PETITION NO. 1500 - Dish Wireless LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for proposed modifications to an existing telecommunications facility located at 36 (a/k/a 38) Hatchetts Hill Road, Old Lyme, Connecticut.  Approved 05/26/22

PETITION NO. 1501 - New Cingular Wireless PCS, LLC (AT&T) petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation of a small wireless facility on a new 43-foot AT&T-owned utility pole that is not used principally for electric distribution service and associated equipment to be located in the Metro-North Railroad right-of-way west of the Indian Field Road/I-95 overpass, Greenwich, Connecticut.  Approved 05/26/22

PETITION NO. 1502 - New Cingular Wireless PCS, LLC (AT&T) petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation of a small wireless facility on a new 43-foot AT&T-owned utility pole that is not used principally for electric distribution service and associated equipment to be located in the public right-of-way along Davis Avenue between the Metro-North Railroad and I-95 right-of-way, Greenwich, Connecticut.  Approved 05/26/22

PETITION NO. 1503 - Bloom Energy Corporation petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a customer-side 750-kilowatt fuel cell facility and associated equipment to be located at Milford Hospital, 300 Seaside Avenue, Milford, Connecticut.  Approved 05/26/22

PETITION NO. 1504 – New Cingular Wireless PCS, LLC (AT&T) petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation of a small wireless facility on a new 41-foot 3-inch AT&T-owned utility pole that is not used principally for electric distribution service and associated equipment to be located along the public right-of-way adjacent to 45 Connair Road, Orange, Connecticut. Approved 06/09/22  Declaratory Ruling Surrendered 7/25/23

PETITION NO. 1505 – New Cingular Wireless PCS, LLC (AT&T) petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation of a small wireless facility on a new 43-foot United Illuminating Company-owned utility pole that is not used principally for electric distribution service and associated equipment to be located along the public right-of-way on the west side of the Callegari Drive cul-de-sac, West Haven, Connecticut. Approved 06/09/22

PETITION NO. 1506 - SCEF1 Fuel Cell, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a grid-side 2.8-megawatt fuel cell facility located at 49 Coon Hollow Road, Derby, Connecticut, and associated electrical interconnection to The United Illuminating Company's existing Ansonia Substation.  Approved 06/23/22

PETITION NO. 1507– VCP EPC, LLC d/b/a Verogy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 2.99-megawatt AC solar photovoltaic electric generating facility located at Dollar Tree Distribution Center, 99 International Drive, Windsor, Connecticut, and associated electrical interconnection.  Approved 07/07/22

PETITION NO. 1508  Enfield Solar One, LLC and VCP, LLC d/b/a Verogy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 4.0-megawatt AC solar photovoltaic electric generating facility located at 110 North Street, Enfield, Connecticut, and associated electrical interconnection.  Approved 07/21/22

PETITION NO. 1509 - Bloom Energy Corporation petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a customer-side 300-kilowatt fuel cell facility and associated equipment to be located at Park Avenue Medical Center, 5520 Park Avenue, Trumbull, Connecticut.Approved 06/23/22

PETITION NO. 1510  - Bloom Energy Corporation petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a customer-side 1-megawatt fuel cell facility and associated equipment to be located at Bozzuto’s Inc., 400 Industrial Avenue, Cheshire, Connecticut.  Approved 07/07/22

PETITION NO. 1511 - New Cingular Wireless PCS, LLC (AT&T) petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation of a small wireless facility on a new 43-foot AT&T-owned utility pole that is not used principally for electric distribution service and associated equipment located along the public right-of-way near the Metro-North Railroad across from 80 Allings Crossing Road, West Haven, Connecticut. Approved 06/23/22

PETITION NO. 1512– New Cingular Wireless PCS, LLC (AT&T) petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation of a small wireless facility on a 37-foot 6-inch state-owned replacement light pole and associated equipment to be located in the southeastern portion of the Manchester Community College campus off Ramey Drive near the Bicentennial Band Shell entrance in Manchester, Connecticut. Approved 07/21/22

PETITION NO. 1513 - Dish Wireless LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for proposed modifications to an existing telecommunications facility located at 150 North Main Street, Branford, Connecticut. Approved 06/23/22

PETITION NO. 1514 – Connecticut Green Bank and CEFIA Holdings, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 1.95-megawatt AC solar photovoltaic electric generating facility located at the Maloney & Webster Correctional Institutions at 900 Highland Avenue, Cheshire, Connecticut, and associated electrical interconnection. Approved 08/18/22

