JANUARY 2021
S | M | T | W | T | F | S |
1 | 2 | |||||
3 | 4 | 5 | 6 | 7 | 8 | 9 |
10 | 11 | 12 | 13 | 14 | 15 | 16 |
17 | 18 | 19 | 20 | 21 | 22 | 23 |
24 | 25 | 26 | 27 | 28 | 29 | 30 |
31 |
Friday, January 1, 2021
Office Closed - New Year's Day
Thursday, January 7, 2021
PETITION NO. 1425 – Gaylord Mountain Solar Project 2019, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 1.9-megawatt AC solar photovoltaic electric generating facility located at 360 Gaylord Mountain Road in Hamden, Connecticut, and associated electrical interconnection.
2 PM - Evidentiary Hearing Continuation
Council Evidentiary Hearing Continuation Memorandum, 12/17/20
1. Instruction for Access to Remote Continued Evidentiary Hearing
2. January 7, 2021 Hearing Program
Thursday, January 14, 2021
1PM - Energy/telecommunications Meeting
Meeting Materials for the January 14, 2021 Energy/Telecommunications Meeting
- Draft Minutes of December 17, 2020
- Docket No. 490 (UI/Bridgeport) Draft Findings of Fact
- Docket No. 496 (Tarpon/Windsor) Completion Review and Draft Schedule
- Docket No. 496 (Tarpon/Windsor) Motion for Protective Order
- Petition No. 1422 (Greenskies/East Windsor) Draft Schedule
- Petition No. 1426 (East Windsor Solar One, LLC/East Windsor) Draft Schedule
- Petition No. 1427 (SunJet Energy/Bristol) - Draft Staff Report
- Petition No. 1429 (Eversource/East Granby/Suffield) Request to Commence Construction in Upland Areas
- Petition No. 1434 (Eversource/Farmington) Draft Staff Report
- Tower Share Memorandum
Monday, January 18, 2021
Office Closed - Martin Luther King, Jr. Day
Thursday, January 21, 2021
DOCKET NO. 495- Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at 5151 Park Avenue, Fairfield, Connecticut.
2 PM Evidentiary Hearing/6:30 PM Public Hearing Session
HEARING INFORMATION
January 21, 2020 Hearing Documents
1. Instruction for Public Access to Remote Public Hearing
2. Public Hearing Notice
3. Hearing Program
4. Citizens Guide to Siting Council Procedures; and
5. Proposed Facility Site Plans
Wednesday, January 27, 2021
PETITION NO. 1422 - Greenskies Clean Energy, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 4.99-megawatt AC solar photovoltaic electric generating facility to be located at Mulnite Farms, Inc. off Barber Hill Road west of the intersection with Rockville Road, East Windsor, Connecticut and associated electrical interconnection.
11 AM - Remote Pre-Hearing Teleconference
Thursday, January 28, 2021
1PM - Energy/telecommunications Meeting
Meeting Materials for the January 28, 2021 Energy/Telecommunications Meeting
- Draft Minutes of January 14, 2021
- Docket No. 490 (UI/Bridgeport) Draft Findings of Fact
- Docket No. 490 (UI/Bridgeport) Draft Opinion
- Docket No. 490 (UI/Bridgeport) Draft Decision and Order
- Petition No. 1410 (Greenskies/Stonington) Draft Findings of Fact
- Petition No. 1429 (Eversource/East Granby_Suffield) Partial Development and Management Plan Staff Report
- Petition No. 1433 (Eversource/Watertown/Thomaston/Litchfield/Harwinton) Draft Staff Report
- Petition No. 1433 - Eversource Supplemental Submission, 1/25/21
- Petition No. 1435 (DESPP/Branford) Draft Staff Report
- Council Tower Sharing Memorandum
-
FEBRUARY 2021
S M T W T F S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 Wednesday, February 3, 2021
PETITION NO. 1426 - East Windsor Solar One, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 4.9-megawatt AC solar photovoltaic electric generating facility located west of the Ellington town boundary at 341 East Road, East Windsor, Connecticut, and associated electrical interconnection.
11 AM - Remote Pre-Hearing Teleconference
Wednesday, February 10, 2021
DOCKET NO. 496 - Tarpon Towers II, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at 800 Prospect Hill Road, Windsor, Connecticut.
11 AM - Remote Pre-Hearing Teleconference
Thursday, February 11, 20211PM - Energy/telecommunications Meeting
Meeting Materials for the February 11, 2021 Energy/Telecommunications Meeting
- Draft Minutes of January 28, 2021
- Docket No. 491 (Verizon/Norwich) Draft Findings of Fact
- Docket No. 492 (Gravel Pit Solar/East Windsor) Draft Findings of Fact
- Docket No. 497 ( Burlington Solar One, LLC) Draft Completion Memo and Schedule
- Petition No. 1410 (Greenskies Clean Energy, LLC/Stonington) Draft Findings of Fact
- Petition No. 1410 (Greenskies Clean Energy, LLC/Stonington) Draft Opinion
- Petition No. 1410 (Greenskies Clean Energy, LLC/Stonington) Draft Decision and Order
Friday, February 12, 2021
Office Closed - Lincoln's Birthday
Monday, February 15, 2021
Office Closed - Washington's Birthday
Tuesday, February 23, 2021PETITION NO. 1422 - Greenskies Clean Energy, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 4.99-megawatt AC solar photovoltaic electric generating facility to be located at Mulnite Farms, Inc. off Barber Hill Road west of the intersection with Rockville Road, East Windsor, Connecticut and associated electrical interconnection.
