Due to the personally identifying information contained in written limited appearance statements from the public, any written limited appearance statements that are received by the Council for any matter are available to be viewed at the Council’s office Monday through Friday from 8:30 a.m. to 4:30 p.m. or available to be sent via e-mail upon request. Please allow adequate time for processing.

Please be advised that the Connecticut Siting Council will not be accepting any hard copy filings for any matter after 12 PM on Wednesday, December 24, 2025. Regular file processing will resume at 8:30 AM on Friday, December 26, 2025. Thank you for your consideration.

JANUARY 2025

 

Wednesday, January 1, 2025

OFFICE CLOSED - New Years Day

Wednesday, January 8, 2025

PETITION NO. 1592A – Santa Fuel, Inc. petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 3.85-megawatt AC solar photovoltaic electric generating facility located at 159 South Road, Somers, Connecticut, and associated electrical interconnection. Reopening of this petition based on changed conditions pursuant to Connecticut General Statutes §4-181a(b). Reopening of this petition based on changed conditions pursuant to Connecticut General Statutes §4-181a(b).

11AM - Pre-Hearing Conference

 

Thursday, January 9, 2025

1PM - Energy/telecommunications Meeting via Zoom Conferencing

Meeting Materials for the January 9, 2025 Energy/Telecommunications Meeting

 

Thursday, January 16, 2025

PETITION NO. 1643 – C-Tec Solar, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 2.95-megawatt AC solar photovoltaic electric generating facility and associated equipment to be located at 77 Pompeo Road, Thompson, Connecticut, and associated electrical interconnection.

2PM/6:30PM - Public Hearing/Public Comment Session

HEARING INFORMATION
January 16, 2025 Hearing Documents,11/08/24
1. Instructions for Public Access to Remote Public Hearing
2. Public Hearing Notice
3. Hearing Program
4. Citizens Guide to Siting Council Procedures; and
5. Proposed Facility Site Plan
Zoom Remote Public Hearing Recording, 01/16/25 (Passcode: b!3RC=h#)


Monday, January 20, 2025

OFFICE CLOSED - Martin Luther King Jr. Day

 

Wednesday, January 22, 2025

DOCKET NO. 528 – Tarpon Towers III, LLC and Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at 746 East Street, Andover, Connecticut.

11AM - Pre-Hearing Conference

 

Thursday, January 23, 2025

1PM - Energy/telecommunications Meeting via Zoom Conferencing

Meeting Materials for the January 23, 2025 Energy/Telecommunications Meeting

 

Thursday, January 30, 2025

PETITION NO. 1592A– Santa Fuel, Inc. petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 3.85-megawatt AC solar photovoltaic electric generating facility located at 159 South Road, Somers, Connecticut, and associated electrical interconnection. Reopening of this petition based on changed conditions pursuant to Connecticut General Statutes §4-181a(b). 

2PM/6:30PM - Public Hearing/Public Comment Session

HEARING INFORMATION
January 30, 2025 Hearing Documents, 11/22/24
1. Instructions for Public Access to Remote Public Hearing
2. Public Hearing Notice
3. Hearing Program
4. Citizens Guide to Siting Council Procedures; and
5. Proposed Facility Site Plan
Zoom Remote Public Hearing Recording, 01/30/25 (Passcode: 93xz1D*G)

FEBRUARY 2025

Thursday, February 6, 2025

1PM - Energy/telecommunications Meeting via Zoom Conferencing

Meeting Materials for the February 6, 2025 Energy/Telecommunications Meeting

Wednesday, February 12, 2025

OFFICE CLOSED - Lincoln's Birthday

Thursday, February 13, 2025

DOCKET NO. 528 – Tarpon Towers III, LLC and Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at 746 East Street, Andover, Connecticut.

2PM/6:30PM - Public Hearing/Public Comment Session

HEARING INFORMATION
February 13, 2025 Hearing Documents, 01/10/24
1.  Instructions for Public Access to Remote Public Hearing
2.  Public Hearing Notice
3.  Hearing Program 
4.  Citizens Guide to Siting Council Procedures; and
5.  Proposed Facility Site Plan 

Monday, February 17, 2025

OFFICE CLOSED - Washington's Birthday

Wednesday, February 19, 2025

DOCKET NO. 529– Homeland Towers, LLC and Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at Parcel No. 65-002-1, Old Chester Road North, Haddam, Connecticut.