PETITION NO. 1515
- Connecticut Green Bank and CEFIA Holdings, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 1.95-megawatt AC solar photovoltaic electric generating facility located at the Manson Youth Correctional Institution at 42 Jarvis Street, Cheshire, Connecticut, and associated electrical interconnection.  Approved 08/18/22

PETITION NO. 1516
- Connecticut Green Bank and CEFIA Holdings, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 1.175-megawatt AC solar photovoltaic electric generating facility located at the Enfield & Willard Correctional Institutions at 289 and 391 Shaker Road, Enfield, Connecticut, and associated electrical interconnection Approved 08/18/22

PETITION NO. 1517
- Connecticut Green Bank and CEFIA Holdings, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 1.8-megawatt AC solar photovoltaic electric generating facility located at the Osborn Correctional Institution at 335 Bilton Road, Somers, Connecticut, and associated electrical interconnection.  Approved 08/18/22

PETITION NO. 1518 - Dish Wireless LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for proposed modifications to an existing telecommunications facility located at 1081 North Street, Greenwich, Connecticut. Approved 09/15/22

PETITION NO. 1519 - Bloom Energy Corporation petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a customer-side 300-kilowatt fuel cell facility and associated equipment to be located at the University of New Haven, 300 Boston Post Road, West Haven, Connecticut.  Approved 07/21/22

PETITION NO. 1520 - Generate DG Fuel Cell I Bloom Energy Corporation petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a customer-side 500-kilowatt fuel cell facility and associated equipment to be located at New Milford Hospital, 21 Elm Street, New Milford, ConnecticutApproved 8/4/22

PETITION NO. 1521 – EIP Communications I, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed replacement and extension of an existing telecommunications facility located at 75 Wells Road, Wethersfield, Connecticut. Approved 9/29/22

PETITION NO. 1522 -Bloom Energy Corporation petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a customer-side 700-kilowatt fuel cell facility and associated equipment to be located at Allied Printing Services, 1 Allied Way (a/k/a 1046R Tolland Turnpike), Manchester, Connecticut.  Approved 08/04/22

PETITION NO. 1523 – DISH Wireless, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for proposed modifications to an existing telecommunications facility located at 315 Old Hartford Road, Colchester, Connecticut. Approved 08/04/22

PETITION NO. 1524 – DISH Wireless, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for proposed modifications to an existing telecommunications facility located at 181 Clapboard Ridge Road, Danbury, Connecticut. Approved 08/04/22

PETITION NO. 1525 – DISH Wireless, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for proposed modifications to an existing telecommunications facility located at 41 Manitock Hill Road, Waterford, Connecticut. Approved 09/15/22

PETITION NO. 1526 – Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation of a wireless telecommunications facility and associated equipment on the roof of an existing commercial building located at 1300 Hall Boulevard, Bloomfield, Connecticut. Approved 08/18/22

PETITION NO. 1527 – The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed Stevenson to Pootatuck Rebuild Project consisting of the replacement and reconductoring of electric transmission line structures along approximately 8 miles of its existing Nos. 1560, 1808 and 1580 115-kilovolt (kV) electric transmission lines within existing Eversource electric transmission line right-of-way between Eversource’s Stevenson Substation, 1 Roosevelt Drive in Monroe and The United Illuminating Company's Pootatuck Substation, 14 Old Stratford Road in Shelton, Connecticut, and related electric transmission line and substation improvements. Approved 12/08/22

PETITION NO. 1528 – DISH Wireless, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for proposed modifications to an existing telecommunications facility located at 128 Mather Street, Wilton, Connecticut.  Approved 9/15/22

PETITION NO. 1529 – American Tower Corporation petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for proposed modifications to an existing telecommunications facility located at 77 Springbrook Road, Old Saybrook, Connecticut. Approved 09/15/22

PETITION NO. 1530 – American Tower Corporation petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for proposed modifications to an existing telecommunications facility located at 401 Lopus Road, Beacon Falls, Connecticut. Approved 09/15/22

PETITION NO. 1531 – The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed 1200/1300 Line Structure Replacement Project consisting of the replacement and reconductoring of approximately 0.39 mile of its existing No. 1200 and No. 1300 115-kilovolt electric transmission lines within existing Eversource electric transmission line right-of-way between Eversource's Windsor Locks Substation in Windsor Locks and Warehouse Point Junction in East Windsor, Connecticut and related transmission line and substation improvements. Approved 9/29/22

