JANUARY 2025
Wednesday, January 1, 2025
OFFICE CLOSED - New Years Day
Wednesday, January 8, 2025
PETITION NO. 1592A – Santa Fuel, Inc. petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 3.85-megawatt AC solar photovoltaic electric generating facility located at 159 South Road, Somers, Connecticut, and associated electrical interconnection. Reopening of this petition based on changed conditions pursuant to Connecticut General Statutes §4-181a(b). Reopening of this petition based on changed conditions pursuant to Connecticut General Statutes §4-181a(b).
11AM - Pre-Hearing Conference
Thursday, January 9, 2025
1PM - Energy/telecommunications Meeting via Zoom Conferencing
Meeting Materials for the January 9, 2025 Energy/Telecommunications Meeting
- Draft Energy/Telecommunications December 19, 2024 Meeting Minutes
- Docket No. 414 (Verizon/Greenwich) - Motion for Protective Order - Facility Management Financial Terms
- Docket No. 525 (Greenskies/Stonington) - Draft Findings of Fact
- Docket No. 525 (Greenskies/Stonington) - Draft Opinion
- Docket No. 525 (Greenskies/Stonington) - Draft Decision and Order
- Docket No. 528 (Tarpon Towers/Verizon/Andover) - Completeness Review and Draft Schedule
- Petition No. 1637 (KCE CT 11, LLC/Granby) - Draft Findings of Fact
- Petition No. 1648 (Verizon/Manchester) - Draft Staff Report
- Tower Share Request Consent Calendar
Thursday, January 16, 2025
PETITION NO. 1643 – C-Tec Solar, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 2.95-megawatt AC solar photovoltaic electric generating facility and associated equipment to be located at 77 Pompeo Road, Thompson, Connecticut, and associated electrical interconnection.
2PM/6:30PM - Public Hearing/Public Comment Session
HEARING INFORMATION
January 16, 2025 Hearing Documents,11/08/24
1. Instructions for Public Access to Remote Public Hearing
2. Public Hearing Notice
3. Hearing Program
4. Citizens Guide to Siting Council Procedures; and
5. Proposed Facility Site Plan
Zoom Remote Public Hearing Recording, 01/16/25 (Passcode: b!3RC=h#)
Monday, January 20, 2025
OFFICE CLOSED - Martin Luther King Jr. Day
Wednesday, January 22, 2025
DOCKET NO. 528 – Tarpon Towers III, LLC and Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at 746 East Street, Andover, Connecticut.
11AM - Pre-Hearing Conference
Thursday, January 23, 2025
1PM - Energy/telecommunications Meeting via Zoom Conferencing
Meeting Materials for the January 23, 2025 Energy/Telecommunications Meeting
- Draft Energy/Telecommunications January 9, 2025 Meeting Minutes
- Docket No. 526 (Greenskies/Stonington) - Draft Findings of Fact
- Petition No. 1637 (KCE CT 11, LLC/Granby) - Draft Findings of Fact
- Petition No. 1637 (KCE CT 11, LLC/Granby) - Draft Opinion
- Petition No. 1637 (KCE CT 11, LLC/Granby) - Draft Decision and Order
- Petition No. 1638 (LSE Sextans/Torrington) - Draft Staff Report
- Petition No. 1639 (T-Mobile/Killingworth) - Draft Staff Report
- Petition No. 1640 (Eversource/Oxford) - Draft Staff Report
- Tower Share Request Consent Calendar
Thursday, January 30, 2025
PETITION NO. 1592A– Santa Fuel, Inc. petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 3.85-megawatt AC solar photovoltaic electric generating facility located at 159 South Road, Somers, Connecticut, and associated electrical interconnection. Reopening of this petition based on changed conditions pursuant to Connecticut General Statutes §4-181a(b).
2PM/6:30PM - Public Hearing/Public Comment Session
HEARING INFORMATION
January 30, 2025 Hearing Documents, 11/22/24
1. Instructions for Public Access to Remote Public Hearing
2. Public Hearing Notice
3. Hearing Program
4. Citizens Guide to Siting Council Procedures; and
5. Proposed Facility Site Plan
Zoom Remote Public Hearing Recording, 01/30/25 (Passcode: 93xz1D*G)
FEBRUARY 2025
Thursday, February 6, 2025
1PM - Energy/telecommunications Meeting via Zoom Conferencing
Meeting Materials for the February 6, 2025 Energy/Telecommunications Meeting
- Draft Energy/Telecommunications January 23, 2025 Meeting Minutes
- Docket No. 470B (NTE CT, LLC/Killingly) - Windham Energy, LLC Motion to Reopen Based on Changed Conditions Specifically Limited to the Status of the Existing Certificate
- Docket No. 526 (Greenskies Clean Energy/Stonington) - Draft Findings of Fact
- Docket No. 526 (Greenskies Clean Energy/Stonington) - Draft Opinion
- Docket No. 526 (Greenskies Clean Energy/Stonington) - Draft Decision and Order
- Docket No. 529 (Homeland Towers/Verizon/Haddam) - Completeness Review and Draft Schedule
- Petition No. 923A (Fuel Cell Energy/Torrington - Draft Staff Report
- Petition No. 1602A (Glastonbury Solar One) - Draft Staff Report
- Tower Share Request Consent Calendar
Wednesday, February 12, 2025
OFFICE CLOSED - Lincoln's Birthday
Thursday, February 13, 2025
DOCKET NO. 528 – Tarpon Towers III, LLC and Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at 746 East Street, Andover, Connecticut.
2PM/6:30PM - Public Hearing/Public Comment Session
HEARING INFORMATION
February 13, 2025 Hearing Documents, 01/10/24
1. Instructions for Public Access to Remote Public Hearing
2. Public Hearing Notice
3. Hearing Program
4. Citizens Guide to Siting Council Procedures; and
5. Proposed Facility Site Plan
Monday, February 17, 2025
OFFICE CLOSED - Washington's Birthday
Wednesday, February 19, 2025
DOCKET NO. 529– Homeland Towers, LLC and Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at Parcel No. 65-002-1, Old Chester Road North, Haddam, Connecticut.