2 PM Evidentiary Hearing/6:30 PM Public Hearing Session
February 23, 2021 Hearing Documents, 01/15/21
1. Instructions for Public Access to Remote Public Hearing
2. Hearing Notice
3. Hearing Program
4. Citizens Guide to Siting Council Procedures; and
5. Proposed Facility Site PlanWednesday, February 24, 2021
DOCKET NO. 497 – Burlington Solar One, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a 3.5-megawatt-AC solar photovoltaic electric generating facility located at Lot 33, Prospect Street, Burlington, Connecticut and associated electrical interconnection.
11AM - Pre-Hearing Tele-conference
Pre-hearing Teleconference Memorandum, 02/17/21
Thursday, February 25, 2021
1PM - Energy/telecommunications Meeting
Meeting Materials for the February 25, 2021 Energy/Telecommunications Meeting
- Draft Minutes of February 11, 2021
- Docket No. 487 (Homeland Towers/New Canaan) Development and Management Plan Draft Staff Report
- Docket No. 491 (Verizon/Norwich) Draft Findings of Fact
- Docket No. 491 (Verizon/Norwich) Draft Opinion
- Docket No. 491 (Verizon/Norwich) Draft Decision and Order
- Docket No. 492 (Gravel Pit Solar/East Windsor) Draft Findings of Fact
- Docket No. 492 (Gravel Pit Solar/East Windsor) Draft Opinion
- Docket No. 492 (Gravel Pit Solar/East Windsor) Draft Decision and Order
- Docket No. 496 (Tarpon Towers/Windsor) T-Mobile Northeast LLC Request for Intervenor Status
- Petition No. 1347A (GRE GACRUZ/Waterford) Request for Tree Clearing, pursuant to Condition No. 4 of the Council's November 5, 2020 Decision and Order, 02/11/21
- Petition No. 1347A (GRE GACRUX/Waterford) Draft Staff Report on Request to Commence Tree Clearing
- Petition No. 1421 (Bristol Solar One) Draft Development and Management Plan Staff Report
- Petition No. 1436 (Groton Utilities) Draft Staff Report
MARCH 2021
S | M | T | W | T | F | S |
1 | 2 | 3 | 4 | 5 | 6 | |
7 | 8 | 9 | 10 | 11 | 12 | 13 |
14 | 15 | 16 | 17 | 18 | 19 | 20 |
21 | 22 | 23 | 24 | 25 | 26 | 27 |
28 | 29 | 30 | 31 |
Tuesday, March 2, 2021
PETITION NO. 1426 - East Windsor Solar One, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 4.9-megawatt AC solar photovoltaic electric generating facility located west of the Ellington town boundary at 341 East Road, East Windsor, Connecticut, and associated electrical interconnection.
2 PM Evidentiary Hearing/6:30 PM Public Hearing Session
HEARING INFORMATION
March 2, 2021 Hearing Documents, 01/15/21
1. Instructions of Public Access to Remote Public Hearing
2, Hearing Notice
3. Hearing Program
4. Citizens Guide to Siting Council Procedures; and
5. Proposed Facility Site Plan
Thursday, March 4, 2021
DOCKET NO. 496 - Tarpon Towers II, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at 800 Prospect Hill Road, Windsor, Connecticut.
2 PM Evidentiary Hearing/6:30 PM Public Hearing Session
March 4, 2021 Hearing Documents
1. Instruction for Public Access to Remote Public Hearing
2. Public Hearing Notice
3. Hearing Program
4. Citizens Guide to Siting Council Procedures; and
5. Proposed Facility Site Plans
Thursday, March 11, 2021
1PM - Energy/telecommunications Meeting (Agenda)
Meeting Materials for the March 11, 2021 Energy/Telecommunications Meeting
- Draft February 25, 2021 Energy/Telecommunications Meeting Minutes
- Petition No. 1385 (Cobb Rd. LLC/Old Lyme) - Partial D&M Plan Draft Staff Report
- Petition No. 1395A (Windham Solar/Ansonia) - Draft Staff Report
- Petition No. 1397 (Constitution Solar/Plainfield) - D&M Plan Draft Staff Report
- Petition No. 1417 (DG CT Solar II, LLC/Watertown) - D&M Plan Draft Staff Report
- Petition No. 1425 - Draft Findings of Fact
Tuesday, March 23, 2021
DOCKET NO. 497 – Burlington Solar One, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a 3.5-megawatt-AC solar photovoltaic electric generating facility located at Lot 33, Prospect Street, Burlington, Connecticut and associated electrical interconnection.