11AM - Pre-Hearing Conference

 

Thursday, February 20, 2025

1PM - Energy/telecommunications Meeting via Zoom Conferencing

Meeting Materials for the February 20, 2025 Energy/Telecommunications Meeting

MARCH 2025

Thursday, March 6, 2025

1PM - Energy/telecommunications Meeting via Zoom Conferencing

Meeting Materials for the March 6, 2025 Energy/Telecommunications Meeting


Wednesday, March 12, 2025

DOCKET NO. 470C - NTE Connecticut, LLC Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a 650-megawatt dual-fuel combined cycle electric generating facility and associated electrical interconnection switchyard located at 180 and 189 Lake Road, Killingly, Connecticut. Reopening of this Certificate based on changed conditions specifically limited to the status of the existing Certificate, pursuant to Connecticut General Statutes §4-181a(b).  Link to DOCKET NO. 470B 

11AM - Pre-Hearing Conference

 

Thursday, March 13, 2025

DOCKET NO. 529– Homeland Towers, LLC and Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at Parcel No. 65-002-1, Old Chester Road North, Haddam, Connecticut.

2PM/6:30PM - Public Hearing/Public Comment Session

HEARING INFORMATION
March 13, 2025 Hearing Documents, 02/07/25
1.  Instructions for Public Access to Remote Public Hearing
2.  Public Hearing Notice
3.  Hearing Program
4.  Citizens Guide to Siting Council Procedures; and
5.  Proposed Facility Site Plan

 

Wednesday, March 19, 2025

PETITION NO. 1655 – Borrelli Solar LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 1.99-megawatt AC solar photovoltaic electric generating facility and associated equipment to be located at 179 and 197 Borrelli Road, East Haven, Connecticut, and associated electrical interconnection.

11AM - Pre-Hearing Conference

 

Thursday, March 20, 2025

1PM - Energy/telecommunications Meeting via Zoom Conferencing

Meeting Materials for the March 20, 2025 Energy/Telecommunications Meeting

 

Wednesday, March 26, 2025

DOCKET NO. 530 – Homeland Towers, LLC and Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at 196 East Haddam-Colchester Turnpike, East Haddam, Connecticut.

11AM - Pre-Hearing Conference

MARCH 2025

Thursday, March 6, 2025

1PM - Energy/telecommunications Meeting via Zoom Conferencing

Meeting Materials for the March 6, 2025 Energy/Telecommunications Meeting


Wednesday, March 12, 2025

DOCKET NO. 470C - NTE Connecticut, LLC Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a 650-megawatt dual-fuel combined cycle electric generating facility and associated electrical interconnection switchyard located at 180 and 189 Lake Road, Killingly, Connecticut. Reopening of this Certificate based on changed conditions specifically limited to the status of the existing Certificate, pursuant to Connecticut General Statutes §4-181a(b).  Link to DOCKET NO. 470B 

11AM - Pre-Hearing Conference

 

Thursday, March 13, 2025

DOCKET NO. 529– Homeland Towers, LLC and Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at Parcel No. 65-002-1, Old Chester Road North, Haddam, Connecticut.

2PM/6:30PM - Public Hearing/Public Comment Session

HEARING INFORMATION
March 13, 2025 Hearing Documents, 02/07/25
1.  Instructions for Public Access to Remote Public Hearing
2.  Public Hearing Notice
3.  Hearing Program
4.  Citizens Guide to Siting Council Procedures; and
5.  Proposed Facility Site Plan

 

Wednesday, March 19, 2025

PETITION NO. 1655 – Borrelli Solar LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 1.99-megawatt AC solar photovoltaic electric generating facility and associated equipment to be located at 179 and 197 Borrelli Road, East Haven, Connecticut, and associated electrical interconnection.

11AM - Pre-Hearing Conference

 

Thursday, March 20, 2025

1PM - Energy/telecommunications Meeting via Zoom Conferencing

Meeting Materials for the March 20, 2025 Energy/Telecommunications Meeting

 

Wednesday, March 26, 2025

DOCKET NO. 530 – Homeland Towers, LLC and Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at 196 East Haddam-Colchester Turnpike, East Haddam, Connecticut.

11AM - Pre-Hearing Conference

APRIL 2025


Tuesday, April 1, 2025

DOCKET NO. 470C - NTE Connecticut, LLC Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a 650-megawatt dual-fuel combined cycle electric generating facility and associated electrical interconnection switchyard located at 180 and 189 Lake Road, Killingly, Connecticut. Reopening of this Certificate based on changed conditions specifically limited to the status of the existing Certificate, pursuant to Connecticut General Statutes §4-181a(b).  Link to DOCKET NO. 470B 

2PM/6:30PM - Public Hearing/Public Comment Session

HEARING INFORMATION
April 1, 2025 Hearing Documents, 02/21/25
1. Instructions for Public Access to Remote Public Hearing
2. Public Hearing Notice
3. Hearing Program

 

Thursday, April 3, 2025

1PM - Energy/telecommunications Meeting via Zoom Conferencing

Meeting Materials for the April 3, 2025 Energy/Telecommunications Meeting

 

Thursday, April 10, 2025

PETITION NO. 1655 – Borrelli Solar LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 1.99-megawatt AC solar photovoltaic electric generating facility and associated equipment to be located at 179 and 197 Borrelli Road, East Haven, Connecticut, and associated electrical interconnection.

2PM/6:30PM - Public Hearing/Public Comment Session

HEARING INFORMATION
April 10, 2025 Hearing Documents, 03/07/25
1. Instructions for Public Access to Remote Public Hearing
2. Public Hearing Notice
3. Hearing Program
4. Citizens Guide to Siting Council Procedures; and
5. Proposed Facility Site Plan
Zoom Remote Public Hearing Recording, 04/10/25 (Passcode: EhZGV=6q)

Wednesday, April 16, 2025

DOCKET NO. 531– Arx Wireless Infrastructure, LLC and New Cingular Wireless PCS, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at 62 and 64 Pershing Drive, Ansonia, Connecticut.

11AM - Pre-Hearing Conference

Thursday, April 17, 2025

1PM - Energy/telecommunications Meeting via Zoom Conferencing

Meeting Materials for the April 17, 2025 Energy/Telecommunications Meeting

 

Friday, April 18, 2025

OFFICE CLOSED - Good Friday

 

Thursday, April 24, 2025

DOCKET NO. 530 – Homeland Towers, LLC and Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at 196 East Haddam-Colchester Turnpike, East Haddam, Connecticut.

2PM/6:30PM - Public Hearing/Public Comment Session

HEARING INFORMATION
April 24, 2025 Hearing Documents, 02/21/25
1. Instructions for Public Access to Remote Public Hearing
2. Public Hearing Notice
3. Hearing Program 
4. Citizens Guide to Siting Council Procedures; and
5. Proposed Facility Site Plan

 

Wednesday, April 30, 2025

DOCKET NO. 533 – Tarpon Towers III, LLC and Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at 161 Conrad Street, Naugatuck, Connecticut.

11AM - Pre-Hearing Conference

MAY 2025

 

Thursday, May 1, 2025

1PM - Energy/telecommunications Meeting via Zoom Conferencing

Meeting Materials for the May 1, 2025 Energy/Telecommunications Meeting

 

Thursday, May 8, 2025

DOCKET NO. 531– Arx Wireless Infrastructure, LLC and New Cingular Wireless PCS, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at 62 and 64 Pershing Drive, Ansonia, Connecticut.

2PM/6:30PM - Public Hearing/Public Comment Session

HEARING INFORMATION
May 8, 2025 Hearing Documents, 02/21/25
1. Instructions for Public Access to Remote Public Hearing
2. Public Hearing Notice
3. Hearing Program 
4. Citizens Guide to Siting Council Procedures; and
5. Proposed Facility Site Plan 

 

Wednesday, May 14, 2025

DOCKET NO. 532 – LSE Serpens LLC (Lodestar Energy) application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a 3.0-megawatt-AC solar photovoltaic electric generating facility and associated equipment on 13 parcels located south of West Hill Road (Parcel Nos. 253/003/018; 253/003/033 through 043 and 053-003-045), Torrington, Connecticut and associated electrical interconnection.

11AM - Pre-Hearing Conference

 

Thursday, May 15, 2025

1PM - Energy/telecommunications Meeting via Zoom Conferencing

Meeting Materials for the May 15, 2025 Energy/Telecommunications Meeting

Tuesday, May 20, 2025

DOCKET NO. 530 – Homeland Towers, LLC and Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at 196 East Haddam-Colchester Turnpike, East Haddam, Connecticut.

