Due to the personally identifying information contained in written limited appearance statements from the public, any written limited appearance statements that are received by the Council for any matter are available to be viewed at the Council’s office Monday through Friday from 8:30 a.m. to 4:30 p.m. or available to be sent via e-mail upon request. Please allow adequate time for processing.

Long Island Sound Resource and Use Inventory/Long Island Sound Blue Plan Survey

Petition No. 1686 - Greenskies Clean Energy LLC, South Street, Morris, CT

 

PETITION NO. 1686 – Greenskies Clean Energy LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the construction, maintenance and operation of a 4.99-megawatt AC solar photovoltaic electric generating facility and associated equipment located at 54 South Street, Morris, Connecticut, and associated electrical interconnection.

 

PETITION (recd. 08/12/25)

Petition Narrative, 08/11/25
Appendices
Appendix A – Civil Site Plans
Appendix B.1 – Equipment Specifications (Peak Duo ML-G12S)
Appendix B.2 – Equipment Specifications (Ballasted Power Peak Specs)
Appendix C – Operations and Maintenance Plan
Appendix D – Decommissioning Plan
Appendix E – Stormwater Report
Appendix F.1 – SHPO Letter
Appendix F.2 – Phase IA - Assessment Survey
Appendix F.3 – Phase IB - Reconnaissance Survey
Appendix F.4 – Additional Phase IB Report
Appendix G – Wetlands Delineation Report
Appendix H – NDDB Letter
Appendix I.1– Visual Cross Sections
Appendix I.2 – Visual Impact 1
Appendix I.3 – Visual Impact 2
Appendix J – FAA Letter
Appendix K – DEEP No Material Impact Letter
Appendix L.1 – DOAG No Material Impact Letter
Appendix L.2 – Proposed Agricultural Co-Use
Appendix L.3 – Proposed Project Layout
Appendix L.4 – Soil Health Assessment
Appendix L.5 – Soil Management Plan
Appendix L.6 – Photos
Appendix M – Noise Study
Appendix N.1 – Local Outreach
Appendix N.2 – Certificates of Mailing

Figures
Figure 1 – Site Location Map
Figure 2 – Zoning Map
Figure 3 – Tax Parcel Map
Figure 4 – Site Survey
Figure 5 – Proposed Project Layout
Figure 6 – Farmland Soils Figure
Figure 7 – Delineated Wetlands
Figure 8 – Forestland Habitat Impact Area
Figure 9 – Aquifer Protection Map
Figure 10 – Public Water Supply Map
Figure 11 – Groundwater Quality Map
Figure 12 – NRCS Soils Map

 

CGS §16-50k CORE FOREST AND PRIME FARMLAND DETERMINATIONS

Department of Energy and Environmental Protection C.G.S. §16-50k No Material Impact to Core Forest Determination Letter, 07/28/25
Department of Agriculture C.G.S. §16-50k No Material Impact to Prime Farmland Determination Letter, 06/25/25

 

PROCEDURAL CORRESPONDENCE

Council Letter to Town of Morris, 08/13/25
Council State Agency Comment Memorandum, 08/13/25
Council Set Date for Decision, 09/18/25

 

STATE AGENCY COMMENTS

Council on Environmental Quality Comments, 08/27/25
Department of Energy and Environmental Protection Comments, 09/09/25
Department of Public Health Comments, 09/11/25

 

SCHEDULE

Schedule, 08/12/25
Schedule, 09/18/25

 

SERVICE LIST

Service List, 08/12/25

 

PETITIONER - Greenskies Clean Energy LLC