2 PM Evidentiary Hearing/6:30 PM Public Hearing Session
March 23, 2021 Hearing Documents
1. Instruction for Public Access to Remote Public Hearing
2. Public Hearing Notice
3. Hearing Program
4. Citizens Guide to Siting Council Procedures; and
5. Proposed Facility Site Plans
Thursday, March 25, 2021
1PM - Energy/telecommunications Meeting
Meeting Materials for the March 25, 2021 Energy/Telecommunications Meeting
- Draft Energy/Telecommunications Meeting Minutes of March 11, 2021
- PETITION NO. 1310A (Quinebaug Solar/Canterbury/Brooklyn) - Draft Partial D&M Plan Staff Report
- PETITION NO. 1347A (GRE GACRUX LLC/Waterford) - Draft Partial D&M Plan Staff Report
- PETITION NO. 1425 (Gaylord Mountain Solar Project/Hamden) - Draft Findings of Fact
- PETITION NO. 1425 (Gaylord Mountain Solar Project/Hamden) - Draft Opinion
- PETITION NO. 1425 (Gaylord Mountain Solar Project/Hamden) - Draft Decision & Order
- PETITION NO. 1438 (Bloom Energy/Simsbury) - Draft Staff Report
- PETITION NO. 1439 (Eversource/Canton) - Draft Staff Report
- PETITION NO. 1442 (SR Litchfield/Litchfield/Torrington) Request for Party Status
APRIL 2021
S | M | T | W | T | F | S |
1 | 2 | 3 | ||||
4 | 5 | 6 | 7 | 8 | 9 | 10 |
11 | 12 | 13 | 14 | 15 | 16 | 17 |
18 | 19 | 20 | 21 | 22 | 23 | 24 |
25 | 26 | 27 | 28 | 29 | 30 |
Friday, April 2, 2021
Office Closed -Good Friday
Thursday, April 8, 2021
1PM - Energy/telecommunications Meeting
Meeting Materials for the April 8, 2021 Energy/Telecommunications Meeting
- Draft Energy/Telecommunications Meeting Minutes of March 25, 2021
- DOCKET NO. 495 (Verizon/Fairfield) - Draft Findings of Fact
- DOCKET NO. 498 (Diamond Towers V, LLC/Cheshire) Draft Completeness Review/Schedule
- DOCKET NO. 498 (Diamond Towers V, LLC/Cheshire) Request for Status
- DOCKET NO. 499 (Homeland Towers/New Cingular/Sherman) Draft Completeness Review/Schedule
- PETITION NO. 1134A (New Cingular/Wilton) Draft Staff Report
- PETITION NO. 1422 (Greenskies Clean Energy, LLC/East Windsor) Draft Findings of Fact
- PETITION NO. 1431 (SunJet Energy, LLC/Bethlehem) Draft Staff Report
- PETITION NO. 1443 (SR North Stonington, LLC) Town of North Stonington Request for Public Hearing
Tuesday, April 13, 2021
DOCKET NO. 497 - Burlington Solar One, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance and operation of a 3.5-megawatt AC solar photovoltaic electric generating facility located at Lot 33, Prospect Street, Burlington, Connecticut and associated electrical interconnection. Link to Petition No. 1437
2PM - Remote Evidentiary Hearing Continuation via Zoom Conferencing
Wednesday, April 21, 2021
DOCKET NO. 498 – Diamond Towers V, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at 185 Academy Road (Route 68/Route 70), Cheshire, Connecticut.
Thursday, April 22, 2021
1PM - Energy/telecommunications Meeting
Meeting Materials for the April 22, 2021 Energy/Telecommunications Meeting
- Draft Minutes of April 8, 2021
- Docket No. 495 (Verizon/Fairfield) - Draft Findings of Fact
- Docket No. 495 (Verizon/Fairfield) - Draft Opinion
- Docket No. 495 (Verizon/Fairfield) - Draft Decision and Order
- Docket No. 500 (Arx/Milford) - Draft Completeness Review and Schedule
- Docket No. 500 (Arx/Milford) - Verizon Request for Intervenor Status
- Docket No. 500 (Arx/Milford) - AT&T Request for Intervenor Status
- Docket No. 501 (AT&T/Lakeville[Salisbury]) - Draft Completeness Review and Schedule
- Petition No. 1222A (Windham Solar/Hampton) - Draft Staff Report
- Petition No. 1395A (Windham Solar/Ansonia) - Motion to Vacate, and in the Alternative, to Reconsider the Decision of March 12, 2021
- Petition No. 1395A (Windham Solar/Ansonia) - Draft Staff Report
- Petition No. 1422 (Greenskies/East Windsor) - Draft Findings of Fact
- Petition No. 1422 (Greenskies/East Windsor) - Draft Opinion
- Petition No. 1422 (Greenskies/East Windsor) - Draft Decision and Order
- Petition No. 1426 (East Windsor Solar) - Draft Findings of Fact
- Petition No. 1443 (SR North Stonington) - Draft Schedule
Wednesday, April 28, 2021
DOCKET NO. 499 - Homeland Towers, LLC and New Cingular Wireless PCS, LLC d/b/a AT&T application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at 16 Coote Hill Road, Sherman, Connecticut.
11 AM - Remote Pre-Hearing Teleconference
MAY 2021
S | M | T | W | T | F | S |
1 | ||||||
2 | 3 | 4 | 5 | 6 | 7 | 8 |
9 | 10 | 11 | 12 | 13 | 14 | 15 |
16 | 17 | 18 | 19 | 20 | 21 | 22 |
23 | 24 | 25 | 26 | 27 | 28 | 29 |
30 | 31 |
Wednesday, May 5, 2021
PETITION NO. 1443 - SR North Stonington, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 9.9-megawatt AC solar photovoltaic electric generating facility on five parcels located north and south of Providence New London Turnpike (State Route 184), west of Boombridge Road and north of Interstate 95 in North Stonington, Connecticut, and associated electrical interconnection.
11 AM - Pre-Hearing Teleconference
Thursday, May 6, 2021
1PM - Energy/telecommunications Meeting
Meeting Materials for the May 6, 2021 Energy/Telecommunications Meeting
- Draft Energy/telecommunications April 22, 2021 Meeting Minutes
- DOCKET NO. 494 (Verizon/Wolcott) - Draft Findings of Fact
- DOCKET NO. 497 (Burlington Solar One) - Applicant's Submission of Revised Response to Interrogatory No. 38
- DOCKET NO. 498 (Diamond Towers/Cheshire) - Motion for Protective Order
- DOCKET NO. 499 (Homeland/AT&T/Sherman) - Motion for Protective Order
- DOCKET NO. 500 (Arx Wireless/Milford) - City of Milford Notice of Intent to Be a Party
- PETITION NO. 1097A (Cingular/Suffield) - Draft Staff Report
- PETITION NO. 1398A (LSE Pictor/Winchester) - Draft Staff Report
- PETITION NO. 1406 (Doosan Fuel Cell/Bridgeport) - Motion to Reopen and Modify
- PETITION NO. 1406 (Doosan Fuel Cell/Bridgeport) - Joe Provey Request for Intervenor and CEPA Intervenor Status
-
PETITION NO. 1406 (Doosan Fuel Cell/Bridgeport) - Joe Provey Supplement to Request for Intervenor Status
-
PETITION NO. 1406 (Doosan Fuel Cell/Bridgeport) - NuPower Opposition to Provey Intervenor Request
- PETITION NO. 1426 (East Windsor Solar) - Draft Findings of Fact
- PETITION NO. 1426 (East Windsor Solar) - Draft Opinion
- PETITION NO. 1426 (East Windsor Solar) - Draft Decision and Order
- PETITION NO. 1440 (Verizon/New Haven) - Draft Staff Report
- PETITION NO. 1441 (Bloom Energy/New London) - Draft Staff Report
- Tower Share Annotated Memorandum, 04/30/21
Tuesday, May 11, 2021
DOCKET NO. 498 – Diamond Towers V, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at 185 Academy Road (Route 68/Route 70), Cheshire, Connecticut.