PETITION NO. 1532 – T-Mobile Northeast, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for proposed modifications to an existing telecommunications facility located at 376 Deercliff Road, Avon, Connecticut. Approved 9/29/22

PETITON NO. 1533 – ReNew Developers, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a customer-side 4.99-megawatt fuel cell facility and associated equipment to be located at 42 Old Amston Road, Colchester, Connecticut.  Approved 10/13/22

PETITON NO. 1533A – ReNew Developers, LLC Declaratory Ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a customer-side 4.99-megawatt fuel cell facility and associated equipment to be located at 42 Old Amston Road, Colchester, Connecticut. Reopening of this Declaratory Ruling based on changed conditions pursuant to Connecticut General Statutes §4-181a(b). Approved 11/09/23

PETITION NO. 1534 - Groton Utilities petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed modifications to its existing Buddington Substation located at the intersection of Buddington Road and Gold Star Highway in Groton, Connecticut, and related electric transmission line structure improvements.  Approved 10/13/22

PETITION NO. 1535 – The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed Ledyard Junction to Mystic Substation Upgrade Project consisting of the replacement and reconductoring of approximately 12.8 miles of its existing No. 1280 115-kilovolt (kV) electric transmission line within existing Eversource electric transmission right-of-way between Eversource’s Ledyard Junction in Ledyard and Mystic Substation in Stonington, Connecticut and related electric transmission line and substation improvements.  Approved 12/22/22

PETITION NO. 1536 - T-Mobile petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for proposed modifications to an existing telecommunications facility located at 259 Commerce Street, East Haven, Connecticut. Approved 9/29/22

PETITION NO. 1537- T-Mobile petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed extension and modifications to an existing telecommunications facility located at 1 Fairfield Avenue, Danbury, Connecticut.  Approved 12/08/22

PETITION NO. 1538 New Cingular Wireless PCS, LLC (AT&T) petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation of a small cell telecommunications facility to be located on the cupola at Lyme Town Hall, 480 Hamburg Road, Lyme, Connecticut.  Approved 10/27/22

PETITION NO. 1539 – New Cingular Wireless PCS, LLC (AT&T) petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation of three small wireless facilities on new wood poles that are less than 50 feet in height and associated equipment at Durham Fairgrounds, 24 Townhouse Road, Durham, Connecticut. Approved 12/08/22

PETITION NO. 1540 -  ReNew Developers, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a customer-side 4.0-megawatt fuel cell facility and associated equipment to be located at 234 Riverside Avenue, Bristol, Connecticut. Approved 12/08/22

PETITION NO. 1541 – North Haven Solar One, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 1.625-megawatt AC solar photovoltaic electric generating facility located at 122 Mill Road, North Haven, Connecticut, and associated electrical interconnection.  Approved 12/22/22

PETITION NO. 1542 – New Cingular Wireless PCS, LLC (AT&T) ) petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation of a small wireless facility on a new Eversource-owned utility pole that is less than 50 feet in height and is not used principally for electric distribution service, and associated equipment within the public right of way adjacent to 40 Amelia Place, Stamford, Connecticut. Approved 12/08/22

PETITION NO. 1543 – Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation of a wireless telecommunications facility and associated equipment on the roof of an existing commercial building located at 19 Kenosia Avenue, Danbury, Connecticut. Approved 12/22/22

PETITION NO. 1544 – LSE Pyxis LLC (Lodestar Energy) (NJR Clean Energy Ventures III Corporation) petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 4-megawatt AC solar photovoltaic electric generating facility located at 599 Greenwoods Road East, Norfolk, Connecticut, and Winsted-Norfolk Road, Colebrook, Connecticut and associated electrical interconnection.  Approved 01/19/23

PETITION NO. 1544A – LSE Pyxis LLC (Lodestar Energy) (NJR Clean Energy Ventures III Corporation) amended petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 4-megawatt AC solar photovoltaic electric generating facility located at 599 Greenwoods Road East, Norfolk, Connecticut, and Winsted-Norfolk Road, Colebrook, Connecticut and associated electrical interconnection. Link to Petition No. 1544  Approved 08/03/23

PETITION NO. 1545 – The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed Wawecus Junction to Montville Junction Upgrade Project consisting of the replacement of electric transmission line structures along its existing 8-mile electric transmission line right-of-way shared by its existing 115-kilovolt (kV) Nos. 1000, 1070, 1080 and 1090 Lines between Wawecus Junction in Norwich and Montville Junction in Montville, Connecticut, and related electric transmission line and substation improvements.  Approved 01/19/23

PETITION NO. 1546 – Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation of a wireless telecommunications facility and associated equipment on the roof of an existing academic building on the southwest portion of the Trinity College campus located at 300 Summit Street, Hartford, Connecticut.  Approved 01/05/23

PETITION NO. 1547– SBA Communications Corporation petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed replacement and extension of an existing telecommunications facility located at 277 Huckleberry Hill Road, Avon, Connecticut.  Approved 03/02/23

PETITION NO. 1548 - Bloom Energy Corporation ESA Project Company, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a customer-side 600-kilowatt fuel cell facility and associated equipment to be located at Bristol Hospital, 41 Brewster Road, Bristol, Connecticut.    Approved 01/19/23 

PETITION NO. 1549 – The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed 1714 Line Rebuild Project consisting of the replacement and reconductoring of approximately 9.4 miles of its existing Nos. 1714, 1720, and 1222 115-kilovolt (kV) electric transmission lines and one structure along its 1637 line within existing Eversource electric transmission right-of-way between Eversource’s Weston Substation, 85 Weston Street in Weston and the United Illuminating Company’s Old Town Substation, 122 Kaechele Place in Bridgeport, Connecticut traversing Weston, Fairfield, Easton and Bridgeport and related electric transmission line and substation improvements.  Approved 02/16/23

PETITION NO. 1550 VCP FX CT, LLC VCP FX Middletown, LLC d/b/a Verogy declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 1.5-megawatt AC roof-mounted solar photovoltaic electric generating facility located at the Fed Ex Distribution Center, 49 FedEx Drive, Middletown, Connecticut, and associated electrical interconnection.  Approved 03/02/23

PETITION NO. 1551 - C-Tec Solar, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 1.3-megawatt AC solar photovoltaic electric generating facility located at the former New Britain landfill on Deming Road east of the intersection with Christian Lane, Berlin, Connecticut and associated electrical interconnection.  Approved 03/16/23

PETITION NO. 1552 - Crown Castle and Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed replacement and extension of an existing telecommunications facility located at 845 Ethan Allen Highway, Ridgefield, Connecticut.  Approved 03/02/23

PETITION NO. 1553 – Allen Place FC, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a customer-side 250-kilowatt combined heat and power fuel cell facility and associated equipment near North Campus Hall in the northern portion of the Trinity College campus located at 159 Allen Place, Hartford, Connecticut. Approved 03/16/23

PETITION NO. 1554 - HyAxiom, Inc. petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a customer-side 1.84-megawatt fuel cell facility and associated equipment to be located near East Hall at the University of Hartford campus located at, 200 Bloomfield Avenue, West Hartford, Connecticut.  Approved 03/16/23

PETITION NO. 1555 – Earthlight Technologies petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 1.9-megawatt AC solar photovoltaic electric generating facility located at Collins Aerospace, 1 Hamilton Road, Windsor Locks, Connecticut and associated electrical interconnection.  Approved 03/30/23

PETITION NO. 1556 – The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed Gravel Pit Solar Transmission Interconnection Project consisting of the electrical interconnection between its existing No. 1200 115-kilovolt (kV) transmission line facility and Gravel Pit Solar’s 120 megawatt solar photovoltaic electric generating facility located generally to the east and west of the Amtrak and Connecticut Rail Line, south of Apothecaries Hall Road and north of the South Windsor town boundary in East Windsor, Connecticut, and related electric transmission line and switchyard improvements.  Approved 02/16/23

PETITION NO. 1557 – LSE Hercules LLC (Lodestar Energy) petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 4-megawatt AC solar photovoltaic electric generating facility located at 99, 105 and 113 Raffia Road, Enfield, Connecticut, and associated electrical interconnection.  Approved 04/13/23

PETITION NO. 1558 – Community Power Group LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 4-megawatt AC solar photovoltaic electric generating facility located at 24 Middle Road, Ellington, Connecticut, and associated electrical interconnection. (Findings of Fact)  (Opinion)  (Decision and Order)  Approved 08/03/23

