time extension
Applicants' letter re ConnDOT motion
CT Department of Public Health Comments on EMF
Henry Harris (ConnDOT) Testimony re Railroad Alternatives
Supplemental Testimony of Henry Harris
Arthur Gruhn (ConnDOT) Testimony re Applicant Proposals
ConnDOT Policy on Utilities in Rights-of-Way
Errata Pages for ConnDOT Testimony of 5/25
ConnDOT Corrected Pre-Filed Testimony
Errata Pages for Applicants' Witnesses Testimony of 4/20/04
City of Bridgeport Letter re Applicants' Plans
Applicants' EMF Interrogatories for Jewish Community Organizations
Jewish Organizations' Responses to Interrogatories - List of Witnesses
Attorney General's letter re EMF inquiry to NYSDOH
NYDSOH Response to Attorney General's EMF Inquiry
ConnDOT - CL&P Transmission Line Agreement
ConnDOT/UI Transmission Line Agreement for New Haven Rail Line
Correspondence from Town of Westport
Comments and Recommendations from Fairfield County communities
Norwalk Planning Commission Resolution
NEPOOL Operating Procedure No. 12
Supplemental Testimony of Dr. Bailey re EMF impacts at Jewish facilities in Woodbridge
Supplemental Testimony of Robert Carberry and Kathleen Shanley Re State EMF Policies
Supplemental Testimony of Dr. Bailey Re EMF
Applicant Request to take Administrative Notice of State Agency EMF-Related web sites
Correspondence re Natural Diversity Database
Applicant Response to CSC Inquiry re EMF levels
Woodbridge/Milford motion to add hearing dates
All Towns motion to reschedule certain filing dates
Attorney General's Letter of Support for Woodbridge/Milford and All Towns motions
Applicant's Errata Filing for May 12 Hearing
NU/UI Review of West Rock Tunnel Crossing
Orange Reponse to Route 15 Alternative
Woodbridge Comments re Route 15 Alternative
2002 New England Electric Load Duration Graph
Attorney General's Motion Re H.B. 5418
Town of Milford Filings:
Milford Mayor Letter re Alternative Routes
Land-Tech Consultants Pre-Filed Testimony on behalf of Milford
Milford Responses to Applicant Interrogatories
OCC Filings:
Marc Montalvo Supplemental Testimony for OCC
Exhibit 1 of Montalvo Testimony
Exhibit 2 of Montalvo Testimony
Exhibit 3 of Montalvo Testimony
Torben Aabo Testimony for OCC
Exhibit for Aabo Testimony
Schlissel-Lanzalotto Testimony for All Towns
City of Bridgeport Testimony re Alternate Overhead Route along Railroad ROW
Applicant: Testimony of Roger Zaklukiewicz, Anne Bartosewicz, John Prete, Cyril Welter, James Hogan re East Shore route
Applicant: Beseck to East Devon Route Maps
Applicant: Beseck to East Shore Route Maps
Applicant: East Shore to East Devon Route Maps
Applicant Testimony re Routing and Environmental Matters between Scovill Rock and East Devon
Figure for Page 11
Town of Woodbridge Filings:
Land-Tech Consultants Testimony for Woodbridge
Ecological Impacts Assessment for Route through Woodbridge
Appendix to Woodbridge Impacts Assessment
Woodbridge Supplement to Consultant Testimony
Woodbridge Responses to Applicant Interrogatories
Testimony of Arthur Gruhn, ConnDOT, re Segments 3 & 4
Correspondence re Blackite Site in Milford
Blackite Letter re testing access
New Haven Harbor to East Devon Marine Route Review
Cover Letter re EMF Levels Along ROW
Chart of Structures Along ROW with 3-6 mG EMF levels
EMF Mitigation Options for Cross Sections 1-8
Revision to EMF Mitigation Options for Cross Sections 1-8
Route Analysis and Selection - Segments 1 & 2, pgs. 1-20
Route Analysis and Selection - Segments 1 & 2, pgs. 21-39
Route Analysis and Selection - Segments 1 & 2, pgs. 40-59
Route Analysis and Selection - Segments 1&2, pgs. 60-76