2 PM Evidentiary Hearing/6:30 PM Public Hearing Session
May 11, 2021 Hearing Documents, 04/12/21
1. Instructions for Public Access to Remote Public Hearing
2. Public Hearing Notice
3. Hearing Program
4. Citizens Guide to Siting Council Procedures
5. Proposed Facility Site Plan
Wednesday, May 19, 2021
DOCKET NO. 500 - Arx Wireless Infrastructure, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at 1061-1063 Boston Post Road, Milford, Connecticut.
11 AM - Pre-Hearing Teleconference
Thursday, May 20, 2021
1PM - Energy/telecommunications Meeting
Meeting Materials for the May 20, 2021 Energy/Telecommunications Meeting
- Draft Energy/telecommunications May 6, 2021 Meeting Minutes
- DOCKET NO. 261 (AT&T/Oxford) - T-Mobile Request to Reopen and Modify the Decision and Order
- DOCKET NO. 261 (AT&T/Oxford) - Draft Reopening Staff Report
- DOCKET NO. 411 (AT&T/Old Saybrook) - Request for Transfer of Certificate
- DOCKET NO. 492 (Gravel Pit Solar/East Windsor) - Draft Partial D&M Staff Report
- DOCKET NO. 494 (Verizon/Wolcott) - Draft Findings of Fact
- DOCKET NO. 494 (Verizon/Wolcott) - Draft Opinion
- DOCKET NO. 494 (Verizon/Wolcott) - Draft Decision and Order
- DOCKET NO. 496 (Tarpon Towers/Windsor) - Draft Findings of Fact
- DOCKET NO. 501 (AT&T/Salisbury(Lakeville)) - Motion for Protective Order
- PETITION NO. 1424 (Southington Solar) - Draft Staff Report
- PETITION NO. 1446 (AT&T/Windsor Locks) - Draft Staff Report
- PETITION NO. 1447 (AT&T/Danbury) - Draft Staff Report
- PETITION NO. 1449 (AT&T/Woodstock) - Draft Staff Report
- Tower Share Memorandum
Tuesday, May 25, 2021
DOCKET NO. 499 - Homeland Towers, LLC and New Cingular Wireless PCS, LLC d/b/a AT&T application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at 16 Coote Hill Road, Sherman, Connecticut.
2 PM Evidentiary Hearing/6:30 PM Public Hearing Session
Wednesday, May 26, 2021
DOCKET NO. 501 - New Cingular Wireless PCS, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at 106 Sharon Road, Lakeville (Salisbury), Connecticut.
11 AM - Pre-Hearing Teleconference
Monday, May 31, 2021
Office Closed -Memorial Day
JUNE 2021
S | M | T | W | T | F | S |
1 | 2 | 3 | 4 | 5 | ||
6 | 7 | 8 | 9 | 10 | 11 | 12 |
13 | 14 | 15 | 16 | 17 | 18 | 19 |
20 | 21 | 22 | 23 | 24 | 25 | 26 |
27 | 28 | 29 | 30 |
Thursday, June 3, 2021
1PM - Energy/telecommunications Meeting
Meeting Materials for the June 3, 2021 Energy/Telecommunications Meeting
- Draft Energy/Telecommunications May 20, 2021 Meeting Minutes
- DOCKET NO. 496 (Tarpon Towers/Windsor) - Draft Findings of Fact
- DOCKET NO. 496 (Tarpon Towers/Windsor) - Draft Opinion
- DOCKET NO. 496 (Tarpon Towers/Windsor) - Draft Decision and Order
- DOCKET NO. 502 (Verizon/Woodbridge) - Draft Completeness Review/Schedule
- DOCKET NO. 502 (Verizon/Woodbridge) - Motion for Protective Order
- DOCKET NO. 503 (Arx Wireless/New Britain) - Draft Completeness Review/Schedule
- DOCKET NO. 503 (Arx Wireless/New Britain) - AT&T Request for Intervenor Status
- PETITION NO. 1443 (SR North Stonington, LLC) - Town of North Stonington Request for Party Status
- PETITION NO. 1444 (CP NB Solar I and II/North Branford) - Draft Staff Report
- PETITION NO. 1448 (Eversource/Lebanon) - Draft Staff Report
- PETITION NO. 1450 (ClearCell Power/West Haven) - Draft Staff Report
Tuesday, June 8, 2021
PETITION NO. 1443 - SR North Stonington, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 9.9-megawatt AC solar photovoltaic electric generating facility on five parcels located north and south of Providence New London Turnpike (State Route 184), west of Boombridge Road and north of Interstate 95 in North Stonington, Connecticut, and associated electrical interconnection.
2 PM Evidentiary Hearing/6:30 PM Public Hearing Session
June 8, 2021 Hearing Documents, 04/23/21
1. Instruction of Public Access to Remote Public Hearing
2. Hearing Notice
3. Hearing Program
4. Citizens Guide to Siting Council Procedures; and
5. Proposed Facility Site Plan
Tuesday, June 15, 2021
DOCKET NO. 500 - Arx Wireless Infrastructure, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at 1061-1063 Boston Post Road, Milford, Connecticut.