11AM - Pre-Hearing Conference
Thursday, February 20, 2025
1PM - Energy/telecommunications Meeting via Zoom Conferencing
Meeting Materials for the February 20, 2025 Energy/Telecommunications Meeting
- Draft Energy/Telecommunications February 6, 2025 Meeting Minutes
- Docket No. 470C (NTE CT/Killingly) - Completeness Review and Draft Schedule
- Docket No. 530 (Homeland Towers/Verizon) - Completeness Review and Draft Schedule
- Docket No. 531 (Arx Wireless/AT&T) - Completeness Review and Draft Schedule
- Petition No. 1643 (C-Tec Solar/Thompson) - Draft Findings of Fact
- Petition No. 1646 (Kinsley Energy Systems/New Canaan) - Draft Staff Report
- Petition No. 1655 (Borrelli Solar/East Haven) - Town of East Haven Planning and Zoning Department Request for Hearing
- Tower Share Request Consent Calendar
MARCH 2025
Thursday, March 6, 2025
1PM - Energy/telecommunications Meeting via Zoom Conferencing
Meeting Materials for the March 6, 2025 Energy/Telecommunications Meeting
- Draft Energy/Telecommunications February 20, 2025 Meeting Minutes
- Docket No. 531 (Arx Wireless/ATT/Ansonia) - Verizon Request for Intervenor Status
- Petition No. 1598 (Windsor Solar One/Windsor) - Draft D&M Plan Staff Report
- Petition No. 1642 (Eversource/Danbury Underground Cable Replacement Project) - Draft Staff Report
- Petition No. 1643 (C-Tec Solar/Thompson) - Draft Findings of Fact
- Petition No. 1643 (C-Tec Solar/Thompson) - Draft Opinion
- Petition No. 1643 (C-Tec Solar/Thompson) - Draft Decision and Order
- Petition No. 1649 (Eversource/Canaan)- Draft Staff Report
- Petition No. 1651 (Fairy Lake/Salem) - Motion for Protective Order Interrogatory No. 10 Cost Information
- Petition No. 1655 (Borrelli solar/East Haven) - Completeness Review and Draft Schedule
Wednesday, March 12, 2025
DOCKET NO. 470C - NTE Connecticut, LLC Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a 650-megawatt dual-fuel combined cycle electric generating facility and associated electrical interconnection switchyard located at 180 and 189 Lake Road, Killingly, Connecticut. Reopening of this Certificate based on changed conditions specifically limited to the status of the existing Certificate, pursuant to Connecticut General Statutes §4-181a(b). Link to DOCKET NO. 470B
11AM - Pre-Hearing Conference
Thursday, March 13, 2025
DOCKET NO. 529– Homeland Towers, LLC and Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at Parcel No. 65-002-1, Old Chester Road North, Haddam, Connecticut.
2PM/6:30PM - Public Hearing/Public Comment Session
HEARING INFORMATION
March 13, 2025 Hearing Documents, 02/07/25
1. Instructions for Public Access to Remote Public Hearing
2. Public Hearing Notice
3. Hearing Program
4. Citizens Guide to Siting Council Procedures; and
5. Proposed Facility Site Plan
Wednesday, March 19, 2025
PETITION NO. 1655 – Borrelli Solar LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 1.99-megawatt AC solar photovoltaic electric generating facility and associated equipment to be located at 179 and 197 Borrelli Road, East Haven, Connecticut, and associated electrical interconnection.
11AM - Pre-Hearing Conference
Thursday, March 20, 2025
1PM - Energy/telecommunications Meeting via Zoom Conferencing
Meeting Materials for the March 20, 2025 Energy/Telecommunications Meeting
- Draft Energy/Telecommunications March 6, 2025 Meeting Minutes
- Docket No. 490 (UI/Bridgeport) - Draft D&M Plan Staff Report
- Docket No. 519 (Verizon/East Windsor) - Transfer of Certificate Request
- Docket No. 530 (Homeland/Verizon/East Haddam) - Stephen and Cindyann Longobardi Request for Party Status
- Petition No. 1440A ( Verizon/New Haven) - Draft Staff Report
- Petition No. 1592A (Santa Fuel/Somers) - Draft Staff Report
- Petition No. 1644 (C-Tec Solar/Bristol) - Draft Staff Report
- Petition No. 1645 (VCP Mansfield) - Draft Staff Report
- Tower Share Request Consent Calendar
Wednesday, March 26, 2025
DOCKET NO. 530 – Homeland Towers, LLC and Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at 196 East Haddam-Colchester Turnpike, East Haddam, Connecticut.
11AM - Pre-Hearing Conference
MARCH 2025
Thursday, March 6, 2025
1PM - Energy/telecommunications Meeting via Zoom Conferencing
Meeting Materials for the March 6, 2025 Energy/Telecommunications Meeting
- Draft Energy/Telecommunications February 20, 2025 Meeting Minutes
- Docket No. 531 (Arx Wireless/ATT/Ansonia) - Verizon Request for Intervenor Status
- Petition No. 1598 (Windsor Solar One/Windsor) - Draft D&M Plan Staff Report
- Petition No. 1642 (Eversource/Danbury Underground Cable Replacement Project) - Draft Staff Report
- Petition No. 1643 (C-Tec Solar/Thompson) - Draft Findings of Fact
- Petition No. 1643 (C-Tec Solar/Thompson) - Draft Opinion
- Petition No. 1643 (C-Tec Solar/Thompson) - Draft Decision and Order
- Petition No. 1649 (Eversource/Canaan)- Draft Staff Report
- Petition No. 1651 (Fairy Lake/Salem) - Motion for Protective Order Interrogatory No. 10 Cost Information
- Petition No. 1655 (Borrelli solar/East Haven) - Completeness Review and Draft Schedule
Wednesday, March 12, 2025
DOCKET NO. 470C - NTE Connecticut, LLC Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a 650-megawatt dual-fuel combined cycle electric generating facility and associated electrical interconnection switchyard located at 180 and 189 Lake Road, Killingly, Connecticut. Reopening of this Certificate based on changed conditions specifically limited to the status of the existing Certificate, pursuant to Connecticut General Statutes §4-181a(b). Link to DOCKET NO. 470B
11AM - Pre-Hearing Conference
Thursday, March 13, 2025
DOCKET NO. 529– Homeland Towers, LLC and Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at Parcel No. 65-002-1, Old Chester Road North, Haddam, Connecticut.
2PM/6:30PM - Public Hearing/Public Comment Session
HEARING INFORMATION
March 13, 2025 Hearing Documents, 02/07/25
1. Instructions for Public Access to Remote Public Hearing
2. Public Hearing Notice
3. Hearing Program
4. Citizens Guide to Siting Council Procedures; and
5. Proposed Facility Site Plan
Wednesday, March 19, 2025
PETITION NO. 1655 – Borrelli Solar LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 1.99-megawatt AC solar photovoltaic electric generating facility and associated equipment to be located at 179 and 197 Borrelli Road, East Haven, Connecticut, and associated electrical interconnection.
11AM - Pre-Hearing Conference
Thursday, March 20, 2025
1PM - Energy/telecommunications Meeting via Zoom Conferencing
Meeting Materials for the March 20, 2025 Energy/Telecommunications Meeting
- Draft Energy/Telecommunications March 6, 2025 Meeting Minutes
- Docket No. 490 (UI/Bridgeport) - Draft D&M Plan Staff Report
- Docket No. 519 (Verizon/East Windsor) - Transfer of Certificate Request
- Docket No. 530 (Homeland/Verizon/East Haddam) - Stephen and Cindyann Longobardi Request for Party Status
- Petition No. 1440A ( Verizon/New Haven) - Draft Staff Report
- Petition No. 1592A (Santa Fuel/Somers) - Draft Staff Report
- Petition No. 1644 (C-Tec Solar/Bristol) - Draft Staff Report
- Petition No. 1645 (VCP Mansfield) - Draft Staff Report
- Tower Share Request Consent Calendar
Wednesday, March 26, 2025
DOCKET NO. 530 – Homeland Towers, LLC and Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at 196 East Haddam-Colchester Turnpike, East Haddam, Connecticut.