Applicant's Errata Pages for June 2 Public Hearing
Route Analysis: Beseck to East Devon via East Shore, pgs. 1-20
Route Analysis: Beseck to East Devon via East Shore, pags. 21-40
Reconstruction of Route 1, Milford - Vol. 2
Rehabilitation of Route 1 Bridge over Housatonic
Reconstruction of Route 1, Orange - Vol. 1
Reconstruction of Route 1, Orange - Vol. 2
Durham Comments re Preferred Routing
Exhibit 2 for Dr. Bailey Supplemental Testimony
Errata for Dr. Bailey Testimony
Appendix to Applicant Buffer Zone Response
Exhibit A of Applicant Buffer Zone Response: Appeal of CSC Docket 105 Decision
Middletown Reliability Project Thermal Final Report
Eastern CT Reliability Project - Stability Analysis
Eastern CT Thermal, Voltage, and Short Circuit Report
to these reports, interested parties may contact the
Siting Council*
CL&P Response to D/W Motion to Reconsider
Exhibit A to CL&P Response
Exhibit B to CL&P Response
Applicant Brief Re Revision of Council's EMF Best Management Practices
OCC Objection to Town Motion to Reconsider
Study for Sunchronous Condenser Option 1 (Case 5c)
Study for Synchronous Condenser Option 2 (Case 5d)
Route Related Construction Projects
Segment Map 1
Segment Map 2
Segment Map 3
Segment Map 4
Segment Map 5
Segment Map 6
Segment Map 7
Segment Map 8
Segment Map 9
Segment Map 10
Segment Map 11
Applicant Response to W/M/O Interrogatory, Q9 - 1/26/05
Applicant Response to W/M/O Interrogatory, Q9 - Attachment
PowerGEM Report 11: Transmission Loading & Voltage Analysis for 387 and 329 Lines Reconductored
PowerGEM Report 12: Transmission & Voltage Analysis for 387 Line Reconductored with 2x954
Map 1 - Segments 1,2,3,4,5
Map 2 - Segments 4,5,6,7,8
Map 3 - Segments 11,12,13
Map 4 - Segments 8,9,10,13,14,15
Map 5 - Segments 16,17,18,19,20
Map 6 - Segments 20,21,22,23,24
Map 7 - Segments 24,25,26,27,28,29
Map 8 - Segments 28,29,30,31
Map 9 - Segments 31,32,33
Map 11 - Segments 36,37,38,39,40
Map 12 - Segments 40,41,42,43,44,45
Map 13 - Segments 44,45,46
System Stability Analysis
Short Circuit Duty Comparisons
System Frequency Scans
Stability Appendix A - Phase II AC Plots
Woodbridge, Milford, Orange, Cheshire letter re taking administrative notice of FERC transcript
KEMA Responses to Applicants' First Interrogatories
KEMA Responses to ISO Interrogatories - 11/22/04
Applicants' Exhibit No. 180 - Tunnel Applications
Wilson Exhibit No. 5 - Map of Royal Oak Bypass
Durham First Selectwoman's Correspondence re Durham Lines
Vermont PSB's Final Decision, Docket 6860
Excerpts from Vermont PSB's Decision
Map of JCC Showing Power Line Easement
Map of Ezra Academy Showing Power Line Easement
Applicant/ISO-New England:
CSC Response to Attorney General Letter
OCC Proposed Findings of Fact
Attorney General Proposed Findings of Fact
Middletown Proposed Findings of Fact
Wilsons' Proposed Findings of Fact
PSEG Memo re Proposed Findings of Fact
PSEG Proposed Findings of Fact (Revised)
Middlefield Proposed Findings of Fact
ISO Proposed Findings of Fact
Weston, Wilton, Fairfield Proposed Findings of Fact
Ezra Academy et al Proposed Findings of Fact
Woodbridge, Cheshire, Durham, Milford, Wallingford Proposed Findings of Fact
Durham/Wallingford Proposed Supplemental Findings of Fact
Woodbridge Proposed Findings of Fact
CL&P/UI Proposed Findings of Fact, Part 1
CL&P/UI Proposed Findings of Fact, Part 2
CL&P/UI Proposed Findings of Fact, Part 3
CL&P/UI Proposed Findings of Fact, Part 4
Amended Fig. 6 to CL&P/UI Proposed FOF
Orange Proposed Findings of Fact
Correction to CL&P/UI Proposed Findings of Fact