2 PM Evidentiary Hearing/6:30 PM Public Hearing Session
June 15, 2021 Hearing Documents, 04/26/21
1. Instructions for Public Access to Remote Public Hearing
2. Public Hearing Notice
3. Hearing Program
4. Citizens Guide to Siting Council Procedures
5. Proposed Facility Site Plan
Wednesday, June 16, 2021
DOCKET NO. 502 - Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at 118 Newton Road, Woodbridge, Connecticut.
11 AM - Pre-remote Hearing Tele-Conference
Thursday, June 17, 2021
1PM - Energy/telecommunications Meeting
Meeting Materials for the June 17, 2021 Energy/Telecommunications Meeting
- Draft Energy/Telecommunications June 3, 2021 Meeting Minutes
- DOCKET NO. 497 (Burlington Solar One) - Draft Findings of Fact
- DOCKET NO. 502 (Verizon/Woodbridge) - Woodbridge Newton Neighborhood Environmental Trust Application to Intervene Under CEPA §22a-19, §4-177a and §16-50n
- DOCKET NO. 502 (Verizon/Woodbridge) - Town of Woodbridge Request for Party Status
- PETITION NO. 1395A (Windham Solar/Ansonia) - Decision on Reconsideration of March 12, 2021 Final Decision Draft Staff Report
- PETITION NO. 1406A - NuPower Objection and Motion to Strike Joseph Provey's June 8, 2021 Public Comment Filing
- PETITION NO. 1406A - Provey Response to NuPower's Objection and Motion to Strike
- PETITION NO. 1445 (Eversource/Wallingford) - Draft Staff Report
- PETITION NO. 1452 (AT&T/Greenwich) - Draft Staff Report
Wednesday, June 23, 2021
DOCKET NO. 503 - Arx Wireless Infrastructure, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at 43 Osgood Avenue, New Britain, Connecticut.
11 AM - Pre-remote Hearing Tele-Conference
Thursday, June 24, 2021
DOCKET NO. 499 - Homeland Towers, LLC and New Cingular Wireless PCS, LLC d/b/a AT&T application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at 16 Coote Hill Road, Sherman, Connecticut.
2 PM Remote Evidentiary Hearing Continuation via Zoom Conferencing
1. Instructions for Public Access to Remote Evidentiary Hearing
2. June 24, 2021 Hearing Program
Tuesday, June 29, 2021
DOCKET NO. 501 - New Cingular Wireless PCS, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at 106 Sharon Road, Lakeville (Salisbury), Connecticut.
2 PM Evidentiary Hearing/6:30 PM Public Hearing Session
June 29, 2021 Hearing Documents, 04/26/21
1. Instructions for Public Access to Remote Public Hearing
2. Public Hearing Notice
3. Hearing Program (not available at this time)
4. Citizens Guide to Siting Council Procedures
JULY 2021
S | M | T | W | T | F | S |
1 | 2 | 3 | ||||
4 | 5 | 6 | 7 | 8 | 9 | 10 |
11 | 12 | 13 | 14 | 15 | 16 | 17 |
18 | 19 | 20 | 21 | 22 | 23 | 24 |
25 | 26 | 27 | 28 | 29 | 30 | 31 |
Thursday, July 1, 2021
1PM - Energy/telecommunications Meeting - CANCELED
Monday, July 5, 2021
Office Closed -Independence Day
Thursday, July 8, 2021
PETITION NO. 1443 - SR North Stonington, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 9.9-megawatt AC solar photovoltaic electric generating facility on five parcels located north and south of Providence New London Turnpike (State Route 184), west of Boombridge Road and north of Interstate 95 in North Stonington, Connecticut, and associated electrical interconnection.
2 PM - Continued Remote Evidentiary Hearing via Zoom Conferencing
Tuesday, July 13, 2021
DOCKET NO. 502 - Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at 118 Newton Road, Woodbridge, Connecticut.
2 PM Evidentiary Hearing/6:30 PM Public Hearing Session
July 13, 2021 Hearing Documents, 06/04/21
1. Instructions for Public Access to Remote Public Hearing
2. Public Hearing Notice
3. Hearing Program
4. Citizens Guide to Siting Council Procedures
Thursday, July 15, 2021
1PM - Energy/telecommunications Meeting
Meeting Materials for the July 15, 2021 Energy/Telecommunications Meeting
- Draft Energy/Telecommunications June 17, 2021 Meeting Minutes
- Docket No. 242 (AT&T/Andover) - Motion to Reopen and Modify the Decision and Order
- Docket No. 242 (AT&T/Andover) - Motion to Reopen and Modify the Decision and Order Draft Staff Report
- Docket No. 488 (Homeland/Kent) - D&M Plan
- Docket No. 488 (Homeland/Kent) - Draft D&M Plan Staff Report
- Docket No. 497 (Burlington Solar One) - Draft Findings of Fact
- Docket No. 497 (Burlington Solar One) - Draft Opinion
- Docket No. 497 (Burlington Solar One) - Draft Decision and Order
- Docket No. 503 (Arx Wireless/New Britain) - City of New Britain Request for Party Status
- Docket No. 503 (Arx Wireless/New Britain) - Motion for Protective Order
- Docket No. 504 (Arx Wireless/Glastonbury) - Completeness Review and Schedule
- Docket No. 504 (Arx Wireless/Glastonbury) - AT&T Request for Intervenor Status
- Petition No. 1406A (Doosan/Bridgeport) - Allco Renewable Energy Limited Request for CEPA Intervenor Status
- Petition No. 1406A (Doosan/Bridgeport) - Provey Request for a Public Hearing
- Petition No. 1406A (Doosan/Bridgeport) - Allco Renewable Energy Limited Support of Provey Request for a Public Hearing
- Petition No. 1406A (Doosan/Bridgeport) NuPower Opposition to Request by Joseph Provey for a Public Hearing
- Petition No. 1451 (C-Tec Solar/Ellington) - Draft Staff Report
Tuesday, July 20, 2021
DOCKET NO. 503 - Arx Wireless Infrastructure, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at 43 Osgood Avenue, New Britain, Connecticut.
