Proposed Individual Permits

The public notices in this section are provided as a convenience to the public. The official legal notice has been published in accordance with the requirements of all applicable laws.

When available, supporting documents (draft permits, etc.) are formatted as Adobe PDF files and can be read online or downloaded for printing.

If there are no public notices currently available in a proposed action category (SIP Revisions, General Permits, Individual Permits, Miscellaneous, Adjacent States) that category will not display.

Note: Notices of Proposed Regulations can be viewed on the Connecticut eRegulations website.

Page 16 of 16

  • The Connecticut Light and Power Company, d/b/a Eversource Energy, Norwalk

    Notice of tentative determination to approve an application submitted by The Connecticut Light and Power Company d/b/a Eversource Energy for proposed activity that includes relocation of twin 115kV transmission lines from monopoles and catenaries on the Norwalk Walk Bridge into two parallel conduits beneath the Norwalk River to be constructed using horizontal directional drilling. This activity may affect coastal and aquatic resources and tidal wetlands. Written comments due by April 15, 2024.

    Date Posted: 3/6/2024

  • Iain Gillespie, Stratford

    Notice of tentative determination to approve an application submitted by Iain Gillespie for proposed activity that includes constructing a residential dock consisting of a 4’ x 348’-8” pier supported by (48) 8” piles and (12) 12” piles, a 3’ x 38’ gangway, a 6’ x 21’ float, a 5’ x 6’ landing float, and (4) 12” float restraint piles. This activity will affect coastal resources and tidal wetlands. Written comments due by July 13, 2023.

    Date Posted: 6/13/2023

  • UniMetal Surface Furnishing LLC Naugatuck

    Department of Energy and Environmental Protection (DEEP) hereby gives notice that a tentative determination has been reached to issue a Stewardship Permit to UniMetal Surface Finishing, LLC. Virtual Meeting on July 20, 2022 Written comments due by September 1, 2022

    Date Posted: 7/12/2022

  • University of Connecticut, Storrs

    Notice of tentative determination to approve an application submitted by the University of Connecticut, Storrs Campus for three boilers. Written comments are due by October 31, 2020.

    Date Posted: 10/1/2020