Skip to Content Skip to Chat
Report an accessibility issue.
Connecticut's Extreme Hot Weather Protocol will be activated from Tuesday, July 14, through Thursday, July 16. Cooling centers are available statewide. To find the nearest location, visit www.211ct.org or call 2-1-1. [READ THE UPDATE]
Connecticut’s Official State Website Logo State of Connecticut
×
 
Close Search
  • Arabic
  • Chinese (Simplified)
  • Chinese (Traditional)
  • English
  • French
  • German
  • Haitian Creole
  • Hindi
  • Italian
  • Korean
  • Pashto
  • Polish
  • Portuguese (Brazil)
  • Russian
  • Spanish
  • Filipino
  • Ukrainian
  • Vietnamese
Core-CT
Core-CT
Core-CT
☰ Core-CT Main Menu
× Close
⮐ Back
⮐ Back
  • Home
  • Core-CT Login
  • News & Updates
  • User Resources & Job Aids
    • Financials
    • Human Capital Management
    • Security Liaisons
    • Self Service
  • Reporting Tools
    • Enterprise Performance Management
    • State Analytical Reporting System
  • Help
    • FAQ
    • Helix
  • Notifications
    • EPM Notifications
    • Financials Notifications
    • HCM Notifications
    • Security Notifications

You are about to Logout

Are you sure you want to log out of your account? If you do want to logout, please click Logout.
Logout
Press Release Homepage

Preliminary Reports for Cost-of-Living Adjustments and Annual Increases

6/16/2026
Core-CT has run the preliminary reports for Cost-of-Living Adjustments and Annual Increases as follows:

COLA effective 6/26/2026 for AGNCY Set ID Salary Plans: AR, AT, CC, CL, CN, CO, CP, DH, DI, DP, DX, DY, DZ, EA, EB, EE, EG, EH, EL, EM, EN, EO, EQ, ES, ET, EU, FD, FE, FF, FG, FJ, FK, FL, FM, FO, FP, FQ, FR, FS, FT, FX, HC, HD, HG, HJ, HM, HN, IE, IN, IO, IP, JA, JZ, LO, LQ, LR, LS, LT, LU, PL, PS, QL, RJ, RK, RL, RQ, RS, RT, RU, RV, RW, RX, RY, RZ,  SA, SH, SI, SJ, SS, ST, T1, T2, T3, T4, TC, TK, TR, TS, TV, TW, TX, TY, U1, U2, U3, U4, U5, V1, V2, V3, V4, V5, VA, VB, XC, XE, XG, XJ, XM, XN, XS 
Process Instance 15010471

COLA effective 6/26/2026 for UNIVS Set ID Salary Plans: AR, CL, CT, DH, DX, DY, DZ, EE, EL, EO, ES, ET, EU, FD, FG, FJ, FK, FL, FM, FP, FR, HC, HD, HG, HJ, HM, HN, LR, LU, PS, PX, RJ, RK, RL, RS, RX, RY, RZ, SH, TC, XC, XG, XJ, XM, XN 
Process Instance 15010597

COLA effective 7/01/2026 for UNIVS Set ID Salary Plans: AN, C1, C2, C3, C4, E1, E2, E3, E4, FA
Process Instance 15010925

July AIs effective 6/26/26 for AGNCY Set ID Salary Plans: AR, AT, CL, CN, CO, CP, DC, DD, DI, DP, DX, DY, DZ, EA, EB, EE, EG, EH, EL, EM, EN, EO, EQ, ES, ET, EU, FD, FE, FF, FG, FK, FL, FM, FO, FP, FQ, FR, FS, FT, FX, HC, HG, HJ, HN, IE, IN, IO, IP, JA, JZ, LO, LQ, LR, LS, LT, LU, PL, PS, QL, RJ, RK, RL, RQ, RS, RT, RU, RV, RW, RX, RY, RZ, SA, SH, SJ, T1, T2, T3, T4, TC, TK, TR, TS, U1, U2, U3, U4, U5, V1, V2, V3, V4, V5, VA, VB, XC, XE, XG, XJ, XN, XS 
Process Instance 15010997

July AI effective 6/26/26 for AGNCY Set ID Salary Plan SP
Process Instance 15011047

July AIs effective 6/26/26 for UNIVS Set ID Salary Plans: AR, CL, CT, DX, DY, DZ, EE, EL, EO, ES, ET, EU, FD, FG, FK, FL, FM, FP, FR, HC, HG, HJ, HN, LR, LU, PS, PX, RJ, RK, RL, RS, RX, RY, RZ, SH, TC, XC, XG, XJ, XN 
Process Instance 15011011

July AIs effective 7/01/26 for AGNCY Set ID Salary Plans: AN, C1, C2, C3, C4, E1, E2, E3, E4, FA
Process Instance 15011029

Bargaining Unit employees who are in range plans must be processed manually.
Agency HR and Payroll Specialists will be able to view the reports in their 'My Reports' queue. The reports (CTHRB356 for COLA's and CTHRB355 for AI's) detail the preliminary mass processing that took place.

Please note that the AI reports will depict the employees eligible for an Annual Increase, however the compensation rate on the preliminary reports will not be accurate because the COLA would need to be in place first in order to be depicted correctly.

To access the reports, select Report Manager under the My Reports section of your home page and select the List tab. Change the 'Last' field to the number of Days since this report has been run (number of days from June 15, 2026). Click refresh (this will return the available report for that process). Click on the report link with the applicable Process Instance number provided above. Each link will have both a processed preliminary report (referenced with the number 2) and an exception preliminary report (referenced with the number 3). Both reports must be reviewed for accuracy and any necessary corrections made before final processing occurs. Final processing will take place on July 2, 2026.  The reports are only available for viewing online for 30 days. If you wish to view the reports beyond 30 days, you must save them.
 
Media Contact:
Core-CT Office
165 Capitol Avenue
Hartford, CT 06106

Core-CT Inquiries:
Email: Core-CT Help Desk Team
Core-CT

165 Capitol Ave, 3rd Floor
Hartford, CT 06103

ct.gov logo with flag embelishment
  • About CT
  • Policies
  • Accessibility
  • Directories
  • Social Media
  • For State Employees
US Flag Status icon
United States
Mast: (Half)
CT Flag Status icon
Connecticut
Mast: (Half)

© 2026 CT.gov - Connecticut's Official State Website