2 PM Evidentiary Hearing/6:30 PM Public Hearing Session
July 20, 2021 Hearing Documents, 06/07/21
1. Instruction for Public Access to Remote Public Hearing
2. Public Hearing Notice
3. Hearing Program
4. Citizens Guide to Siting Council Procedures
Tuesday, July 27, 2021
DOCKET NO. 500 - Arx Wireless Infrastructure, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at 1061-1063 Boston Post Road, Milford, Connecticut.
2 PM Council Evidentiary Continued Hearing Memorandum
1. Instructions for Access to Remote Continued Evidentiary Hearing
2. July 27, 2021 Hearing Program
Wednesday, July 28, 2021
DOCKET NO. 504 - Arx Wireless Infrastructure, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at Lot N-4, Sequin Drive, Glastonbury, Connecticut.
11 AM -Remote Pre-Hearing Tele-Conference
Remote Hearing Procedure Memorandum and Pre-Remote Hearing Teleconference, 07/22/21
Thursday, July 29, 2021
1 PM - Energy/telecommunications Meeting
Meeting Materials for the July 29, 2021 Energy/Telecommunications Meeting
- Draft July 15, 2021 Energy/Telecommunications Meeting Minutes
- DOCKET NO. 498 (Diamond Towers V, LLC/Cheshire) - Draft Findings of Fact
- DOCKET NO. 505 (Haddam Quarter Solar, LLC/Durham) - Draft Completeness Review and Schedule
- DOCKET NO. 505 (Haddam Quarter Solar, LLC/Durham) - Motion for Protective Order
- PETITION NO. 1395A (Windham Solar/Ansonia) - Draft D&M Staff Report
- PETITION NO. 1426 (DG Connecticut Solar II, LLC/East Windsor) - Draft D&M Staff Report
- PETITION NO. 1453 (Eversource Energy/Killingly) - Draft Staff Report
- PETITION NO. 1454 (Eversource Energy/Mansfield) - Draft Staff Report
- PETITION NO. 1455 (Eversource Energy/Stonington) - Draft Staff Report
AUGUST 2021
S | M | T | W | T | F | S |
1 | 2 | 3 | 4 | 5 | 6 | 7 |
8 | 9 | 10 | 11 | 12 | 13 | 14 |
15 | 16 | 17 | 18 | 19 | 20 | 21 |
22 | 23 | 24 | 25 | 26 | 27 | 28 |
29 | 30 | 31 |
Thursday, August 12, 2021
1 PM - Energy/telecommunications Meeting
Meeting Materials for the August 12, 2021 Energy/Telecommunications Meeting
- Energy/Telecommunications July 29, 2021 Draft Meeting Minutes
- DOCKET NO. 496 (Tarpon Towers II/Windsor) - Draft D&M Staff Report
- DOCKET NO. 498 (Diamond Towers V/Cheshire) - Draft Findings of Fact
- DOCKET NO. 498 (Diamond Towers V/Cheshire) - Draft Opinion
- DOCKET NO. 498 (Diamond Towers V/Cheshire) - Draft Decision and Order
- DOCKET NO. 499 (Homeland Towers/ATT/Sherman) - Draft Findings of Fact
- DOCKET NO. 501 (ATT/Salisbury) - Draft Findings of Fact
Thursday, August 19, 2021
DOCKET NO. 504 - Arx Wireless Infrastructure, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at Lot N-4, Sequin Drive, Glastonbury, Connecticut.
2 PM Evidentiary Hearing/6:30 PM Public Hearing Session
August 19, 2021 Hearing Documents, 07/16/21
1. Instructions for Public Access to Remote Public Hearing
2. Public Hearing Notice
3. Hearing Program
4. Citizens Guide to Siting Council Procedures
5. Proposed Facility Site Plan
Wednesday, August 25, 2021
DOCKET NO. 505 – Haddam Quarter Solar, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a 2.8-megawatt-AC solar photovoltaic electric generating facility located south of Haddam Quarter Road and north of Johnson Lane, Durham, Connecticut and associated electrical interconnection.
11 AM - Remote Hearing Procedure Memorandum and Pre-Remote Hearing Teleconference, 08/19/21
Thursday, August 26, 2021
1PM - Energy/telecommunications Meeting
Meeting Materials for the August 26, 2021 Energy/Telecommunications Meeting
- Energy/Telecommunication August 12, 2021 Draft Meeting Minutes
- DOCKET NO. 499 (Homeland Towers/AT&T/Sherman) - Draft Findings of Fact
- DOCKET NO. 499 (Homeland Towers/AT&T/Sherman) - Draft Opinion
- DOCKET NO. 499 (Homeland Towers/AT&T/Sherman) - Draft Decision and Order
- DOCKET NO. 501 (AT&T/Lakeville(Salisbury)) - Draft Findings of Fact
- DOCKET NO. 501 (AT&T/Lakeville(Salisbury)) - Draft Opinion
- DOCKET NO. 501 (AT&T/Lakeville(Salisbury)) - Draft Decision and Order
- PETITION NO. 1443 (SR North Stonington) - Draft Findings of Fact
- PETITION NO. 1458 (Homestead Fuel Cell 1, LLC/Hartford) - Allco Renewable Energy Limited (Allco) Request for CEPA Intervenor Status
- PETITION NO. 1458 (Homestead Fuel Cell 1, LLC/Hartford) - Opposition to Allco Request for Status
- Tower Share Memorandum
Tuesday, August 31, 2021
DOCKET NO. 502 - Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at 118 Newton Road, Woodbridge, Connecticut.