PETITION NO. 1559 - Crown Castle petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed replacement and extension of an existing telecommunications facility located at 41 Padanaram Road, Danbury, Connecticut.   Approved 04/13/23

PETITION NO. 1560 - The Connecticut Light and Power Company d/b/a Eversource Energy (Eversource) petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed Norwalk Bridge Transmission Relocation Project that consists of the relocation and rebuild of two existing overhead 115-kilovolt (kV) electric transmission lines from railroad catenaries and existing structures within the Connecticut Department of Transportation corridor to an underground configuration within roads and across the Norwalk River for approximately .66 miles between existing Structure No. 522WN north of Monroe Street and Structure No. 536WN north of Van Zant Street inNorwalk, Connecticut, and related electric transmission line improvements.  Approved 05/25/23

PETITION NO. 1561- Bloom Energy Corporation petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a customer-side 350-kilowatt fuel cell facility and associated equipment to be located at Naugatuck Valley Community College, 750 Chase Parkway, Waterbury, Connecticut. Approved 05/25/23

PETITION NO. 1562– 524 NLR LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 3.99-megawatt AC solar photovoltaic electric generating facility located at 524 New London Road, Colchester, Connecticut, and associated electrical interconnection.  Approved 06/08/23

PETITION NO. 1563 -Bloom Energy Corporation petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a customer-side 250-kilowatt fuel cell facility and associated equipment to be located at Manchester Community College, 14 Great Path, Manchester, Connecticut.  Approved 05/25/23

PETITION NO. 1564 - Bloom Energy Corporation petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a customer-side 2-megawatt fuel cell facility and associated equipment to be located at Central Connecticut State University, 1615 Stanley Street, New Britain, Connecticut.  Approved 05/25/23

PETITION NO. 1565 – The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed East of Hurd State Park to East Haddam Junction Line Rebuild Project consisting of the replacement of electric transmission line structures along its existing 6.2-mile electric transmission line right-of-way shared by its existing 115-kilovolt (kV) No. 1772 and 345-kV Nos. 362, 376 and 364 Lines between Structure Nos. 12053 and 19099 east of Hurd State Park in East Hampton, Haddam Neck Switching Station in Haddam, and East Haddam Junction in East Haddam, Connecticut traversing the municipalities of East Hampton, Haddam and East Haddam, and related electric transmission line and substation improvements.  Approved 07/20/23

PETITION NO. 1566 -
The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed Card Substation to Wawecus Junction Upgrade Project consisting of the replacement of electric transmission line structures along its existing 12.5-mile electric transmission right-of-way shared by its existing 115-kilovolt (kV) Nos. 1080/1490 and 1080/1070 Lines between Card Substation in Lebanon, Stockhouse Road Substation in Bozrah and Wawecus Junction in Norwich, Connecticut traversing the municipalities of Lebanon, Franklin, Bozrah and Norwich, and related electric transmission line and substation improvements. Approved 09/28/23

PETITION NO. 1567
- The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed 1637/1720 Lines Rebuild Project consisting of the replacement and reconductoring of electric transmission line structures along its existing 4.0 mile electric transmission line right-of-way shared by its existing 115-kilovolt (kV) Nos. 1637 and 1720 Lines between Grist Mill Road in Norwalk, Norwalk Junction in Wilton, and Weston Substation in Weston, Connecticut traversing the municipalities of Norwalk, Wilton, and Weston, and related electric transmission line and substation improvements. Approved 09/14/23

PETITION NO. 1568– Verizon Wireless, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for proposed modifications to an existing telecommunications facility located at 440 Hayden Station Road, Windsor, Connecticut.  Approved 06/22/23

PETITION NO. 1569– Dish Wireless, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for proposed modifications to an existing telecommunications facility located at St. Matthew Lutheran Church, 224 Lovely Street, Avon, Connecticut. Approved 09/28/23

PETITION NO. 1570 - Dish Wireless, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for proposed modifications to an existing telecommunications facility located at Chesley Park, 35 Wildwood Street, New Britain, Connecticut. Approved 09/14/23.

