Proposed Individual Permits
When available, supporting documents (draft permits, etc.) are formatted as Adobe PDF files and can be read online or downloaded for printing.
If there are no public notices currently available in a proposed action category (SIP Revisions, General Permits, Individual Permits, Miscellaneous, Adjacent States) that category will not display.
Note: Notices of Proposed Regulations can be viewed on the Connecticut eRegulations website.
Page 4 of 6
-
Notice of tentative determination to approve an application submitted by Dyno Noble, Inc for a RCRA Part B permit renewal. Written comments due September 2, 2024.
Date Posted: 7/19/2024
-
Notice of tentative determination for combined Waste and Air applications submitted by ReWorld Bristol, Inc. for a modification and renewal of permit to operate and establishment of a Biomedical Waste Treatment Facility and minor modifications to New Source Review permits for MWC Unit #1 and Unit #2. Written comments are due on August 4, 2024.
Date Posted: 7/5/2024
-
University of Connecticut, Storrs
Notice of tentative determination to approve an application submitted by the University of Connecticut for a renewal of a Title V permit. Written comments are due by July 27, 2024.
Date Posted: 6/27/2024
-
Connecticut Light and Power d/b/a Eversource Energy, Norwalk
Notice of public hearing for an application submitted by Connecticut Light and Power Company d/b/a Eversource Energy. A virtual public hearing will be held on May 29, 2024 at 6:30 PM via Zoom. Written comments are due by June 5, 2024.
Date Posted: 4/26/2024
-
Notice of tentative determination to approve an application submitted by CEG RIverside, LLC for proposed activity that includes retention of existing structures below the CJL and construction of a private residential dock. This activity will affect coastal resources. Written comments due by December 28, 2023.
Date Posted: 11/28/2023
-
The Commissioner of Energy and Environmental Protection (“DEEP”) hereby gives notice that a tentative determination has been reached to approve the following application submitted under Section 22a-208a of the Connecticut General Statutes.
Date Posted: 8/8/2023
-
Mariners Landing, LLC, Branford
Notice of tentative determination to approve an application submitted by Mariners Landing, LLC for proposed activity that includes the creation of a 50% public, 50% private marina with public transient slips and a kayak launch system. This activity will affect coastal resources. Written comments due by September 6, 2023.
Date Posted: 8/7/2023
-
Notice of tentative determination to approve an application submitted by 97 Pratt Road, LLC for proposed activity that includes the installation of a dock. This activity will affect tidal wetlands. Written comments due by September 16, 2023.
Date Posted: 8/7/2023