2PM - Evidentiary Hearing Session Continued via Zoom Conferencing
1. Instructions for Public Access to Remote Continued Evidentiary Hearing Session on August 31, 2021
2. Hearing Program
SEPTEMBER 2021
S | M | T | W | T | F | S |
1 | 2 | 3 | 4 | |||
5 | 6 | 7 | 8 | 9 | 10 | 11 |
12 | 13 | 14 | 15 | 16 | 17 | 18 |
19 | 20 | 21 | 22 | 23 | 24 | 25 |
26 | 27 | 28 | 29 | 30 |
Thursday, September 2, 2021
DOCKET NO. 503 - Arx Wireless Infrastructure, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at 43 Osgood Avenue, New Britain, Connecticut.
2PM - Evidentiary Hearing Session Continued via Zoom Conferencing
Council Memorandum Regarding the Continuation of the Evidentiary Hearing Session, 07/21/21
1. Instructions for Access to the September 2, 2021 Continued Evidentiary Hearing Session
2. Hearing Program
Monday, September 6, 2021
Office Closed - Labor Day
Thursday, September 9, 2021
1PM - Energy/telecommunications Meeting
Meeting Materials for the September 9, 2021 Energy/Telecommunications Meeting
- Energy/Telecommunications August 26, 2021 Draft Meeting Minutes
- DOCKET NO. 500 (Arx/Milford) - Draft Findings of Fact
- PETITION NO. 1350 (EIP/New Britain) Motion to Reopen and Modify
- PETITION NO. 1443 (SN North Stonington) - Draft Findings of Fact
- PETITION NO. 1443 (SN North Stonington) - Draft Opinion
- PETITION NO. 1443 (SN North Stonington) - Draft Decision and Order
- PETITION NO. 1456 (Eversource/Lebanon/Willimantic) - Draft Staff Report
- PETITION NO. 1461 (SBA/Groton) - AT&T Request for Intervenor Status
- Tower Share Memorandum
Tuesday, September 21, 2021
DOCKET NO. 502 - Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at 118 Newton Road, Woodbridge, Connecticut.
2PM - Evidentiary Hearing Session Continued via Zoom Conferencing
Council Memorandum Regarding Conclusion of Evidentiary Hearing, 09/01/21
1. Instructions for Access to the September 21, 2021 Evidentiary Hearing Session
2. Hearing Program
Thursday, September 23, 2021
1PM - Energy/telecommunications Meeting Revised Agenda
Meeting Materials for the September 23, 2021 Energy/Telecommunications Meeting
- Energy/Telecommunications September 9, 2021 Draft Meeting Minutes
- Docket No. 497 (Burlington Solar One) Draft D&M Plan Staff Report
- Docket No. 500 (Arx Wireless/Milford) Draft Findings of Fact
- Docket No. 500 (Arx Wireless/Milford) Draft Opinion
- Docket No. 500 (Arx Wireless/Milford) Draft Decision and Order
- Docket No. 503 (Arx Wireless/New Britain) City of New Britain Request for Extension of Time to Submit Post Hearing Brief and Proposed Findings of Fact
- Petition No. 983 (BNE Energy/Colebrook) Request for Extension of Time to Complete Construction
- Petition No. 1347A (GRE GACRUX/Waterford) Draft D&M Plan Staff Report
- Petition No. 1406A (NuPower/Bridgeport) Allco Renewable Energy Limited's Motion to Compel Interrogatory Responses and Motion to Strike
- Petition No. 1406A (NUPower/Bridgeport) NuPower Opposition to Allco's Motion to Compel Interrogatory Responses and Motion to Strike
- Petition No. 1442 (SR Litchfield/Torrington) Draft Staff Report
- Petition No. 1457 (Eversource Energy/Canaan/Salisbury) Draft Staff Report
- Tower Share Memorandum
Tuesday, September 28, 2021
DOCKET NO. 505 – Haddam Quarter Solar, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a 2.8-megawatt-AC solar photovoltaic electric generating facility located south of Haddam Quarter Road and north of Johnson Lane, Durham, Connecticut and associated electrical interconnection.
2 PM Evidentiary Hearing/6:30 PM Public Hearing Session
OCTOBER 2021
S | M | T | W | T | F | S |
1 | 2 | |||||
3 | 4 | 5 | 6 | 7 | 8 | 9 |
10 | 11 | 12 | 13 | 14 | 15 | 16 |
17 | 18 | 19 | 20 | 21 | 22 | 23 |
24 | 25 | 26 | 27 | 28 | 29 | 30 |
31 |
Tuesday, October 5, 2021
DOCKET NO. 503 - Arx Wireless Infrastructure, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at 43 Osgood Avenue, New Britain, Connecticut.
2PM - Limited Evidentiary Hearing Session via Zoom Conferencing
Council Memorandum Regarding Limited Reopening of Evidentiary Record, 09/24/21
1. Instructions for Access to the October 5, 2021 Limited Evidentiary Hearing Session
2. Hearing Program
Thursday, October 7, 2021
1PM - Energy/telecommunications Meeting
Monday, October 11, 2021
Office Closed - Columbus Day
October 19, 2021
DOCKET NO. 502 - Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at 118 Newton Road, Woodbridge, Connecticut.