PETITION NO. 1571– Dish Wireless, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for proposed modifications to an existing telecommunications facility located at the Norwich Public Works Department, 50 Clinton Avenue, Norwich, Connecticut. Approved 09/28/23

PETITION NO. 1572 – East Windsor Solar Two, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 4.0-megawatt AC solar photovoltaic electric generating facility located at 31 Thrall Road, East Windsor, Connecticut, and associated electrical interconnection. (Findings of Fact)  (Opinion)  (Decision and Order)  Approved 10/12/23

PETITION NO. 1573 - The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed Brookfield Junction to Bates Rock Substation Upgrade Project consisting of the replacement and reconductoring of electric transmission line structures along approximately 6.7 miles of its existing electric transmission line right-of-way shared by its existing 115-kilovolt (kV) Nos. 1887, 1268, and 1485 Lines between Brookfield Junction in Brookfield and Shepaug Substation in Newtown, and along approximately 0.5 mile of its existing electric transmission line right-of-way shared by its existing 115-kV Nos. 1622 and 1485 Lines between Shepaug Substation and Bates Rock Substation in Southbury, Connecticut traversing the municipalities of Brookfield, Newtown and Southbury, and related electric transmission line and substation improvements.  Approved 08/03/23

PETITION NO. 1574 The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed Southington Substation to Cook Hill Junction Rebuild Project consisting of the replacement and reconductoring of electric transmission line structures along approximately 11.2 miles of its existing electric transmission line right-of-way shared by its existing 115-kilovolt (kV) 1690, 1208, 1355 and 1610 Lines between Southington Substation in Southington and Cook Hill Junction in Wallingford including the installation of approximately 650 feet of the 1690 Line underground at Lucchini Junction in Meriden, traversing the municipalities of Southington, Cheshire, Wallingford, and Meriden, Connecticut, and related electric transmission line and substation improvements.  Approved 08/17/23

PETITION NO. 1575 The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for proposed modifications to its existing Salisbury Substation located at 316 Indian Mountain Road, Salisbury, Connecticut, and related electric transmission line structure improvements.  Approved 08/31/23

PETITION NO. 1576 The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed Middletown Substation to Oxbow Junction Upgrade Project consisting of the replacement of electric transmission line structures along approximately 5.5 miles of its existing No. 1620 115-kilovolt (kV) electric transmission line right of way between Middletown Substation in Middletown and Oxbow Junction in Haddam, Connecticut, and related electric transmission line and substation improvements.  Approved 08/31/23

PETITION NO. 1577 The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed Frost Bridge to Noera Rebuild Project consisting of the replacement and reconductoring of electric transmission line structures along approximately 5 miles of its existing electric transmission line right-of-way shared by its existing 115-kilovolt (kV) 1163 and 1550 Lines between Frost Bridge Substation in Watertown to Noera Substation in Waterbury, traversing the municipalities of Watertown, Thomaston, Plymouth and Waterbury, Connecticut, and related electric transmission line and substation improvements.  Approved 08/31/23

PETITION NO. 1578 – LSE Horologium LLC (Lodestar Energy) petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 1.99-megawatt AC solar photovoltaic electric generating facility located at Parcel No. 5-6-236-21, 163 North Windham Road, Windham, Connecticut, and associated electrical interconnection. Withdrawn 08/23/23

PETITION NO. 1579 – KCE CT 9, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 5.0-megawatt AC battery energy storage facility located at 2 Ella T. Grasso Turnpike, Windsor Locks, Connecticut and associated electrical interconnection. Approved 11/9/23

PETITION NO. 1580 – CT Solar PDF, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 1.45-megawatt AC solar photovoltaic electric generating facility located at two parcels on the Medtronic campus at 86 Quinnipiac Avenue and 195 McDermott Road,North Haven, Connecticut, and associated electrical interconnection.  Approved 10/12/23

PETITION NO. 1581 - KCE CT 8, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 4.9-megawatt AC battery energy storage facility located at 44 Skinner Street, East Hampton, Connecticut, and associated electrical interconnection. Approved 11/09/23

PETITION NO. 1582 - The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed Pootatuck to West Devon Rebuild Project consisting of the replacement and reconductoring of electric transmission line structures along approximately 3.3 miles of its existing electric transmission line right-of-way shared by its existing 115-kilovolt (kV) 1580, 1241, 1483 and 1545 Lines between The United Illuminating Company’s (UI) Pootatuck Substation in Shelton, UI’s Trap Falls Substation in Shelton and Eversource’s West Devon Junction in Stratford, traversing the municipalities of Shelton and Stratford, Connecticut, and related electric transmission line and substation improvements.  Approved 10/12/23

PETITION NO. 1584 – Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation of a small wireless telecommunications facility and associated equipment on the roof of a City-owned, multiuse building located at 1212 Main Street, Hartford, Connecticut. Approved 09/28/23