11AM - Pre-Hearing Conference
APRIL 2025
Tuesday, April 1, 2025
DOCKET NO. 470C - NTE Connecticut, LLC Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a 650-megawatt dual-fuel combined cycle electric generating facility and associated electrical interconnection switchyard located at 180 and 189 Lake Road, Killingly, Connecticut. Reopening of this Certificate based on changed conditions specifically limited to the status of the existing Certificate, pursuant to Connecticut General Statutes §4-181a(b). Link to DOCKET NO. 470B
2PM/6:30PM - Public Hearing/Public Comment Session
HEARING INFORMATION
April 1, 2025 Hearing Documents, 02/21/25
1. Instructions for Public Access to Remote Public Hearing
2. Public Hearing Notice
3. Hearing Program
Thursday, April 3, 2025
1PM - Energy/telecommunications Meeting via Zoom Conferencing
Meeting Materials for the April 3, 2025 Energy/Telecommunications Meeting
- Draft Energy/Telecommunications March 20, 2025 Meeting Minutes
- Docket No. 522 (Stafford Solar One/Stafford) - Draft D&M Staff Report
- Docket No. 533 (Tarpon Towers III/Verizon/Naugatuck) - Completeness Review and Draft Schedule
- Petition No. 1592A (Santa Fuel/Somers) - Draft Findings of Fact
- Petition No. 1592A (Santa Fuel/Somers) - Draft Opinion
- Petition No. 1592A (Santa Fuel/Somers) - Draft Decision and Order
- Petition No. 1647 (East Point Energy/Oxford) - Motion for Protective Order - Regulations of Connecticut State Agencies §16-50j-22a(d) - Proprietary Information
- Tower Share Request Consent Calendar
Thursday, April 10, 2025
PETITION NO. 1655 – Borrelli Solar LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 1.99-megawatt AC solar photovoltaic electric generating facility and associated equipment to be located at 179 and 197 Borrelli Road, East Haven, Connecticut, and associated electrical interconnection.
2PM/6:30PM - Public Hearing/Public Comment Session
HEARING INFORMATION
April 10, 2025 Hearing Documents, 03/07/25
1. Instructions for Public Access to Remote Public Hearing
2. Public Hearing Notice
3. Hearing Program
4. Citizens Guide to Siting Council Procedures; and
5. Proposed Facility Site Plan
Zoom Remote Public Hearing Recording, 04/10/25 (Passcode: EhZGV=6q)
Wednesday, April 16, 2025
DOCKET NO. 531– Arx Wireless Infrastructure, LLC and New Cingular Wireless PCS, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at 62 and 64 Pershing Drive, Ansonia, Connecticut.
11AM - Pre-Hearing Conference
Thursday, April 17, 2025
1PM - Energy/telecommunications Meeting via Zoom Conferencing
Meeting Materials for the April 17, 2025 Energy/Telecommunications Meeting
- Draft Energy/Telecommunications April 3, 2025 Meeting Minutes
- Docket No. 521 (Tarpon Towers III/Cheshire) - Draft D&M Plan Staff Report
- Docket No. 528 (Tarpon Towers III/Verizon/Andover) - Draft Findings of Fact
- Docket No. 530 (Homeland Towers/Verizon/East Haddam) - Town of East Haddam Request for Party and CEPA Intervenor Status
- Docket No. 532 (LSE Serpens/Torrington) - Completeness Review and Draft Schedule
- Petition No. 1650 (American Tower Corporation/Wolcott) - Draft Staff Report
- Petition No. 1652 (391 Durham LLC/Madison) - Draft Staff Report
- Tower Share Request Consent Calendar
Friday, April 18, 2025
OFFICE CLOSED - Good Friday
Thursday, April 24, 2025
DOCKET NO. 530 – Homeland Towers, LLC and Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at 196 East Haddam-Colchester Turnpike, East Haddam, Connecticut.
2PM/6:30PM - Public Hearing/Public Comment Session
HEARING INFORMATION
April 24, 2025 Hearing Documents, 02/21/25
1. Instructions for Public Access to Remote Public Hearing
2. Public Hearing Notice
3. Hearing Program
4. Citizens Guide to Siting Council Procedures; and
5. Proposed Facility Site Plan
Wednesday, April 30, 2025
DOCKET NO. 533 – Tarpon Towers III, LLC and Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at 161 Conrad Street, Naugatuck, Connecticut.
11AM - Pre-Hearing Conference
MAY 2025
Thursday, May 1, 2025
1PM - Energy/telecommunications Meeting via Zoom Conferencing
Meeting Materials for the May 1, 2025 Energy/Telecommunications Meeting
- Draft Energy/Telecommunication April 17, 2025 Meeting Minutes
- Docket No. 528 (Tarpon Towers III/Verizon/Andover) - Draft Findings of Fact
- Docket No. 528 (Tarpon Towers III/Verizon/Andover) - Draft Opinion
- Docket No. 528 (Tarpon Towers III/Verizon/Andover) - Draft Decision and Order
- Docket No. 533 (Tarpon Towers III/Verizon/Naugatuck) - AT&T Request for Intervenor Status
- Docket No. 533 (Tarpon Towers III/Verizon/Naugatuck) - T-Mobile Request for Intervenor Status
- Docket No. 534 (The Towers/Woodstock Ave West/Woodstock) - Completeness Review and Schedule
- Docket No. 535 (The Towers/Norwich Worcester Tnpk./Woodstock) - Completeness Review and Schedule
- Petition No. 1558 (Community Power Group LLC/Ellington) - Draft D&M Staff Report
- Tower Share Request Consent Calendar
Thursday, May 8, 2025
DOCKET NO. 531– Arx Wireless Infrastructure, LLC and New Cingular Wireless PCS, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at 62 and 64 Pershing Drive, Ansonia, Connecticut.
2PM/6:30PM - Public Hearing/Public Comment Session
HEARING INFORMATION
May 8, 2025 Hearing Documents, 02/21/25
1. Instructions for Public Access to Remote Public Hearing
2. Public Hearing Notice
3. Hearing Program
4. Citizens Guide to Siting Council Procedures; and
5. Proposed Facility Site Plan
Wednesday, May 14, 2025
DOCKET NO. 532 – LSE Serpens LLC (Lodestar Energy) application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a 3.0-megawatt-AC solar photovoltaic electric generating facility and associated equipment on 13 parcels located south of West Hill Road (Parcel Nos. 253/003/018; 253/003/033 through 043 and 053-003-045), Torrington, Connecticut and associated electrical interconnection.
11AM - Pre-Hearing Conference
Thursday, May 15, 2025
1PM - Energy/telecommunications Meeting via Zoom Conferencing
Meeting Materials for the May 15, 2025 Energy/Telecommunications Meeting
- Draft Energy/Telecommunications May 1, 2025 Meeting Minutes
- Docket No. 492 (Gravel Pit Solar/South Windsor) - Motion to Reopen and Modify Based on Changed Conditions
- Docket No. 529 (Homeland/Verizon/Haddam) - Draft Findings of Fact
- Docket No. 536 (Tarpon Towers/Verizon/Norfolk) - Completeness Review and Schedule
- Docket No. 537 (The Towers/Stonington) - Completeness Review and Schedule
- Petition No. 1651 (Fairy Lake/Salem) - Draft Staff Report
- Petition No. 1659 (Verizon/Mansfield) - Draft Staff Report
- Tower Share Request Consent Calendar
Tuesday, May 20, 2025
DOCKET NO. 530 – Homeland Towers, LLC and Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at 196 East Haddam-Colchester Turnpike, East Haddam, Connecticut.