2PM  - Continued Evidentiary Hearing

Council May 20, 2025 Continuation of the Evidentiary Hearing Memorandum, 04/25/25
1.  Instructions for Access to the May 20, 2025 Evidentiary Hearing Session
2.  Hearing Program 

 

Thursday, May 22, 2025

DOCKET NO. 533 – Tarpon Towers III, LLC and Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at 161 Conrad Street, Naugatuck, Connecticut.

2PM/6:30PM - Public Hearing/Public Comment Session

HEARING INFORMATION
May 22, 2025 Hearing Documents, 04/04/25
1. Instructions for Public Access to Remote Public Hearing
2. Public Hearing Notice
3. Hearing Program 
4. Citizens Guide to Siting Council Procedures; and
5. Proposed Facility Site Plan

Monday, May 26, 2025

OFFICE CLOSED - Memorial Day

 

Thursday, May 29, 2025

1PM - Energy/telecommunications Meeting via Zoom Conferencing

Meeting Materials for the May 29, 2025 Energy/Telecommunications Meeting

 

 

 

MAY 2025

 

Thursday, May 1, 2025

1PM - Energy/telecommunications Meeting via Zoom Conferencing

Meeting Materials for the May 1, 2025 Energy/Telecommunications Meeting

 

Thursday, May 8, 2025

DOCKET NO. 531– Arx Wireless Infrastructure, LLC and New Cingular Wireless PCS, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at 62 and 64 Pershing Drive, Ansonia, Connecticut.

2PM/6:30PM - Public Hearing/Public Comment Session

HEARING INFORMATION
May 8, 2025 Hearing Documents, 02/21/25
1. Instructions for Public Access to Remote Public Hearing
2. Public Hearing Notice
3. Hearing Program 
4. Citizens Guide to Siting Council Procedures; and
5. Proposed Facility Site Plan 

 

Wednesday, May 14, 2025

DOCKET NO. 532 – LSE Serpens LLC (Lodestar Energy) application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a 3.0-megawatt-AC solar photovoltaic electric generating facility and associated equipment on 13 parcels located south of West Hill Road (Parcel Nos. 253/003/018; 253/003/033 through 043 and 053-003-045), Torrington, Connecticut and associated electrical interconnection.

11AM - Pre-Hearing Conference

 

Thursday, May 15, 2025

1PM - Energy/telecommunications Meeting via Zoom Conferencing

Meeting Materials for the May 15, 2025 Energy/Telecommunications Meeting

Tuesday, May 20, 2025

DOCKET NO. 530 – Homeland Towers, LLC and Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at 196 East Haddam-Colchester Turnpike, East Haddam, Connecticut.

2PM  - Continued Evidentiary Hearing

Council May 20, 2025 Continuation of the Evidentiary Hearing Memorandum, 04/25/25
1.  Instructions for Access to the May 20, 2025 Evidentiary Hearing Session
2.  Hearing Program 

 

Thursday, May 22, 2025

DOCKET NO. 533 – Tarpon Towers III, LLC and Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at 161 Conrad Street, Naugatuck, Connecticut.

2PM/6:30PM - Public Hearing/Public Comment Session

HEARING INFORMATION
May 22, 2025 Hearing Documents, 04/04/25
1. Instructions for Public Access to Remote Public Hearing
2. Public Hearing Notice
3. Hearing Program 
4. Citizens Guide to Siting Council Procedures; and
5. Proposed Facility Site Plan

Monday, May 26, 2025

OFFICE CLOSED - Memorial Day

 

Thursday, May 29, 2025

1PM - Energy/telecommunications Meeting via Zoom Conferencing

Meeting Materials for the May 29, 2025 Energy/Telecommunications Meeting

JUNE 2025

Thursday, June 5, 2025

DOCKET NO. 532 – LSE Serpens LLC (Lodestar Energy) application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a 3.0-megawatt-AC solar photovoltaic electric generating facility and associated equipment on 13 parcels located south of West Hill Road (Parcel Nos. 253/003/018; 253/003/033 through 043 and 053-003-045), Torrington, Connecticut and associated electrical interconnection.

2PM/6:30PM - Public Hearing/Public Comment Session

June 5, 2025 Hearing Documents, 04/17/25
1. Instructions for Public Access to Remote Public Hearing
2. Public Hearing Notice
3. Hearing Program
4. Citizens Guide to Siting Council Procedures; and
5. Proposed Facility Site Plan

 

Wednesday, June 11, 2025

DOCKET NO. 534 – The Towers, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at 90 Woodstock Avenue West (Route 171), Woodstock, Connecticut.

