The Connecticut Department of Transportation is announcing that a thin surface pavement treatment will be applied on route 58 in Redding, prior to resurfacing in 2021.
The project consists of a thin surface pavement treatment to be placed on Route 58 from South Lane to Route 107. This project is scheduled to occur on Monday, November 2, 2020, and is scheduled to be completed on Tuesday, November 3, 2020.
This project is included in the Department of Transportation’s 2021 Vendor Resurfacing Program.
LANE CLOSURE INFO
Motorists can expect delays and one lane alternating Traffic. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone. The regular work schedule for this project is 7:00 am to 4:00 pm.
Motorists are advised to remain alert, drive cautiously, and to maintain a safe speed in and near the work zone.
Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions.