Due to the personally identifying information contained in written limited appearance statements from the public, any written limited appearance statements that are received by the Council for any matter are available to be viewed at the Council’s office Monday through Friday from 8:30 a.m. to 4:30 p.m. or available to be sent via e-mail upon request. Please allow adequate time for processing.

Long Island Sound Resource and Use Inventory/Long Island Sound Blue Plan Survey

Town of Haddam


DOCKET NO. 9 CL&P application for a Certificate of Environmental Compatibility and Public Need with respect to a new 345 kV overhead electric transmission line between Oxbow Junction, in Haddam, and Black Pond Junction, in Meriden, and the related reconstruction of an existing overhead 115kV electric transmission line between Beseck Junction , in Wallingford, and East Meriden Substation, in Meriden.  (Findings of Fact)

DOCKET NO. 28  Storer Communication of Clinton, Inc. Certificate for the construction of a community antenna television tower near Foot Hills Road in Haddam. (Findings of Fact) (Opinion) and (Decision and Order)

DOCKET NO. 58 Metro Mobile CTS of Hartford, Inc. Certificate for the construction, maintenance, and operation of facilities to provide cellular telephone service in Glastonbury, Bloomfield, on Turkey Hill Road in Haddam, Middlefield, Portland, Rocky Hill, Somers, Willington, Vernon, Windsor, and Hartford. (Findings of Fact) (Opinion) and (Decision and Order)

DOCKET NO. 84 SNET Cellular, Inc. Certificate for the construction of a cellular telephone antenna tower and associated equipment on Morris Hubbard Road in Haddam. (Findings of Fact) (Opinion) and (Decision and Order)

DOCKET NO. 170  Bell Atlantic NYNEX Mobile Certificate of Environmental Compatibility and Public Need for a cellular telecommunications facility located at 109 Maple Avenue West in the Higganum section of the Town of Haddam.  (Findings of Fact) (Opinion) and (Decision and Order)

DOCKET NO. 272  The Connecticut Light and Power Company and The United Illuminating Company Certificate of Environmental Compatibility and Public Need for the construction of a new 345-kV electric transmission line and associated facilities between the Scovill Rock Switching Station in Middletown and the Norwalk Substation in Norwalk, Connecticut. This includes construction of the Beseck Switching Station in Wallingford, East Devon Substation in Milford, and Singer Substation in Bridgeport and modifications to the Scovill Rock Switching Station and the Norwalk Substation and certain interconnections. (Haddam) (Findings of Fact) (Appendix A) (Appendix B) (Appendix C) (Opinion) (Decision and Order) (Record)

DOCKET NO. 348  Sprint Nextel Corporation and The Connecticut Light and Power Company’s application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance and management of a telecommunications facility located off of Cove Road, Haddam, Connecticut. (Record) (Withdrawal LetterWithdrawn

DOCKET NO. 520 Homeland Towers, LLC and Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at 124 Ague Spring Road, HaddamConnecticut.  (Findings of Fact)  (Opinion)  (Decision and Order)

DOCKET NO. 529 – Homeland Towers, LLC and Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at Parcel No. 65-002-1, Old Chester Road North, Haddam, Connecticut. (Findings of Fact)  (Opinion)  (Decision and Order)

PETITION NO. 5 The Connecticut Yankee Atomic Power Company petition for changes to various systems involved in the collection and treatment of radioactive wastes at the Connecticut Yankee Nuclear Power Station in Haddam. Staff Report Approved 10/13/72

PETITION NO. 35 Northeast Utilities Service Company petition for construction of a 120-foot by 120-foot warehouse building with attached 60-foot long by 30-foot wide exterior platform, a new 54-foot by 42-foot guard house, and a fish diversion and trench deflection structure at an existing circulating water intake in the Connecticut River, at Connecticut Yankee Nuclear Power Station in Haddam. Staff Report Approved 09/03/76

PETITION NO. 48 The Connecticut Light and Power Company petition for installation of wood structures and associated guys along its 115-kV transmission line from East Meriden Substation to Haddam Substation in Haddam and Middletown. Staff Report Approved 11/30/79

PETITION NO. 56 Northeast Utilities Service Company petition for the construction of a low-level, radioactive waste storage facility at Connecticut Yankee Nuclear Power Station in Haddam. Staff Report Approved 11/06/80