2PM - Evidentiary Hearing Session Continued via Zoom Conferencing
Council Memorandum Regarding Ruling on Motions and the Conclusion of Evidentiary Hearing Session, 09/22/21
1. Instructions for Access to the October 19, 2021 Evidentiary Hearing Session
2. Hearing Program
Thursday, October 21, 2021
1PM - Energy/telecommunications Meeting
Meeting Materials for the October 21, 2021
- October 7, 2021 Draft Energy/Telecommunications Meeting Minutes
- DOCKET NO. 500 (ARX Wireless/Milford) - ARX Wireless Infrastructure, LLC Petition for Reconsideration
- DOCKET NO. 500 (ARX Wireless/Milford) - Council Decision Signature Sheet
- DOCKET NO. 504 (ARX Wireless/Glastonbury) - Draft Findings of Fact
- DOCKET NO. 506 (AT&T/Middletown) - Draft Completeness Review
- PETITION NO. 1460 (Greenskies/Goshen) - Draft Staff Report
- Tower Share Memorandum
- Fiscal Year 2023 Revised Budget
NOVEMBER 2021
S | M | T | W | T | F | S |
1 | 2 | 3 | 4 | 5 | 6 | |
7 | 8 | 9 | 10 | 11 | 12 | 13 |
14 | 15 | 16 | 17 | 18 | 19 | 20 |
21 | 22 | 23 | 24 | 25 | 26 | 27 |
28 | 29 | 30 |
Wednesday, November 3, 2021
DOCKET NO. 506 - New Cingular Wireless PCS, LLC (AT&T) application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a wireless telecommunications facility located at 499 Mile Lane, Middletown, Connecticut.
11AM - Pre-Remote Hearing Teleconference
Thursday, November 4, 2021
1PM - Energy/telecommunications Meeting - CANCELED
Thursday, November 11, 2021
Office Closed - Veterans' Day
Wednesday, November 17, 2021
FORECAST-2021/2022 - Connecticut Siting Council 2021 Review of the Ten-Year Forecast of Connecticut Electric Loads and Resources. Public Comment Session Schedule.
November 17, 2021 Public Session Notice, 10/12/21
Instructions for Public Access to Remote Zoom November 17, 2021 Public Session
Thursday, November 18, 2021
1PM - Energy/telecommunications Meeting
Meeting Materials for the November 18, 2021 Agenda
- October 21, 2021 Draft Energy Telecommunications Meeting Minutes
- DOCKET NO. 489 (First Taxing District Water Dept./Norwalk) - Draft D&M Staff Report
- DOCKET NO. 491 (Verizon/Norwich) - Draft D&M Staff Report
- DOCKET NO. 504 (Arx Wireless/Glastonbury) - Draft Findings of Fact
- DOCKET NO. 504 (Arx Wireless/Glastonbury) - Draft Opinion
- DOCKET NO. 504 (Arx Wireless/Glastonbury) - Draft Decision & Order
- DOCKET NO. 505 (Haddam Quarter Solar/Durham) - Draft Findings of Fact
- PETITION NO. 1444 (CPNB Solar I and II/North Branford) - Draft Partial D&M Plan Staff Report
- PETITION NO. 1461 (SBA/Groton) - Draft Staff Report
- PETITION NO. 1462 (Distributed Solar Operations/IKEA/New Haven) - Draft Staff Report
- PETITION NO. 1464 (Eversource/Vernon) - Draft Staff Report
- Tower Share Memorandum (Consent Calendar)
Thursday, November 25, 2021
Office Closed - Thanksgiving Day
Tuesday, November 30, 2021
DOCKET NO. 506 - New Cingular Wireless PCS, LLC (AT&T) application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a wireless telecommunications facility located at 499 Mile Lane, Middletown, Connecticut.
2PM - Evidentiary Hearing Session/Public Session via Zoom Conferencing
November 30, 2021 Hearing Documents, 10/22/21
1. Instructions for Public Access to Remote Public Hearing on November 30, 2021
2. Public Hearing Notice
3. Hearing Program (currently not available)
4. Citizens Guide to Siting Council Procedures
5. Proposed Facility Site Plan
DECEMBER 2021
S | M | T | W | T | F | S |
1 | 2 | 3 | 4 | |||
5 | 6 | 7 | 8 | 9 | 10 | 11 |
12 | 13 | 14 | 15 | 16 | 17 | 18 |
19 | 20 | 21 | 22 | 23 | 24 | 25 |
26 | 27 | 28 | 29 | 30 | 31 |
Thursday, December 2, 2021
1PM - Energy/telecommunications Meeting
Thursday, December 16, 2021
1PM - Energy/telecommunications Meeting
Meeting Materials for the December 16, 2021 Agenda
- December 2, 2021 Draft Energy/Telecommunications Meeting Minutes
- DOCKET NO. 474 (Eversource/GHCCP) Motion for Protective Order
- DOCKET NO. 502 (Verizon/Woodbridge) Draft Findings of Fact
- DOCKET NO. 502 (Verizon/Woodbridge) Draft Opinion
- DOCKET NO. 502 (Verizon/Woodbridge) Draft Decision and Order
- DOCKET NO. 503 (Arx Wireless/New Britain) Draft Findings of Fact
- DOCKET NO. 503 (Arx Wireless/New Britain) Draft Opinion
- DOCKET NO. 503 (Arx Wireless/New Britain) Draft Decision and Order
- PETITION NO. 1350A (EIP/New Britain) - Draft Staff Report
- PETITION NO. 1443 (SR North Stonington) - Motion to Reopen and Modify
- PETITION NO. 1444 (CP NB Solar/North Branford) - Draft Revised Partial D&M Plan Staff Report
- PETITION NO. 1458 (Homestead Fuel Cell/Hartford) - Draft Staff Report
- PETITION NO.1470 (Verizon/Fairfield) - Draft Staff Report
- Tower Share Memorandum (Consent Calendar)
Tuesday, December 21, 2021
DOCKET NO. 506 - New Cingular Wireless PCS, LLC (AT&T) application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a wireless telecommunications facility located at 499 Mile Lane, Middletown, Connecticut.
2PM - Evidentiary Hearing Session Continuation via Zoom Conferencing
Friday, December 24, 2021
Office Closed - Christmas Day
Thursday, December 30, 2021
1PM - Energy/telecommunications Meeting - CANCELED
Friday, December 31, 2021
Office Closed - New Year's Day Observance