PETITION NO. 1585– Endurant Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 4.9-megawatt AC battery energy storage facility located at 508 North Colony Street, Meriden, Connecticut, and associated electrical interconnection. Approved 12/07/23

PETITION NO. 1586  Dominion Energy Nuclear Connecticut, Inc. petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, that neither a new Certificate of Environmental Compatibility and Public Need (Certificate) nor a modification to its existing Certificate is required to revise the boundaries of the Millstone Power Station electric generating facility site located off Rope Ferry Road, WaterfordConnecticut. Declined Without Prejudice to Issue a Declaratory Ruling 01/04/24

PETITION NO. 1587 – Endurant Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 4.9-megawatt AC battery energy storage facility located at 350 Knotter Drive, Cheshire, Connecticut, and associated electrical interconnection. Approved 12/21/23

PETITION NO. 1588 – Endurant Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 7.0-megawatt AC battery energy storage facility located at 22 Deerfield Road, Windsor, Connecticut, and associated electrical interconnection. Approved 12/21/23

PETITION NO. 1589 – USS Somers Solar, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 3.0-megawatt AC solar photovoltaic electric generating facility located at 360 Somers Road, Ellington, Connecticut, and associated electrical interconnection. Voted on 02/01/24

PETITION NO. 1590 – TowerNorth Development, LLC and New Cingular Wireless, PCS d/b/a AT&T petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed replacement of an existing municipal communications tower located at 13 Pomeroy Avenue, Meriden, Connecticut. Approved 12/21/23

PETITION NO. 1591 - KCE CT 5, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 5.0-megawatt AC battery energy storage facility located at Village Hill Road, Stafford (Parcel No. 71-6) and Willington (Parcel No. 52-001-00), Connecticut, and associated electrical interconnection. Approved 01/18/24

PETITION NO. 1592 – Santa Fuel, Inc. petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 3.85-megawatt AC solar photovoltaic electric generating facility located at 159 South Road, Somers, Connecticut, and associated electrical interconnection. (Findings of Fact) (Opinion) (Decision and Order) Denied 03/15/24

PETITION NO. 1593– The Connecticut Light and Power Company d/b/a Eversource Energy petition for the proposed Montville Substation to North of Kitemaug Road Rebuild Project consisting of the replacement and reconductoring of electric transmission line structures along approximately 1.1 miles of its existing electric transmission line right-of-way shared by its existing 115-kilovolt (kV) 1090 and 1000 Lines between Montville Substation and approximately 1200 feet north of Kitemaug Road in Montville, Connecticut, and related electric transmission line and substation improvements. Approved 01/04/24

PETITION NO. 1594 – Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation of a small wireless telecommunications facility on the roof of the Greenwich Country Club clubhouse and associated equipment at ground level located at 19 Doubling Road, Greenwich, Connecticut. Approved 01/04/24

PETITION NO. 1595 - HyAxiom, Inc. petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a grid-side 4.14-megawatt fuel cell facility and associated equipment to be located at 35 North Main Street, Ansonia, Connecticut, and associated electrical interconnection. Approved 02/15/24

PETITION NO. 1596 – USS Torrington Solar, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 1.99-megawatt AC solar photovoltaic electric generating facility located on the former Torrington Landfill at 105 Vista Drive, Torrington, Connecticut, and associated electrical interconnection. Approved 01/18/24

PETITION NO. 1597 – Greenskies Clean Energy LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 3.74-megawatt AC solar photovoltaic electric generating facility located at Parcel No. 017-150-066, Spencer Hill Road, Winchester, Connecticut, and associated electrical interconnection. Approved 02/29/24

PETITION NO. 1602 
 Glastonbury Solar One, LLC and VCP, LLC d/b/a Verogy, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 3.0-megawatt AC solar photovoltaic electric generating facility located at 17 Wickham Road, Glastonbury, Connecticut, and associated electrical interconnection. Approved 04/11/24

PETITION NO. 1603 – New Cingular Wireless PCS, LLC (AT&T) petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for proposed modifications to an existing telecommunications facility located at 48 Newtown Road, Danbury, Connecticut. Rejected as Incomplete 01/26/24

PETITION NO. 1610 –
ARX Wireless, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed replacement of an existing telecommunications facility and associated equipment located at 1605 Durham Road, Wallingford, Connecticut.Withdrawn 02/28/24