Proposed Individual Permits

The public notices in this section are provided as a convenience to the public. The official legal notice has been published in accordance with the requirements of all applicable laws.

When available, supporting documents (draft permits, etc.) are formatted as Adobe PDF files and can be read online or downloaded for printing.

If there are no public notices currently available in a proposed action category (SIP Revisions, General Permits, Individual Permits, Miscellaneous, Adjacent States) that category will not display.

Note: Notices of Proposed Regulations can be viewed on the Connecticut eRegulations website.

Page 12 of 12

  • Gino C. Bottino, Norwalk

    Notice of tentative determination to approve an application submitted by Gino C. Bottino for proposed activity that includes removal of existing structures and installation of a dock. This activity will affect coastal resources, aquatic resources, and tidal wetlands. Written comments due by December 9, 2024.

    Date Posted: 10/29/2024

  • Flanders Run Association Inc., East Lyme

    Notice of tentative determination to approve an application for a permit renewal submitted by Flanders Run Association, Inc. to discharge a maximum of 10,800 gallons per day of treated domestic sewage to the ground water in the Pattagansett River Watershed from a condominium complex. Written comments due by September 2, 2024.

    Date Posted: 8/2/2024

  • Reworld Bristol, Inc.

    Notice of tentative determination for combined Waste and Air applications submitted by ReWorld Bristol, Inc. for a modification and renewal of permit to operate and establishment of a Biomedical Waste Treatment Facility and minor modifications to New Source Review permits for MWC Unit #1 and Unit #2. Written comments are due on August 4, 2024.

    Date Posted: 7/5/2024

  • Connecticut Light and Power d/b/a Eversource Energy, Norwalk

    Notice of public hearing for an application submitted by Connecticut Light and Power Company d/b/a Eversource Energy. A virtual public hearing will be held on May 29, 2024 at 6:30 PM via Zoom. Written comments are due by June 5, 2024.

    Date Posted: 4/26/2024

  • The Connecticut Light and Power Company, d/b/a Eversource Energy, Norwalk

    Notice of tentative determination to approve an application submitted by The Connecticut Light and Power Company d/b/a Eversource Energy for proposed activity that includes relocation of twin 115kV transmission lines from monopoles and catenaries on the Norwalk Walk Bridge into two parallel conduits beneath the Norwalk River to be constructed using horizontal directional drilling. This activity may affect coastal and aquatic resources and tidal wetlands. Written comments due by April 15, 2024.

    Date Posted: 3/6/2024

  • Iain Gillespie, Stratford

    Notice of tentative determination to approve an application submitted by Iain Gillespie for proposed activity that includes constructing a residential dock consisting of a 4’ x 348’-8” pier supported by (48) 8” piles and (12) 12” piles, a 3’ x 38’ gangway, a 6’ x 21’ float, a 5’ x 6’ landing float, and (4) 12” float restraint piles. This activity will affect coastal resources and tidal wetlands. Written comments due by July 13, 2023.

    Date Posted: 6/13/2023

  • UniMetal Surface Furnishing LLC Naugatuck

    Department of Energy and Environmental Protection (DEEP) hereby gives notice that a tentative determination has been reached to issue a Stewardship Permit to UniMetal Surface Finishing, LLC. Virtual Meeting on July 20, 2022 Written comments due by September 1, 2022

    Date Posted: 7/12/2022

  • University of Connecticut, Storrs

    Notice of tentative determination to approve an application submitted by the University of Connecticut, Storrs Campus for three boilers. Written comments are due by October 31, 2020.