PETITION NO.  57  Northeast Utilities Service Company petition for the construction of a 1.1 acre parking area addition to an existing parking lot at the Connecticut Yankee Nuclear Power Station, in Haddam.  Staff Report Approved 04/18/80

PETITION NO.  58 Northeast Utilities Service Company petition for the construction of a one-story, concrete Emergency Operations Center building at the Connecticut Yankee Nuclear Power Station, in Haddam.  Staff Report Approved 06/19/80

PETITION NO. 66 Connecticut Department of Transportation petition for the installation of telecommunications antennas on an existing telecommunications tower owned by Northeast Utilities located on Goose Hill off Porkorny Road in Haddam. Staff Report Approved 03/11/81

PETITION NO. 100  Northeast Utilities petition for the addition of a microwave transmitter/receiver at its existing telecommunication facility located off Porkorny Road in Haddam. Withdrawn 2/6/84

PETITION NO. 102 The Connecticut Light and Power Company petition for the addition of a microwave transmitter/receiver dish and associated equipment at its existing telecommunications facility off Porkorny Road in HaddamStaff Report Approved 02/24/84

PETITION NO. 116  Northeast Utilities Service Company petition for a low-level radioactive waste reduction building at Connecticut Yankee and Millstone Nuclear Power Stations in Haddam and Waterford. Staff Report Approved 10/09/84

PETITION NO. 155 The Connecticut Yankee Atomic Power Company petition for the proposed addition to the administration building at Connecticut Yankee Nuclear Power Station in Haddam. Approved 03/12/86

PETITION NO. 168 Northeast Utilities Service Company petition to construct a new switchgear building at the Connecticut Yankee Nuclear Power Station in Haddam. Staff Report Approved 12/22/86

PETITION NO. 169 Northeast Utilities petition for proposed outage support facilities at Connecticut Yankee Nuclear Power Station in Haddam. Staff Report Approved 12/22/86

PETITION NO. 220 The Connecticut Yankee Atomic Power Company petition for proposed plant support buildings at Connecticut Yankee Nuclear Power Station in Haddam. Staff Report Approved 11/21/88

PETITION NO. 254 Connecticut Yankee Atomic Power Company petition for the proposed reconstruction of a boat dock at Connecticut Yankee Nuclear Power Station in Haddam. Staff Report Approved 07/25/90

PETITION NO. 289 The Connecticut Yankee Atomic Power Company petition for the proposed construction of a warehouse within the developed area of the Connecticut Yankee Nuclear Power Station in Haddam. Staff Report Approved 09/09/92

PETITION NO. 336 Northeast Utilities Service Company petition for proposed modifications to the Black Pond Junction to Connecticut Yankee 345-kV line in Haddam. Staff Report Approved 12/05/94

PETITION NO. 434  Crown Atlantic Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for modifications to and placement of telecommunications antennas on an existing telecommunications facility located on Turkey Hill Road in Haddam. Staff Report Approved 10/21/99

PETITION NO. 646  The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a 115-kV capacitor bank and associated equipment at Haddam Substation at Route 154, Haddam, Connecticut. Staff Report Approved 12/09/03

PETITION NO. 669  Connecticut Light & Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modifications to its existing 115/23-kilovolt Haddam 11C Substation located in Haddam, Connecticut. Staff Report Approved 06/09/04

PETITION NO. 670  Connecticut Light & Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the is required for the modifications and reconfigurations to its existing transmission lines located in Haddam, Connecticut. Staff Report Approved 07/13/04

PETITION NO. 671  Connecticut Light & Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a 95 kW emergency generator and associated equipment at Haddam Neck 14B Substation in Haddam, Connecticut. Staff Report Approved 05/19/04

PETITION NO. 890 The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed removal of a single-circuit 345-kV transmission line segment between Chestnut Junction in Middletown, Connecticut and Oxbow Junction in Haddam, Connecticut. Staff Report Approved 04/07/09

PETITION NO. 1027 The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed replacement of an existing tower located at 330 Porkony Road, Haddam, Connecticut. Staff Report Approved 05/10/12

PETITION NO. 1080  The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing CL&P switching station located at 181 Cove Road, Haddam, Connecticut.  Staff Report Approved 01/23/14

SUB-PETITION NO. 1133-VER-20160912  Cellco Partnership d/b/a Verizon Wireless sub-petition for a declaratory ruling for approval of an eligible facility request for modifications to an existing telecommunications facility located at 330 Pokorny Road, Haddam, Connecticut. Decision Extension Request and Council Decision Structural Analysis Report Notice of Construction Completion and Condition No. 1 Compliance

SUBPETITION NO. 1133-CROWN-20230127  Crown Castle eligible facility request for modifications to an existing telecommunications facility located at 539 Plains Road, Haddam, Connecticut.  Decision

PETITION NO. 1154 Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the existing Haddam Substation and associated 345-kV and 115-kV transmission lines located at 1384 Saybrook Road, Haddam, Connecticut. Request for Status Status Approval Decision and Staff Report Landscaping Plan and Retaining Wall Details Approved 06/11/15 Request for Amendment to Petition 11/04/15 Revision Decision Semi-Annual Status of Construction Report, 12/23/16
 
PETITION NO. 1186  Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed partial decommissioning of 0.5 miles of existing 115-kV transmission line and modifications to its existing 115-kV transmission line and related substation improvements located at 181 Cove Road, Haddam, Connecticut. Date for Decision Revised Drawings Decision and Staff Report Notice of Construction Completion Approved 11/12/15
 
PETITION NO. 1256 Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed replacement of approximately 8 miles of its existing No. 1620/1975 115-kilovolt electric transmission line structures with new transmission line structures within existing right of way between Haddam Substation and Oxbow Junction in Haddam, Connecticut, and related transmission line structure improvements. Notice of Construction Completion Approved 12/08/16  
 
SUB-PETITION NO. 1293-HCDREOS-01 (Haddam, Chester, Deep River, Essex and Old Saybrook)  Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Decision Extension Request and Council Decision Amendment and Council Decision Second Extension Request and Council Decision Third Extension Request and Council Decision Notice of Construction Completion
 
SUB-PETITION NO. 1293-HCDREOS-02 (Haddam, Chester, Deep River, Essex and Old Saybrook) – Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Decision Amendment Council Decision on Amendment Extension Request and Council Decision Notice of Construction Completion
 
SUB-PETITION NO. 1293-MHEH-01 (Middletown-Haddam-East Haddam)  Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Decision Notice of Construction Completion
 
SUB-PETITION NO. 1293-HM-01 (Haddam-Middletown) – Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Decision  Notice of Construction Completion
 
SUB-PETITION NO. 1293-HA-01 (Haddam) – Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements.  Decision Notice of Construction Completion
 
SUB-PETITION NO. 1293-HEHLELMW-01 (Haddam, East Haddam, Lyme, East Lyme, Montville and Waterford) – Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Decision Extension Second Extension Request and Council Decision Third Extension Request and Council Decision Third Extension Request and Council Decision Amendment Request Amendment Decision  Notice of Construction Completion
 
SUB-PETITION NO. 1293-MEHHEH-01 (Middletown, East Hampton, Haddam, East Haddam) – Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Decision Extension Request and Council Decision  Notice of Construction Completion
 
SUB-PETITION NO. 1293-HA-02 (Haddam) – Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements.  Decision  Notice of Construction Completion
 
SUB-PETITION NO. 1293-HA-03 (Haddam) – Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Decision  Notice of Construction Completion
 
PETITION NO. 1565The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed East of Hurd State Park to East Haddam Junction Line Rebuild Project consisting of the replacement of electric transmission line structures along its existing 6.2-mile electric transmission line right-of-way shared by its existing 115-kilovolt (kV) No. 1772 and 345-kV Nos. 362, 376 and 364 Lines between Structure Nos. 12053 and 19099 east of Hurd State Park in East Hampton, Haddam Neck Switching Station in Haddam, and East Haddam Junction in East Haddam, Connecticut traversing the municipalities of East Hampton, Haddam and East Haddam, and related electric transmission line and substation improvements.  Approved 07/20/23  
 
PETITION NO. 1576 The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed Middletown Substation to Oxbow Junction Upgrade Project consisting of the replacement of electric transmission line structures along approximately 5.5 miles of its existing No. 1620 115-kilovolt (kV) electric transmission line right of way between Middletown Substation in Middletown and Oxbow Junction in Haddam, Connecticut, and related electric transmission line and substation improvements.  Approved 08/31/23  
 
BANM notice of intent to modify existing telecommunications facilities located off South St., Vernon; off Birch Mountain Rd., Glastonbury; and off Turkey Hill Rd. and Plains Rd., Haddam, Connecticut. November 22, 1995 Antenna Upgrade Filing
 
BANM notice of intent to modify an existing telecommunications facility located off Turkey Hill Road and Plains Road in Haddam, Connecticut.  
 
BANM notice of intent to modify an existing telecommunications facility located at 109 Maple Avenue West in the Higganum section of Haddam, Connecticut. See Docket No. 170.  
 
Dept. of Public Safety, Div. of State Police notice of intent to modify an existing telecommunications facility located on Goose Hill, Haddam, Connecticut.  
 
Metro Mobile CTS of Hartford, Inc. notice of intent to modify an existing telecommunications tower and associated equipment located on Plains Road, Haddam, Connecticut.   
 
Nextel Communications notice of intent to modify an existing telecommunications facility located at 373 Chamberlin Hill Road in Haddam, Connecticut.  Decision
 
SNET Cellular, Inc.  Notice Pursuant to Regulations of State Agencies 16-50j-73 of Intent to Modify Exempt Towers and Associated Equipment operated by SNET Cellular, Inc., located on Aspetuck Ave., New Milford; off Fairfield Dr., Newtown; 405 Brushy Plain Rd., Branford; 4 Hoffmann Rd., Canton; Town Farm Rd., Enfield; Birch Mountain Rd., Glastonbury; Tanner Marsh Rd., Guilford; 139 Morris Hubbard Rd., Haddam; Mountain St., Hartford; Kikapoo Rd., Middlefield; 438 Bridgeport Ave., Milford; 170 Ingham Hill Rd., Old Saybrook; 391 Niederwerfer Rd., S. Windsor; 555 Main St., Stamford; Farmdale Dr., Waterbury; Miner La., Waterford; 180A Bayberry La., Westport, Connecticut.   
 
Springwich Cellular Ltd. Partnership notice of intent to modify existing telecommunications facilities located off Hoffmann Road in Canton, 405 Brushy Plain Rd., Branford; Town Farm Rd., Enfield; Birch Mountain Rd., Glastonbury; Tanner Marsh Rd., Guilford; 139 Morris Hubbard Rd., Haddam; Mountain St., Hartford; Kikapoo Rd., Middlefield; 438 Bridgeport Ave., Milford; Fairfield Dr., Newtown; 170 Ingham Hill, Old Saybrook; 391 Niederwerf Rd., S. Windsor; 555 Main St., Stamford; Farmdale Dr, Waterbury; Miner La., Waterford; 180A Bayberry La., Westport, Connecticut.  Decision
 
EM-SPRINT-061-980715  Sprint PCS notice of intent to modify an existing telecommunications facility located at 139 Morris Hubbard Road in Haddam, Connecticut.  Decision
 
EM-CROWN-061-990917  Crown Atlantic Company LLC notice of intent to modify an existing telecommunications facility located on Turkey Hill Road in Haddam, Connecticut.  Decision
 
EM-CROWN-061-990927  Crown Atlantic Company LLC notice of intent to modify an existing telecommunications facility located on Turkey Hill Road in Haddam, Connecticut.   
 
EM-CROWN-061-000228  Crown Atlantic Company LLC notice of intent to modify an existing telecommunications facility located on Turkey Hill Road in Haddam, Connecticut.  
 
EM-CROWN-057-000228  Crown Atlantic Company LLC notice of intent to modify an existing telecommunications facility located at 109 Maple Avenue (Higganum) in Haddam, Connecticut.  
 
EM-SPRINT-061-000718  Sprint PCS notice of intent to modify an existing telecommunications facility located at 330 Pokorney Road, Haddam, Connecticut.  
 
TS-VOICESTREAM-061-010803  VoiceStream Wireless Corporation request for an order to approve tower sharing at an existing telecommunications facility located at Porkorny Road (Goose Hill), Haddam, Connecticut.  Town Letter  Decision
 
EM-MARCUS-061-020222  Marcus Communications, LLC notice of intent to modify an existing telecommunications facility located at 373 Chamberlain Hill Road, Haddam, Connecticut.   
 
EM-AT&T-061-020315  AT&T Wireless notice of intent to modify an existing telecommunications facility located at Turkey Hill Road, Haddam, Connecticut.  
 
EM-AT&T-061-020327  AT&T Wireless PCS, LLC d/b/a AT&T Wireless notice of intent to modify an existing telecommunications facility located at 270 Hubbard Road, Haddam, Connecticut.   
 
EM-AT&T-061-020501  AT&T Wireless notice of intent to modify an existing telecommunications facility located at 109 Maple Avenue West, Haddam, Connecticut.  Decision
 
EM-CING-059-061-071-086-105-113-152-020731  SNET Mobility, LLC notice of intent to modify existing telecommunications facilities located in Groton, Haddam, Lebanon, Montville, Old Lyme, Portland, Waterford, Connecticut.  
 
EM-T-MOBILE-"UNIVERSAL"-020830 Omnipoint Facilities Network 2., L.L.C. and Omnipoint Communications, Inc., subsidiaries of T-Mobile USA, Inc. notice of intent to modify existing telecommunications facilities throughout Connecticut.  
 
EM-NEXTEL-061-040908  Nextel Communications Inc. notice of intent to modify an existing telecommunications facility located at 139 Morris Hubbard Road, Haddam, Connecticut.  Decision
 
EM-VER-061-050210 Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at Maple Avenue, Haddam, Connecticut.  Decision
 
EM-VER-061-099-080-119-050525 Cellco Partnership d/b/a Verizon Wireless notice of intent to modify existing telecommunications facilities located at Plains Road, Haddam; 83 Reeds Gap Road, North Branford; 921-927 East Main Street, Meriden; and France Street, Rocky Hill, Connecticut.  Decision
 
TS-CING-061-060314  New Cingular Wireless PCS, LLC request for an order to approve tower sharing at an existing telecommunications facility located at 285 Chamberlain Hill Road, Haddam, Connecticut.  Town Letter  Decision
 
EM-USCG-008-01-135-060712  Simons Land Consulting, LLC on behalf of the United States Coast Guard notice of intent to modify existing telecommunications facilities located at 9 Meyers Road, Bethany; 373 Chamberlain Hill Road, Higganum; and 168 Catoona Lane, Stamford, Connecticut.   
 
EM-HADDAM-061-061222  Town of Haddam notice of intent to modify an existing telecommunications facility located at Maple Avenue West, Haddam, Connecticut.  Decision
 
EM-CING-054-057-061-160-161-070815  New Cingular Wireless PCS, LLC notice of intent to modify existing telecommunications facilities located at 366 Three Mile Road, Glastonbury; Butternut Hollow Road, Greenwich; 599 Plains Road, Haddam; 111 Trask Road/426 River Road, Willington; and 128 Mather Street, Wilton, Connecticut.  Decision
 
EM-MEDIAFLO-061-080219 MediaFlo USA, Inc. notice of intent to modify an existing telecommunication facility located at 373 Chamberlain Hill Road, Haddam, Connecticut.  
 
EM-VER-061-080325 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunication facility located at Maple Avenue West, Haddam, Connecticut.  Decision
 
EM-VER-061-080410 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunication facility located at Plains Road, Haddam, Connecticut.  Decision  Notice of Construction Completion
 
EM-POCKET-061-080917 – Youghiogheny Communications-Northeast, LLC d/b/a Pocket Communications notice of intent to modify an existing telecommunications facility located at 65 Maple Avenue West, Haddam, Connecticut.  Decision
 
EM-POCKET-061-080918 – Youghiogheny Communications-Northeast, LLC d/b/a Pocket Communications notice of intent to modify an existing telecommunications facility located at 525 Plains Road (aka 535 Plains Road), Haddam, Connecticut.  Decision  Notice of Construction Completion
 
EM-POCKET-061-080922 – Youghiogheny Communications-Northeast, LLC d/b/a Pocket Communications notice of intent to modify an existing telecommunications facility located at 270 Hubbard Road, Haddam, Connecticut.  Decision  Notice of Construction Completion
 
EM-POCKET-061-081112 – Youghiogheny Communications-Northeast, LLC d/b/a Pocket Communications notice of intent to modify an existing telecommunications facility located at 139 Morris Hubbard Road, Higganum (Haddam), Connecticut.  Decision  Exempt Mod re Temporary Generators  Decision re Temporary Generators  Notice of Construction Completion
 
EM-CING-061-081208 New Cingular Wireless PCS, LLC notice of intent to modify an existing telecommunications facility located at Plains Road/Turkey Hill Road, Haddam, Connecticut.  Decision
 
EM-CING-061-081210  New Cingular Wireless PCS, LLC notice of intent to modify an existing telecommunications facility located at 139 Morris Hubbard Road, Haddam, Connecticut.  Decision
 
EM-CING-061-090109  New Cingular Wireless PCS, LLC notice of intent to modify an existing telecommunications facility located at 109 Maple Avenue West, Haddam, Connecticut.  Decision
 