2PM - Continued Evidentiary Hearing
Council May 20, 2025 Continuation of the Evidentiary Hearing Memorandum, 04/25/25
1. Instructions for Access to the May 20, 2025 Evidentiary Hearing Session
2. Hearing Program
Thursday, May 22, 2025
DOCKET NO. 533 – Tarpon Towers III, LLC and Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at 161 Conrad Street, Naugatuck, Connecticut.
2PM/6:30PM - Public Hearing/Public Comment Session
HEARING INFORMATION
May 22, 2025 Hearing Documents, 04/04/25
1. Instructions for Public Access to Remote Public Hearing
2. Public Hearing Notice
3. Hearing Program
4. Citizens Guide to Siting Council Procedures; and
5. Proposed Facility Site Plan
Monday, May 26, 2025
OFFICE CLOSED - Memorial Day
Thursday, May 29, 2025
1PM - Energy/telecommunications Meeting via Zoom Conferencing
Meeting Materials for the May 29, 2025 Energy/Telecommunications Meeting
- Draft Energy/Telecommunications May 15, 2025 Meeting Minutes
- Docket No. 492A (Gravel Pit Solar/East Windsor) - Completeness Review and Schedule
- Docket No. 492A (Gravel Pit Solar/East Windsor) - Town of East Windsor Request for Party Status
- Docket No. 519 (The Towers/East Windsor) - Draft D&M Plan Staff Report
- Docket No. 529 (Homeland Towers/Verizon/Haddam) - Draft Findings of Fact
- Docket No. 529 (Homeland Towers/Verizon/Haddam) - Draft Opinion
- Docket No. 529 (Homeland Towers/Verizon/Haddam) - Draft Decision and Order
- Docket No. 532 (Lodestar/Torrington) - City of Torrington Request for Party Status
- Docket No. 538 (The Towers/Lebanon) - Completeness Review and Schedule
- Docket No. 539 (The Towers/Mansfield) - Completeness Review and Schedule
- Petition No. 1406A (Doosan Fuel Cell/Bridgeport) - Draft D&M Plan Staff Report
- Petition No. 1647 (East Point Energy/Oxford) - Draft Staff Report
- Petition No. 1653 (East Point Energy/Middletown) - Draft Staff Report
- Tower Share Request Consent Calendar
MAY 2025
Thursday, May 1, 2025
1PM - Energy/telecommunications Meeting via Zoom Conferencing
Meeting Materials for the May 1, 2025 Energy/Telecommunications Meeting
- Draft Energy/Telecommunication April 17, 2025 Meeting Minutes
- Docket No. 528 (Tarpon Towers III/Verizon/Andover) - Draft Findings of Fact
- Docket No. 528 (Tarpon Towers III/Verizon/Andover) - Draft Opinion
- Docket No. 528 (Tarpon Towers III/Verizon/Andover) - Draft Decision and Order
- Docket No. 533 (Tarpon Towers III/Verizon/Naugatuck) - AT&T Request for Intervenor Status
- Docket No. 533 (Tarpon Towers III/Verizon/Naugatuck) - T-Mobile Request for Intervenor Status
- Docket No. 534 (The Towers/Woodstock Ave West/Woodstock) - Completeness Review and Schedule
- Docket No. 535 (The Towers/Norwich Worcester Tnpk./Woodstock) - Completeness Review and Schedule
- Petition No. 1558 (Community Power Group LLC/Ellington) - Draft D&M Staff Report
- Tower Share Request Consent Calendar
Thursday, May 8, 2025
DOCKET NO. 531– Arx Wireless Infrastructure, LLC and New Cingular Wireless PCS, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at 62 and 64 Pershing Drive, Ansonia, Connecticut.
2PM/6:30PM - Public Hearing/Public Comment Session
HEARING INFORMATION
May 8, 2025 Hearing Documents, 02/21/25
1. Instructions for Public Access to Remote Public Hearing
2. Public Hearing Notice
3. Hearing Program
4. Citizens Guide to Siting Council Procedures; and
5. Proposed Facility Site Plan
Wednesday, May 14, 2025
DOCKET NO. 532 – LSE Serpens LLC (Lodestar Energy) application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a 3.0-megawatt-AC solar photovoltaic electric generating facility and associated equipment on 13 parcels located south of West Hill Road (Parcel Nos. 253/003/018; 253/003/033 through 043 and 053-003-045), Torrington, Connecticut and associated electrical interconnection.
11AM - Pre-Hearing Conference
Thursday, May 15, 2025
1PM - Energy/telecommunications Meeting via Zoom Conferencing
Meeting Materials for the May 15, 2025 Energy/Telecommunications Meeting
- Draft Energy/Telecommunications May 1, 2025 Meeting Minutes
- Docket No. 492 (Gravel Pit Solar/South Windsor) - Motion to Reopen and Modify Based on Changed Conditions
- Docket No. 529 (Homeland/Verizon/Haddam) - Draft Findings of Fact
- Docket No. 536 (Tarpon Towers/Verizon/Norfolk) - Completeness Review and Schedule
- Docket No. 537 (The Towers/Stonington) - Completeness Review and Schedule
- Petition No. 1651 (Fairy Lake/Salem) - Draft Staff Report
- Petition No. 1659 (Verizon/Mansfield) - Draft Staff Report
- Tower Share Request Consent Calendar
Tuesday, May 20, 2025
DOCKET NO. 530 – Homeland Towers, LLC and Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at 196 East Haddam-Colchester Turnpike, East Haddam, Connecticut.
2PM - Continued Evidentiary Hearing
Council May 20, 2025 Continuation of the Evidentiary Hearing Memorandum, 04/25/25
1. Instructions for Access to the May 20, 2025 Evidentiary Hearing Session
2. Hearing Program
Thursday, May 22, 2025
DOCKET NO. 533 – Tarpon Towers III, LLC and Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at 161 Conrad Street, Naugatuck, Connecticut.
