Proposed Individual Permits
When available, supporting documents (draft permits, etc.) are formatted as Adobe PDF files and can be read online or downloaded for printing.
If there are no public notices currently available in a proposed action category (SIP Revisions, General Permits, Individual Permits, Miscellaneous, Adjacent States) that category will not display.
Note: Notices of Proposed Regulations can be viewed on the Connecticut eRegulations website.
Page 4 of 12
-
Iroquois Gas Transmission System LP 8202025
Notice of Extension of the Comment Period for Iroquois Gas Transmission System, L.P. in Brookfield. Public comment period will now end September 16, 2025.
Date Posted: 8/20/2025
-
80 Seaview Avenue, LLC, Norwalk
Notice of tentative determination to approve an application submitted by 80 Seaview Avenue, LLC for proposed activity that includes retaining structures; modifying dock use; adding floats; and, enhancing public access. This activity will affect coastal resources. Written comments due by September 19, 2025.
Date Posted: 8/20/2025
-
Seaview Bridgeport, LLC, Bridgeport
Notice of tentative determination to approve an application submitted by Seaview Bridgeport, LLC for proposed activity that includes placing shoreline riprap. This activity will affect coastal resources. Written comments due by September 19, 2025.
Date Posted: 8/20/2025
-
Notice of tentative determination to approve an application submitted by Bradford Porter for proposed activity that includes the construction of a fixed post-supported walkway, ramp and floating dock. This activity will affect coastal resources and tidal wetlands. Written comments due by September 29, 2025.
Date Posted: 8/20/2025
-
Property Owners Association of Lake Hayward, East Haddam
Notice of tentative determination to approve an application submitted by Property Owners Association of Lake Hayward for a Dam Safety Permit. Written comments due on September 18, 2025.
Date Posted: 8/19/2025
-
Magnakleen Services, LLC, Meriden
Notice of tentative determination for a permit renewal submitted by Magnakleen Services, LLC to discharge a maximum of 14,000 gallons per day of industrial laundry wastewater, air compressor blowdown, vehicle maintenance wastewater, and laboratory sink wastewater to the City of Meriden WPCF from cleaning commercial and industrial mats, towels and dust mops at an industrial laundry service. Written comments due by September 11, 2025.
Date Posted: 8/12/2025
-
Indian River Shops LLC, Clinton
Notice of tentative determination to approve an application submitted by Indian River Shops, LLC for a Dam Safety permit. Written comments due on September 10, 2025.
Date Posted: 8/11/2025
-
Notice of tentative determination to approve an application submitted by Robert Valenti for proposed activity that includes the construction of a fixed post-supported walkway. This activity will affect coastal resources and tidal wetlands. Written comments due by September 17, 2025.
Date Posted: 8/8/2025
-
Notice of tentative determination to approve an application submitted by Maurice Ruggiri for proposed activity that includes constructing a driveway and utility connections for a residential dwelling. This activity will affect coastal resources. Written comments due by September 7, 2025.
Date Posted: 8/8/2025
-
Notice of tentative determination to approve an application submitted by Jennifer Scoggin for proposed activity that includes construction of a residential dock. This activity will affect coastal resources. Written comments due by September 7, 2025.
Date Posted: 8/8/2025
-
Notice of tentative determination to approve an application submitted by Stacy Bland for proposed activity that includes construction of a dock. This activity will affect coastal resources. Written comments due by September 7, 2025.
Date Posted: 8/8/2025
-
74 Little Meadow Road, LLC, Haddam
Notice of tentative determination to approve an application submitted by 74 Little Meadow Road, LLC for proposed activity that includes retaining and repairing existing stone and building a new dock. This activity will affect coastal resources. Written comments due by September 7, 2025.
Date Posted: 8/8/2025
-
Lily Saint and David Freedlander, Madison
Notice of tentative determination to approve an application submitted by Lily Saint and David Freedlander for proposed activity that includes the removal of a fixed timber walkway, irregular-shaped pier, ramp, and float and the construction of a new fixed post-supported walkway, pier, ramp, and float. This activity will affect tidal wetlands. Written comments due by September 17, 2025.
Date Posted: 8/8/2025
-
Notice of tentative determination to approve an application submitted by Scott Marino for proposed activity that includes constructing a dock. This activity will affect coastal resources and tidal wetlands. Written comments due by September 17, 2025.
Date Posted: 8/8/2025
-
Murphy Road Recycling LLC, Bridgeport
Notice of tentative determination to approve an application submitted by Murphy Road Recycling, LLC to construct and operate an Intermediate Processing Center. Written comments due by September 7, 2025.
Date Posted: 8/8/2025