EM-VER-061-111107  Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 539 Plains Road, Haddam, Connecticut.  Decision  Notice of Construction Completion
 
EM-VER-061-111108  Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 109 Maple Avenue West, Haddam, Connecticut.  Decision
 
EM-CING-061-120615 New Cingular Wireless PCS, LLC notice of intent to modify an existing telecommunications facility located at 285 Chamberlain Hill Road, Haddam, Connecticut.  Decision
 
TS-ENERTRAC-061-120717 Enertrac, Inc. request for an order to approve tower sharing at an existing telecommunications facility located at 373 Chamberlain Hill Road, Higganum (Haddam), Connecticut.   
 
EM-SPRINT-061-120924 – Sprint Spectrum L.P. notice of intent to modify an existing telecommunications facility located at 539 Plains Road, Haddam, Connecticut.  Decision
 
EM-AT&T-061-120926 – AT&T Mobility notice of intent to modify an existing telecommunications facility located at 139 Morris Hubbard Road, Haddam, Connecticut.  Decision
 
EM-CING-061-121031A New Cingular Wireless PCS, LLC notice of intent to modify an existing telecommunications facility located at 525 Plains Road (Turkey Hill Road), Haddam, Connecticut.  Decision
 
EM-CING-061-121031B New Cingular Wireless PCS, LLC notice of intent to modify an existing telecommunications facility located at 109 Maple Avenue West, Haddam (Higganum), Connecticut.  Decision
 
EM-SPRINT-061-121210 Sprint Spectrum L.P. notice of intent to modify an existing telecommunications facility located at 285 Chamberlin Hill Road, Higganum (Haddam), Connecticut.  Decision
 
EM-ATC-061-130419 American Tower Corporation (“ATC”) notice of intent to modify an existing telecommunications facility located at 139 Morris Hubbard Road, Higganum (Haddam), Connecticut.  
 
EM-AT&T-061-131209  American Telephone and Telegraph Company (AT&T) notice of intent to modify an existing telecommunications facility located at 285 Chamberlain Hill Road, Haddam, Connecticut.  Decision  Revised Site Plans  Second Decision  Extension Request and Council Decision  Second Extension Request and Council Decision  
 
EM-AT&T-061-140131 American Telephone & Telegraph (AT&T) notice of intent to modify an existing telecommunications facility located at 525 Plains Road, Haddam, Connecticut. Decision Extension Request and Council Decision Second Extension Request and Council Decision Third Extension Request and Council Decision
 
EM-SPRINT-061-140530 Sprint Spectrum notice of intent to modify an existing telecommunications facility located at 285 Chamberlain Hill Road, Higganum (Haddam), Connecticut. Decision Not Completed
 
EM-VER-061-140708 Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 539 Plains Road, Haddam, Connecticut. Decision Notice of Construction Completion
 
EM-T-MOBILE-061-140807 – T-Mobile Northeast LLC notice of intent to modify an existing telecommunications facility located at 270 Hubbard Road, Haddam, Connecticut.  Decision Extension Request and Council Decision  Notice of Construction Completion
 
EM-METROPCS-061-140910  MetroPCS Massachusetts, LLC notice of intent to modify an existing telecommunications facility located at 139 Morris Hubbard Road, Higganum (Haddam), Connecticut. Decision Notice of Construction Completion
 
EM-T-MOBILE-061-150320 – T-Mobile notice of intent to modify an existing telecommunications facility located at 270 Hubbard Road, Higganum, Connecticut.  Decision Notice of Construction Completion
 
EM-T-MOBILE-061-150331  T-Mobile notice of intent to modify an existing telecommunications facility located at 65 Maple Avenue West, Haddam, Connecticut. Decision Notice of Construction Completion
 
EM-EVER-061-150514  Eversource Energy notice of intent to modify an existing telecommunications facility located at 330 Pokorny Road, Haddam, Connecticut. Decision Notice of Construction Completion
 
TS-EVER-061-150806 Eversource Energy request for an order to approve tower sharing at an existing telecommunications facility located 373 Chamberlain Hill Road, Haddam, Connecticut. Decision
 
EM-VER-061-151021 Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 539 Plains Road, Haddam, Connecticut. Decision Extension Request and Council Decision Second extension Request and Council Decision Third Extension Request and Council Decision Fourth Extension Request and Council Decision Notice of Construction Completion
 