2PM/6:30PM - Public Hearing/Public Comment Session
HEARING INFORMATION
May 22, 2025 Hearing Documents, 04/04/25
1. Instructions for Public Access to Remote Public Hearing
2. Public Hearing Notice
3. Hearing Program
4. Citizens Guide to Siting Council Procedures; and
5. Proposed Facility Site Plan
Monday, May 26, 2025
OFFICE CLOSED - Memorial Day
Thursday, May 29, 2025
1PM - Energy/telecommunications Meeting via Zoom Conferencing
Meeting Materials for the May 29, 2025 Energy/Telecommunications Meeting
- Draft Energy/Telecommunications May 15, 2025 Meeting Minutes
- Docket No. 492A (Gravel Pit Solar/East Windsor) - Completeness Review and Schedule
- Docket No. 492A (Gravel Pit Solar/East Windsor) - Town of East Windsor Request for Party Status
- Docket No. 519 (The Towers/East Windsor) - Draft D&M Plan Staff Report
- Docket No. 529 (Homeland Towers/Verizon/Haddam) - Draft Findings of Fact
- Docket No. 529 (Homeland Towers/Verizon/Haddam) - Draft Opinion
- Docket No. 529 (Homeland Towers/Verizon/Haddam) - Draft Decision and Order
- Docket No. 532 (Lodestar/Torrington) - City of Torrington Request for Party Status
- Docket No. 538 (The Towers/Lebanon) - Completeness Review and Schedule
- Docket No. 539 (The Towers/Mansfield) - Completeness Review and Schedule
- Petition No. 1406A (Doosan Fuel Cell/Bridgeport) - Draft D&M Plan Staff Report
- Petition No. 1647 (East Point Energy/Oxford) - Draft Staff Report
- Petition No. 1653 (East Point Energy/Middletown) - Draft Staff Report
- Tower Share Request Consent Calendar
JUNE 2025
Thursday, June 5, 2025
DOCKET NO. 532 – LSE Serpens LLC (Lodestar Energy) application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a 3.0-megawatt-AC solar photovoltaic electric generating facility and associated equipment on 13 parcels located south of West Hill Road (Parcel Nos. 253/003/018; 253/003/033 through 043 and 053-003-045), Torrington, Connecticut and associated electrical interconnection.
2PM/6:30PM - Public Hearing/Public Comment Session
June 5, 2025 Hearing Documents, 04/17/25
1. Instructions for Public Access to Remote Public Hearing
2. Public Hearing Notice
3. Hearing Program
4. Citizens Guide to Siting Council Procedures; and
5. Proposed Facility Site Plan
Wednesday, June 11, 2025
DOCKET NO. 534 – The Towers, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at 90 Woodstock Avenue West (Route 171), Woodstock, Connecticut.
11 AM - Pre-Hearing Conference
Thursday, June 12, 2025
1PM - Energy/telecommunications Meeting via Zoom Conferencing
Meeting Materials for the June 12, 2025 Energy/Telecommunications Meeting
- Draft Energy/Telecommunications May 29, 2025 Meeting Minutes
- Docket No. 516R (UI/Fairfield to Congress Railroad Transmission Line 115-kV Rebuild Project) - Draft Remand Findings of Fact
- Docket No. 525 (Greenskies/Stonington) - Draft D&M Plan Staff Report
- Petition No. 1463A (CF Mulnite/East Windsor) - Draft D&M Plan Staff Report
- Petition No. 1611 (Lodestar/Enfield) - Draft D&M Plan Staff Report
- Tower Share Request Consent Calendar
Thursday, June 19, 2025
OFFICE CLOSED –Juneteenth
Wednesday, June 25, 2025
DOCKET NO. 535 – The Towers, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at 835 Norwich Worcester Turnpike (Route 169), Woodstock, Connecticut.
11AM - Pre-Hearing Conference
Thursday, June 26, 2025
1PM - Energy/telecommunications Meeting via Zoom Conferencing
Meeting Materials for the June 26, 2025 Energy/Telecommunications Meeting
- Draft Energy/Telecommunications June 12, 2025 Meeting Minutes
- Docket No. 516R (UI/Fairfield to Congress Railroad Transmission Line 115-kV Rebuild Project) - UI Motion to Stay
- Docket No. 531 (Arx Wireless/Ansonia) - Draft Findings of Fact
- Docket No. 540 (The Towers/New Milford) - Completeness Review and Draft Schedule
- Petition No. 1655 (Borelli Solar/East Haven) - Draft Findings of Fact
- Petition No. 1662 (ATT/Hebron) - Draft Staff Report
- Petition No. 1668 (Johnson Controls/Ansonia) - HyAxiom, Inc. Request for Intervenor Status
- Tower Share Request Consent Calendar
JULY 2025
Friday, July 4, 2025
OFFICE CLOSED –Independence Day
Thursday, July 10, 2025*CANCELED*
1PM - Energy/telecommunications Meeting via Zoom Conferencing
(This meeting has been canceled.)
Wednesday, July 16, 2025
DOCKET NO. 536 – Tarpon Towers III, LLC and Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at 78 Goshen East Street, Norfolk, Connecticut.
11:30AM - Pre-Hearing Conference
Thursday, July 17, 2025
DOCKET NO. 534 – The Towers, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at 90 Woodstock Avenue West (Route 171), Woodstock, Connecticut.
2PM/6:30PM - Public Hearing/Public Comment Session
HEARING INFORMATION
July 17, 2025 Hearing Documents, 05/02/25
1. Instructions for Public Access to Remote Public Hearing
2. Public Hearing Notice
3. Hearing Program
4. Citizens Guide to Siting Council Procedures; and
5. Proposed Facility Site Plan
Hearing Procedures and Pre-Hearing Conference Memorandum, 06/04/25
Tuesday, July 22, 2025
DOCKET NO. 532 – LSE Serpens LLC (Lodestar Energy) application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a 3.0-megawatt-AC solar photovoltaic electric generating facility and associated equipment on 13 parcels located south of West Hill Road (Parcel Nos. 253/003/018; 253/003/033 through 043 and 053-003-045), Torrington, Connecticut and associated electrical interconnection.
2PM - Continued Evidentiary Hearing
Council July 22, 2025 Continuation of the Evidentiary Hearing Memorandum, 06/09/25
1. Instructions for Access to the July 22, 2025 Evidentiary Hearing Session
2. Hearing Program
Wednesday, July 23, 2025
DOCKET NO. 537 – The Towers, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at 327 North Anguilla Road, Stonington, Connecticut.
11AM - Pre-Hearing Conference
Thursday, July 24, 2025
1PM - Energy/telecommunications Meeting via Zoom Conferencing
Meeting Materials for the July 24, 2025 Energy/Telecommunications Meeting
- Draft Energy/Telecommunications June 26, 2025 Meeting Minutes
- Docket No. 529 (Homeland Towers/Haddam) - Draft D&M Plan Staff Report
- Docket No. 531 (Arx Wireless/AT&T/Ansonia) - Draft Findings of Fact
- Docket No. 531 (Arx Wireless/AT&T/Ansonia) - Draft Opinion
- Docket No. 531 (Arx Wireless/AT&T/Ansonia) - Draft Decision and Order
- Docket No. 533 (Tarpon Towers/Verizon/Naugatuck) - Draft Findings of Fact
- Docket No. 541 (The Towers/Windham) - Complete Review and Draft Schedule
- Petition No. 1278C (Bloom/North Haven) - Draft Staff Report
- Petition No. 1607 (Hanwha Q Cells America, Inc./New London) - Motion to Reopen
- Petition No. 1655 (Borrelli Solar/East Haven) - Draft Findings of Fact
- Petition No. 1655 (Borrelli Solar/East Haven) - Draft Opinion
- Petition No. 1655 (Borrelli Solar/East Haven) - Draft Decision and Order
- Petition No. 1658 (VFS/Storrs) - Draft Staff Report
Wednesday, July 30, 2025
DOCKET NO. 538 – The Towers, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at 1022 Trumbull Highway, Lebanon, Connecticut.
