Proposed Individual Permits - 2025
Page 3 of 9
-
Notice of tentative determination to approve an application submitted by Craig J. Morel for proposed activity that includes a dock extension with new boat lift. This activity will affect coastal resources. Written comments due by September 7, 2025.
-
Leed-Himmel Industries Inc., Hamden
Notice of tentative determination to approve an application for a permit renewal submitted by Leed-Himmel Industries Inc. to discharge a maximum of 60,000 gallons per day of treated metal finishing wastewater and boiler blowdown to the Greater New Haven Water Pollution Control Authority from metal finishing operations the manufacture of architectural aluminum products. Written comments due by June 14, 2025.
-
Notice of tentative determination to approve an application submitted by Barry Richter for proposed activity that includes retention of a stone walkway and installation of a dock. This activity will affect aquatic resources. Written comments due by August 24, 2025.
-
Notice of tentative determination to approve an application submitted by Stacy Bland for proposed activity that includes construction of a dock. This activity will affect coastal resources. Written comments due by September 7, 2025.
-
Notice of tentative determination to approve an application submitted by David Geenberg for proposed activity that includes installing access stairs. This activity will affect coastal resources. Written comments due by February 6, 2025.
-
Tilcon Connecticut, Inc., Waterbury
Notice of tentative determination to approve an application submitted by Tilcon Connecticut, Inc. in Waterbury for a New Source Review permit for a Truck-Mix Concrete Batch Plant . Written comments are due by November 6, 2025.
-
Notice of tentative determination to approve an application submitted by 362 Post Road, LLC for proposed activity that includes installation of river and jet ski slips, tidal wetland restoration, and boat ramp creation. This activity will affect tidal wetlands. Written comments due by May 9, 2025.
-
Notice of tentative determination to approve an application submitted by Steve Wheeler for proposed activity that includes installation of a dock comprised of a fixed pier, float and ramp. This activity will affect coastal resources. Written comments due by May 11, 2025.
-
Seaview Bridgeport, LLC, Bridgeport
Notice of tentative determination to approve an application submitted by Seaview Bridgeport, LLC for proposed activity that includes placing shoreline riprap. This activity will affect coastal resources. Written comments due by September 19, 2025.
-
Pequot Holdings Two, LLC, Stonington
Notice of tentative determination to approve an application submitted by Pequot Holdings Two, LLC, for a Diversion of Water permit. Intent to waive public hearing. Written comment due by February 14, 2025.
-
Notice of tentative determination to approve an application submitted by Scott Marino for proposed activity that includes constructing a dock. This activity will affect coastal resources and tidal wetlands. Written comments due by September 17, 2025.
-
2 Lighthouse Lane, LLC, Old Greenwich
Notice of tentative determination to approve an application submitted by 2 Lighthouse Lane, LLC for proposed activity that includes constructing a fixed pier with a ramp and float. This activity will affect coastal resources and tidal wetlands. Written comments due by May 9, 2025.
-
S & S Marine, LLC, Old Saybrook
Notice of tentative determination to approve an application submitted by S & S Marine, LLC for proposed activity that includes marina docks expansion. This activity will affect coastal resources. Written comments due by May 11, 2025.
-
Notice of tentative determination to approve an application submitted by Robert Valenti for proposed activity that includes the construction of a fixed post-supported walkway. This activity will affect coastal resources and tidal wetlands. Written comments due by September 17, 2025.
-
FirstLight CT Housatonic LLC, New Milford- 10/8/25
Notice of tentative determination to approve an application for a permit submitted by FirstLight CT Housatonic LLC who presently discharges up to 1,440,000 gallons per day of turbine leakage, cooling water, groundwater, and miscellaneous non-process waters via DSN 001 from hydroelectric generation operations at a hydroelectric facility. DSN 002 covers the discharge of up to 1,656,000 gallons per day of flood water in case of a facility flood. Written comments due by November 7, 2025.