EM-EVER-061-160726 Eversource Energy notice of intent to modify an existing telecommunications facility located at 330 Pokorny Road, Haddam, Connecticut.  Decision Notice of Construction Completion
 
EM-AT&T-061-180124 – AT&T notice of intent to modify an existing telecommunications facility located at 131 Morris Hubbard Road, Haddam, Connecticut.  Decision Notice of Construction Completion
 
EM-SPRINT-061-180130  Sprint notice of intent to modify an existing telecommunications facility located at 139 Morris Hubbard Road, Higganum, Connecticut. Incomplete Decision
 
EM-SPRINT-061-180201 Sprint notice of intent to modify an existing telecommunications facility located at 285 Chamberlain Hill Road, Higganum (Haddam), Connecticut. Incomplete Letter Response to Incomplete Letter Structural Analysis Report Decision Notice of Construction Completion
 
EM-AT&T-061-180201 – AT&T notice of intent to modify an existing telecommunications facility located at 539 Plains Road, Haddam, Connecticut. Decision Notice of Construction Completion
 
EM-SPRINT-061-180615  Sprint Spectrum Realty Company, L.P. notice of intent to modify an existing telecommunications facility located at 139 Morris Hubbard Road, Higganum, Connecticut. Decision  Notice of Construction Completion
 
EM-SPRINT-061-181029  Sprint notice of intent to modify an existing telecommunications facility located at 539 Plains Road, Haddam, Connecticut. Decision Notice of Construction Completion
 
EM-AT&T-061-190516 – AT&T Mobility notice of intent to modify an existing telecommunications facility located at 65 (a/k/a 109) Maple Avenue West, Haddam, Connecticut. Decision  Notice of Construction Completion
 
TS-SIGFOX-061-190826  Sigfox NIP, LLC request for an order to approve tower sharing at an existing telecommunications facility located at 373 Chamberlain Hill Road, Haddam, Connecticut. Town Letter Decision - Denial
 
EM-SPRINT-061-191007 – Sprint notice of intent to modify an existing telecommunications facility located at 330 Pokorny Road, Haddam, Connecticut. Incomplete Letter Response to Incomplete and Council Acknowledgement  Decision  Notice of Construction Completion
 
TS-SIGFOX-061-191106 – Sigfox NIP, LLC request for an order to approve tower sharing at an existing telecommunications facility located at 373 Chamberlain Hill Road, Haddam, Connecticut. Town Letter Incomplete Letter Response to Incomplete and Council Acknowledgement Decision
 
EM-VER-061-200423 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 330 Pokorny Road, Haddam, Connecticut. Incomplete Letter Decision - Denial
 
EM-VER-061-200605  Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 330 Pokorny Road, Haddam, Connecticut. Decision  Notice of Construction Completion
 
EM-AT&T-061-200824  AT&T notice of intent to modify an existing telecommunications facility located at 539 Plains Road, Haddam, Connecticut. Decision  Notice of Construction Completion
 
EM-AT&T-061-200909  AT&T notice of intent to modify an existing telecommunications facility located at 65 Maple Avenue, Haddam, Connecticut. Incomplete Letter Response to Incomplete and Council Acknowledgement Decision  Notice of Construction Completion
 
EM-EVER-061-201002 – The Connecticut Light and Power Company d/b/a Eversource Energy notice of intent to modify an existing telecommunications facility located at 330 Pokorny Road, Haddam, Connecticut. Decision Notice of Construction Completion
 
EM-T-MOBILE-061-201022 – T-Mobile notice of intent to modify an existing telecommunications facility located at Hubbard Road (a/k/a 270 Hubbard Road), Haddam, Connecticut. Decision  Notice of Construction Completion
 
EM-T-MOBILE-061-210305 – T-Mobile notice of intent to modify an existing telecommunications facility located at 285 Chamberlain Hill Road, Haddam, Connecticut. Decision  Extension Request and Council Extension Approval  Notice of Construction Completion
 
EM-T-MOBILE-061-210319  T-Mobile notice of intent to modify an existing telecommunications facility located at 65 Maple Avenue West, Haddam, Connecticut. Decision  Notice of Construction Commencement  Notice of Construction Completion
 
TS-DISH-061-210621  DISH Wireless LLC request for an order to approve tower sharing at an existing telecommunications facility located at 65 Maple Avenue West, Haddam, Connecticut. Town Letter  Incomplete Notice Extension Request and Council Decision Response to Incomplete and Council Acknowledgement  Decision  Notice of Construction Completion
 