11AM - Pre-Hearing Conference
Thursday, July 31, 2025
DOCKET NO. 535 – The Towers, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at 835 Norwich Worcester Turnpike (Route 169), Woodstock, Connecticut.
2PM/6:30PM - Public Hearing/Public Comment Session
July 31, 2025 Hearing Documents, 05/02/25
1.Instructions for Public Access to Remote Public Hearing
2.Public Hearing Notice
3.Hearing Program
4. Citizens Guide to Siting Council Procedures; and
5. Proposed Facility Site Plan
AUGUST 2025
Thursday, August 7, 2025
1PM - Energy/telecommunications Meeting via Zoom Conferencing
Meeting Materials for the August 7, 2025 Energy/Telecommunications Meeting
- Draft Energy/Telecommunications July 24, 2025 Meeting Minutes
- Docket No. 533 (Tarpon Towers/Verizon/Naugatuck) - Draft Findings of Fact
- Docket No. 533 (Tarpon Towers/Verizon/Naugatuck) - Draft Opinion
- Docket No. 533 (Tarpon Towers/Verizon/Naugatuck) - Draft Decision and Order
- Docket No. 542 (The Towers/Stonington/Mystic) - Completeness Review and Draft Schedule
- Petition No. 1589R (USS Somers Solar/Ellington) - Motion to Reopen
- Petition No. 1654 (Tunnel BESS/Preston) - Draft Staff Report
- Petition No. 1657 (East Point Energy/West Haven) - Motion for Protective Order - Response to Council Interrogatory No. 15 – Lease Agreement Financial Terms
- Petition No. 1657 (East Point Energy/West Haven) - Draft Staff Report
- Petition No. 1667 (Verizon/Enfield) - Draft Staff Report
- Tower Share Request Consent Calendar
Thursday, August 14, 2025
DOCKET NO. 536 – Tarpon Towers III, LLC and Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at 78 Goshen East Street, Norfolk, Connecticut.
2PM/6:30PM - Public Hearing/Public Comment Session
HEARING INFORMATION
August 14, 2025 Hearing Documents, 05/16/25
1. Instructions for Public Access to Remote Public Hearing
2. Public Hearing Notice
3. Hearing Program
4. Citizens Guide to Siting Council Procedures; and
5. Proposed Facility Site Plan
Wednesday, August 20, 2025
DOCKET NO. 539 – The Towers, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at 424 Storrs Road, Mansfield, Connecticut.
11AM - Pre-Hearing Conference
Thursday, August 21, 2025
1PM - Energy/telecommunications Meeting via Zoom Conferencing
Meeting Materials for the August 21, 2025 Energy/Telecommunications Meeting
- Draft Energy/Telecommunications August 7, 2025 Meeting Minutes
- Docket No. 531 (Arx Wireless/Ansonia) - Draft D&M Plan Staff Report
- Docket No. 543 (The Towers/Washington) - Completeness Review and Draft Schedule
- Petition No. 1627R (LSE Libra/Hamden) - Draft Remand Staff Report
- Petition No. 1656 (Eversource/South Naugatuck Substation to Beacon Falls Junction Rebuild Project) - Draft Staff Report
- Petition No. 1663 (VFS/Hamden) - Draft Staff Report
- Petition No. 1664 (VFS/North Haven) - Draft Staff Report
- Petition No. 1666 (VFS/Hamden) - Draft Staff Report
- Petition No. 1668 (Johnson Controls/Ansonia) - HyAxiom Motion to Dismiss and/or Deny Petition
- Petition No. 1668 (Johnson Controls/Ansonia) - Draft Staff Report on HyAxiom Motion to Dismiss and/or Deny Petition
- Tower Share Request Consent Calendar
Wednesday, August 27, 2025
DOCKET NO. 540– The Towers, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at 68 Danbury Road, New Milford, Connecticut.
11AM - Pre-Hearing Conference
Thursday, August 28, 2025
DOCKET NO. 537 – The Towers, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at 327 North Anguilla Road, Stonington, Connecticut.
2PM/6:30PM - Public Hearing/Public Comment Session
August 28, 2025 Hearing Documents, 05/16/25
1. Instructions for Public Access to Remote Public Hearing
2. Hearing Notice
3. Hearing Program
4. Citizens Guide to Siting Council Procedures; and
5. Proposed Facility Site Plan
SEPTEMBER 2025
Monday, September 1, 2025
OFFICE CLOSED –Labor Day
Thursday, September 4, 2025
1PM - Energy/telecommunications Meeting via Zoom Conferencing
Meeting Materials for the September 4, 2025 Energy/Telecommunications Meeting
- Draft Energy/Telecommunications August 21, 2025 Meeting Minutes
- Docket No. 492A (Gravel Pit Solar/East Windsor) - East Windsor Residents for Responsible Solar Request for Intervenor Status
- Docket No. 492A (Gravel Pit Solar/East Windsor) - Nicole Paradise Request for Intervenor Status
- Docket No. 492A (Gravel Pit Solar/East Windsor) - Julia Riordan Request for Party Status
- Docket No. 516R (UI/Fairfield to Congress Railroad Transmission Line Rebuild Project) - Draft Remand Findings of Fact
- Docket No. 524 (Greenskies/Woodbury) - Draft Partial D&M Plan Staff Report
- Docket No. 534 (The Towers/Woodstock) - Draft Findings of Fact
- Petition No. 1661 (Eversource/Stamford Underground Cable Modernization Project) - Draft Staff Report
- Tower Share Request Consent Calendar
Tuesday, September 9, 2025
DOCKET NO. 535 – The Towers, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at 835 Norwich Worcester Turnpike (Route 169), Woodstock, Connecticut.
2PM - Continued Evidentiary Hearing
Council September 9, 2025 Evidentiary Hearing Continuation Memorandum, 07/31/25
1. Instructions for Public Access to Remote Public Hearing
2. Hearing Program
Wednesday, September 10, 2025
DOCKET NO. 492A– Gravel Pit Solar Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a 120-megawatt-AC solar photovoltaic electric generating facility on eight parcels generally located to the east and west of the Amtrak and Connecticut Rail Line, south of Apothecaries Hall Road and north of the South Windsor town boundary in East Windsor, Connecticut and associated electrical inter-connection. Reopening of this Certificate based on changed conditions pursuant to Connecticut General Statutes §4-181a(b). Link to DOCKET NO. 492
11AM - Pre-Hearing Conference
Thursday, September 11, 2025
DOCKET NO. 538 – The Towers, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at 1022 Trumbull Highway, Lebanon, Connecticut.
2PM/6:30PM - Public Hearing/Public Comment Session
HEARING INFORMATION
September 11, 2025 Hearing Documents, 05/30/25
1. Instructions for Public Access to Remote Public Hearing
2. Hearing Notice
3 Hearing Program
4. Citizens Guide to Siting Council Procedures; and
5. Proposed Facility Site Plan
Wednesday, September 17, 2025
DOCKET NO. 541 – The Towers, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at 132 Bass Road, Windham, Connecticut.
11AM - Pre-Hearing Conference
Thursday, September 18, 2025
1PM - Energy/telecommunications Meeting via Zoom Conferencing
Meeting Materials for the September 18, 2025 Energy/Telecommunications Meeting
- Draft Energy/Telecommunications September 4, 2025 Meeting Minutes
- DO492A (Gravel Pit Solar/East Windsor) - Paula Stolinas Request for Party Status
- DO492A (Gravel Pit Solar/East Windsor) - Julie Traczyk Request for Intervenor Status
- DO492A (Gravel Pit Solar/East Windsor) - Amanda Berube Request for Intervenor Status
- DO516R (UI/Fairfield to Congress Railroad Transmission Line Rebuild Project) - Draft Remand Findings of Fact
- DO516R (UI/Fairfield to Congress Railroad Transmission Line Rebuild Project) - Draft Remand Opinion
- DO516R (UI/Fairfield to Congress Railroad Transmission Line Rebuild Project) - Draft Remand Decision and Order
- DO516R (UI/Fairfield to Congress Railroad Transmission Line Rebuild Project) - Draft Remand Conclusions of Law
- DO530 (Homeland Towers/Verizon/East Haddam) - Draft Findings of Fact
- DO534 (The Towers/Woodstock) - Draft Findings of Fact
- DO534 (The Towers/Woodstock) - Draft Opinion
- DO534 (The Towers/Woodstock) - Draft Decision & Order
- DO538 (The Towers/Lebanon) - Philip Griffin Request for Party Status
- DO538 (The Towers/Lebanon) - Lesley Varszegi Request for Party Status
- Petition No. 1660 (TA Solar 335 LLC/Naugatuck) - Draft Staff Report
- Petition No. 1670 (Verizon/New Haven) - Draft Staff Report
- Tower Share Request Consent Calendar
Thursday, September 25, 2025
DOCKET NO. 539 – The Towers, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at 424 Storrs Road, Mansfield, Connecticut.
2PM/6:30PM - Public Hearing/Public Comment Session
HEARING INFORMATION
September 25, 2025 Hearing Documents, 05/30/25
1. Instructions for Public Access to Remote Public Hearing
2. Hearing Notice
3. Hearing Program
4. Citizens Guide to Siting Council Procedures; and
5. Proposed Facility Site Plan
OCTOBER 2025
Wednesday, October 1, 2025
DOCKET NO. 542 – The Towers, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at Parcel No. 151-1-1, Pequotsepos Road, Stonington (Mystic), Connecticut.
11AM - Pre-Hearing Conference
Thursday, October 2, 2025
1PM - Energy/telecommunications Meeting via Zoom Conferencing
Meeting Materials for the October 2, 2025 Energy/Telecommunications Meeting
- Draft Energy/Telecommunications September 18, 2025 Meeting Minutes
- Docket No. 492A (Gravel Pit Solar/East Windsor) - Douglas King Request for Party Status
- Docket No. 530 (Homeland Towers/Verizon/East Haddam) - Draft Findings of Fact
- Docket No. 530 (Homeland Towers/Verizon/East Haddam) - Draft Opinion
- Docket No. 530 (Homeland Towers/Verizon/East Haddam) - Draft Decision and Order
- Docket No. 530 (Homeland/Towers/Verizon/East Haddam) - Applicants' Objection to Submission of Stephen and Cindyann Longobardi Post-Hearing Brief, 09/25/25
- Docket No. 538 (The Towers, LLC/Lebanon) - Roy Motion to Dismiss/Motion for Stay of Proceeding
- Docket No. 538 (The Towers, LLC/Lebanon) - Applicant's Response to Motion to Dismiss/Motion for Stay of Proceeding
- Docket No. 538 (The Towers, LLC/Lebanon) - Draft Staff Report on Roy Motion to Dismiss/Motion for Stay of Proceeding
- Petition No. 1395B (Windham Solar LLC/Ansonia) - Draft Staff Report
- Petition No. 1669 (VFS, LLC/Bridgeport) - Draft Staff Report
- Petition No. 1671 (TRITEC Energy Development, LLC/Salem ) - Motion for Protective Order
Petition No. 1671 (TRITEC Energy Development, LLC/Salem) - Draft Staff Report - Petition No. 1676 (Homestead Fuel Cell 1, LLC/Hartford) - Motion for Protective Order - Response to Council Interrogatory No. 3 - Cost Information
- Petition No. 1688 (Greenskies Clean Energy, LLC/Manchester) - Request for Hearing
- Tower Share Request Consent Calendar
Thursday, October 9, 2025
DOCKET NO. 492A – Gravel Pit Solar Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a 120-megawatt-AC solar photovoltaic electric generating facility on eight parcels generally located to the east and west of the Amtrak and Connecticut Rail Line, south of Apothecaries Hall Road and north of the South Windsor town boundary in East Windsor, Connecticut and associated electrical inter-connection. Reopening of this Certificate based on changed conditions pursuant to Connecticut General Statutes §4-181a(b). Link to DOCKET NO. 492
2PM/6:30PM - Public Hearing/Public Comment Session
HEARING INFORMATION
October 9, 2025 Hearing Documents, 05/30/25
1. Instruction for Public Access to Remote Public Hearing
2. Public Hearing Notice
3. Hearing Program
4. Proposed Expansion Site Plan
Zoom Remote Public Hearing Recording, 10/09/25 (Passcode: t&6KDr5^ )
Monday, October 13, 2025
OFFICE CLOSED –Columbus Day
Thursday, October 16, 2025
1PM - Energy/telecommunications Meeting via Zoom Conferencing
Meeting Materials for the October 16, 2025 Energy/Telecommunications Meeting
- Draft Energy/Telecommunications October 2, 2025 Meeting Minutes
- Docket No. 516R (UI/Fairfield to Congress Railroad Transmission Line Rebuild Project) - Draft Remand Findings of Fact
- Docket No. 516R (UI/Fairfield to Congress Railroad Transmission Line Rebuild Project) - Draft Remand Opinion
- Docket No. 516R (UI/Fairfield to Congress Railroad Transmission Line Rebuild Project) - Draft Remand Decision and Order
- Docket No. 516R (UI/Fairfield to Congress Railroad Transmission Line Rebuild Project) - Draft Remand Conclusions of Law
- Docket No. 516R (UI/Fairfield to Congress Railroad Trans mission Line Rebuild Project) - Town of Fairfield, City of Bridgeport and SCNET Group Joint Request for 6-month Extension of Time or to Deny the Application,10/15/25
- Docket No. 516R (UI/Fairfield to Congress Railroad Transmission Line Rebuild Project) - UI Objection to Joint Request for 6-month Extension of Time, 10/16/25
- Docket No. 536 (Tarpon Towers III/Verizon/Norfolk) - Draft Findings of Fact
- Petition No. 1665 (TRITEC/Old Saybrook) - Draft Staff Report
- Petition No. 1673 (Verizon/AT&T/T-Mobile/Burlington) - Draft Staff Report
- Petition No. 1677 (Verizon/Killingworth) - Draft Staff Report
- Petition No. 1688 (Greenskies/Manchester) - Draft Completeness Review and Schedule
- Tower Share Request Consent Calendar
Thursday, October 23, 2025
DOCKET NO. 540– The Towers, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at 68 Danbury Road, New Milford, Connecticut.