TS-DISH-061-210730 – DISH Wireless LLC request for an order to approve tower sharing at an existing telecommunications facility located at 270 Hubbard Road, Haddam, Connecticut. Town Letter    Decision  Notice of Construction Completion
 
TS-DISH-061-210920  Dish Wireless LLC request for an order to approve tower sharing at an existing telecommunications facility located at 539 Plains Road, Haddam, Connecticut. Town Letter Incomplete Letter Corrected Filing Resubmission Structural Analysis Second Incomplete Letter Response to Incomplete and Council Acknowledgement Decision Notice of Construction Completion
 
EM-VER-061-211029  Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 65 Maple Avenue West, Haddam, Connecticut.  Decision Notice of Cancellation
 
EM-T-MOBILE-061-211201  T-Mobile notice of intent to modify an existing telecommunications facility located at 539 Plains Road, Haddam, Connecticut.  Decision Notice of Cancellation
 
EM-T-MOBILE-061-211213  T-Mobile notice of intent to modify an existing telecommunications facility located at Hubbard Road (a/k/a 270 Hubbard Road), Haddam, Connecticut.  Decision Notice of Construction Completion
 
TS-DISH-061-211223  Dish Wireless LLC request for an order to approve tower sharing at an existing telecommunications facility located at 373 Chamberlain Hill Road, Haddam, Connecticut. Town Letter Decision Extension Request and Council Decision Additional Extension Request and Council Decision
 
EM-T-MOBILE-061-211229  T-Mobile notice of intent to modify an existing telecommunications facility located at 330 Pokorny Road, Haddam, Connecticut. Decision Notice of Construction Completion
 
EM-T-MOBILE-061-220419  T-Mobile notice of intent to modify an existing telecommunications facility located at 285 Chamberlain Hill Road, Haddam, Connecticut.  Decision Notice of Cancellation
 
EM-VER-061-220707 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 330 Pokorny Road, Haddam, Connecticut. Incomplete Letter Response to Incomplete and Council Acknowledgement Decision Notice of Cancellation
 
EM-T-MOBILE-061-220822T-Mobile notice of intent to modify an existing telecommunications facility located at 65 Maple Avenue West, Haddam, Connecticut. Decision Notice of Construction Completion
 
EM-AT&T-061-220902  AT&T notice of intent to modify an existing telecommunications facility located at 139 Morris Hubbard Road, Haddam, Connecticut. Decision  Notice of Construction Commencement Notice of Construction Completion
 
EM-T-MOBILE-061-220902 – T-Mobile notice of intent to modify an existing telecommunications facility located at 139 Morris Hubbard Road, Haddam, Connecticut.   DecisionExtension Request and Council Decision Notice of Construction Commencement Notice of Construction Completion
 
EM-T-MOBILE-061-230719T-Mobile notice of intent to modify an existing telecommunications facility located at 539 Plains Road, Haddam, Connecticut.  Decision  Extension Request and Council Decision Notice of Construction Completion
 
EM-VER-061-240322 Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 330 Pokorny Road, Haddam, Connecticut.  Decision Notice of Construction Commencement  Extension Request and Council Decision  Notice of Construction Completion
 
EM-VER-061-240708 Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 539 Plains Road, Haddam, Connecticut. Decision Notice of Construction Commencement Notice of Construction Completion
 
EM-ATT-061-240709  New Cingular Wireless PCS, LLC (AT&T) Wireless notice of intent to modify an existing telecommunications facility located at 539 Plains Road, Haddam, Connecticut.  Decision Notice of Construction Completion
 
EM-VER-061-240916 Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 65 Maple Avenue West, Haddam, Connecticut.  Decision Notice of Construction Commencement
 
EM-T-MOBILE-061-241218  T-Mobile notice of intent to modify an existing telecommunications facility located at 539 Plains Road, Haddam, Connecticut.  Decision  Notice of Construction Completion  
 
EM-T-MOBILE-061-250416  T-Mobile notice of intent to modify an existing telecommunications facility located at 270 Hubbard Road, Haddam, Connecticut.  Decision
 
EM-ATT-061-250604  New Cingular Wireless PCS, LLC (AT&T) Wireless notice of intent to modify an existing telecommunications facility located at 285 Chamberlain Hill Road, Haddam, Connecticut.  Decision