2PM/6:30PM - Public Hearing/Public Comment Session
HEARING INFORMATION
October 23, 2025 Hearing Documents, 06/26/25
1. Instructions for Public Access to Remote Public Hearing
2. Hearing Notice
3. Hearing Program
4. Citizens Guide to Siting Council Procedures; and
5. Proposed Facility Site Plan
Wednesday, October 29, 2025
DOCKET NO. 543– The Towers, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at 17 Warren Road, Washington (New Preston), Connecticut.
11AM - Pre-Hearing Conference
Thursday, October 30, 2025
1PM - Energy/telecommunications Meeting via Zoom Conferencing
Meeting Materials for the October 30, 2025 Energy/Telecommunications Meeting
- Draft Energy/Telecommunications October 16, 2025 Meeting Minutes
- Forecast 2025 - Draft Schedule
- Docket No. 495A/PE1470 (Verizon/Fairfield) - Draft Request to Modify Notice of Enforcement Action Staff Report
- Docket No. 536 (Tarpon Towers/Verizon/Norfolk) - Draft Findings of Fact
- Docket No. 536 (Tarpon Towers/Verizon/Norfolk) - Draft Opinion
- Docket No. 536 (Tarpon Towers/Verizon/Norfolk) - Draft Decision and Order
- Docket No. 537 (The Towers/Stonington) - Draft Findings of Fact
- Docket No. 544 (Arx Wireless/Norwich) - Draft Completeness Review and Schedule
- Petition No. 1595 (HyAxiom/Ansonia) - City of Ansonia Motion to Reopen and Reverse Declaratory Ruling
- Petition No. 1595 (HyAxiom/Ansonia) - City of Ansonia City of Ansonia Request for Party Status
- Petition No. 1595 (AyAxiom/Ansonia) - HyAxiom Inc. Response to City of Ansonia Motion to Reopen and Reverse Declaratory Ruling
- Petition No. 1595 (HyAxiom/Ansonia) - HyAxiom, Inc. Response to City of Ansonia Request for Party Status, 10/23/25
- Petition No. 1668 (Ansonia) - Draft Staff Report
- Petition No. 1671 (TRITEC/Salem) - Motion for Clarification on Declaratory Ruling Condition Nos. 8 and 9
- Petition No. 1689 (Verizon/Fairfield) - Draft Staff Report
- Petition No. 1690 (Eversource/Haddam Substation to East Haddam Junction Line Rebuild Project) - Connecticut River Gateway Commission, Inc. Request for Intervenor/CEPA Intervenor Status and Request for Hearing
- Proposed Fiscal Year 2027 Revised Budget - Memo
- Tower Share Request Consent Calendar
NOVEMBER 2025
Thursday, November 6, 2025
DOCKET NO. 541 – The Towers, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at 132 Bass Road, Windham, Connecticut.
2PM/6:30PM - Public Hearing/Public Comment Session
HEARING INFORMATION
November 6, 2025 Hearing Documents, 07/25/25
1. Instructions for Public Access to Remote Public Hearing
2. Hearing Notice
3. Hearing Program
4. Citizens Guide to Siting Council Procedures; and
5. Proposed Facility Site Plan
Tuesday, November 11, 2025
OFFICE CLOSED –Veterans Day
Thursday, November 13, 2025
1PM - Energy/telecommunications Meeting via Zoom Conferencing
Meeting Materials for the November 13, 2025 Energy/Telecommunications Meeting
- Draft Energy/Telecommunications October 30, 2025 Meeting Minutes
- Docket No. 537 (The Towers/Stonington) - Draft Findings of Fact
- Docket No. 537 (The Towers/Stonington) - Draft Opinion
- Docket No. 537 (The Towers/Stonington) - Draft Decision and Order
- Docket No. 542 (The Towers/Stonington(Mystic)) - Town of Stonington Request for Party Status and CEPA Intervenor Status
- Docket No. 543 (The Towers/Washington(New Preston)) - Town of Washington Request for Party Status
- Docket No. 543 (The Towers/Washington(New Preston)) - Steep Rock Association, Inc. Request for CEPA Intervenor Status
- Docket No. 543 (The Towers/Washington(New Preston)) - Town of Warren Request for Party Status
- Docket No. 545 (Arx Wireless/AT&T/East Lyme) - Completeness Review and Draft Schedule
- Docket No. 546 (Crown Castle/AT&T/North Haven) - Completeness Review and Draft Schedule
- Petition No. 1164A (Verizon/Stonington(Mystic)) - Draft Staff Report
- Petition No. 1607A (Hanwha Q. Cells American/New London) - Draft Staff Report
- Petition No. 1645A (VCP/Mansfield) - Draft Staff Report
- Petition No. 1672(Eversource/Portland Substation to Hopewell Substation Rebuild Project) - Draft Staff Report
- Tower Share Consent Calendar
Tuesday, November 18, 2025
DOCKET NO. 492A – Gravel Pit Solar Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a 120-megawatt-AC solar photovoltaic electric generating facility on eight parcels generally located to the east and west of the Amtrak and Connecticut Rail Line, south of Apothecaries Hall Road and north of the South Windsor town boundary in East Windsor, Connecticut and associated electrical inter-connection. Reopening of this Certificate based on changed conditions pursuant to Connecticut General Statutes §4-181a(b). Link to DOCKET NO. 492
2PM - Continued Evidentiary Hearing
HEARING INFORMATION
Council November 18, 2025 Continuation of Evidentiary Hearing Memorandum, 10/10/25
1. Instructions for Access to November 18, 2025 Evidentiary Hearing Session
2. Hearing Program
Thursday, November 20, 2025
DOCKET NO. 516R – The United Illuminating Company (UI) application for a Certificate of Environmental Compatibility and Public Need for the Fairfield to Congress Railroad Transmission Line 115-kV Rebuild Project that consists of the relocation and rebuild of its existing 115- kilovolt (kV) electric transmission lines from the railroad catenary structures to new steel monopole structures and related modifications along approximately 7.3 miles of the Connecticut Department of Transportation’s Metro-North Railroad corridor between Structure B648S located east of Sasco Creek in Fairfield and UI’s Congress Street Substation in Bridgeport, and the rebuild of two existing 115-kV transmission lines along 0.23 mile of existing UI right-of-way to facilitate interconnection of the rebuilt 115-kV electric transmission lines at UI’s existing Ash Creek, Resco, Pequonnock and Congress Street Substations traversing the municipalities of Bridgeport and Fairfield, Connecticut. Court-ordered Remand Regarding Connecticut Siting Council’s February 15, 2024 Final Decision pursuant to Connecticut General Statutes §4-183(j). UI Petition for Reconsideration.
2 PM - Special Meeting
November 20, 2025 Special Meeting Materials
- Council Docket No. 516R Final Decision Documents, 10/17/25
- The United Illuminating Company Docket No. 516R Petition for Reconsideration, 11/03/25
- The United Illuminating Company Docket No. 516R Request for a Special Meeting, 11/18/25
Thursday, November 27, 2025
OFFICE CLOSED –Thanksgiving Day