11 AM - Pre-Hearing Conference

 

Thursday, June 12, 2025

1PM - Energy/telecommunications Meeting via Zoom Conferencing

Meeting Materials for the June 12, 2025 Energy/Telecommunications Meeting

 

Thursday, June 19, 2025

OFFICE CLOSED Juneteenth

 

Wednesday, June 25, 2025

DOCKET NO. 535 – The Towers, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at 835 Norwich Worcester Turnpike (Route 169), Woodstock, Connecticut.

11AM - Pre-Hearing Conference

 

Thursday, June 26, 2025

1PM - Energy/telecommunications Meeting via Zoom Conferencing

Meeting Materials for the June 26, 2025 Energy/Telecommunications Meeting

 

JULY 2025

 

Friday, July 4, 2025

OFFICE CLOSED Independence Day

 

Thursday, July 10, 2025*CANCELED*

1PM - Energy/telecommunications Meeting via Zoom Conferencing
(This meeting has been canceled.)

 

Wednesday, July 16, 2025

DOCKET NO. 536 – Tarpon Towers III, LLC and Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at 78 Goshen East Street, Norfolk, Connecticut.

11:30AM - Pre-Hearing Conference

 

Thursday, July 17, 2025

DOCKET NO. 534 – The Towers, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at 90 Woodstock Avenue West (Route 171), Woodstock, Connecticut.

2PM/6:30PM - Public Hearing/Public Comment Session

HEARING INFORMATION
July 17, 2025 Hearing Documents, 05/02/25
1. Instructions for Public Access to Remote Public Hearing
2. Public Hearing Notice
3. Hearing Program
4. Citizens Guide to Siting Council Procedures; and
5. Proposed Facility Site Plan
Hearing Procedures and Pre-Hearing Conference Memorandum, 06/04/25 

 

Tuesday, July 22, 2025

DOCKET NO. 532 – LSE Serpens LLC (Lodestar Energy) application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a 3.0-megawatt-AC solar photovoltaic electric generating facility and associated equipment on 13 parcels located south of West Hill Road (Parcel Nos. 253/003/018; 253/003/033 through 043 and 053-003-045), Torrington, Connecticut and associated electrical interconnection.

2PM - Continued Evidentiary Hearing

Council July 22, 2025 Continuation of the Evidentiary Hearing Memorandum, 06/09/25
1. Instructions for Access to the July 22, 2025 Evidentiary Hearing Session
2. Hearing Program

 

Wednesday, July 23, 2025

DOCKET NO. 537 – The Towers, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at 327 North Anguilla Road, Stonington, Connecticut.

11AM - Pre-Hearing Conference

 

Thursday, July 24, 2025

1PM - Energy/telecommunications Meeting via Zoom Conferencing

Meeting Materials for the July 24, 2025 Energy/Telecommunications Meeting

 

Wednesday, July 30, 2025

DOCKET NO. 538 – The Towers, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at 1022 Trumbull Highway, Lebanon, Connecticut. 

11AM - Pre-Hearing Conference

 

Thursday, July 31, 2025

DOCKET NO. 535 – The Towers, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at 835 Norwich Worcester Turnpike (Route 169), Woodstock, Connecticut.

2PM/6:30PM - Public Hearing/Public Comment Session

July 31, 2025 Hearing Documents, 05/02/25
1.Instructions for Public Access to Remote Public Hearing
2.Public Hearing Notice
3.Hearing Program 
4. Citizens Guide to Siting Council Procedures; and
5. Proposed Facility Site Plan 

AUGUST 2025

 

Thursday, August 7, 2025

1PM - Energy/telecommunications Meeting via Zoom Conferencing

Meeting Materials for the August 7, 2025 Energy/Telecommunications Meeting

 

Thursday, August 14, 2025

DOCKET NO. 536 – Tarpon Towers III, LLC and Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at 78 Goshen East Street, Norfolk, Connecticut.

2PM/6:30PM - Public Hearing/Public Comment Session

HEARING INFORMATION
August 14, 2025 Hearing Documents, 05/16/25
1. Instructions for Public Access to Remote Public Hearing
2. Public Hearing Notice
3. Hearing Program 
4. Citizens Guide to Siting Council Procedures; and
5. Proposed Facility Site Plan

 

Wednesday, August 20, 2025

DOCKET NO. 539 – The Towers, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at 424 Storrs Road, Mansfield, Connecticut.

11AM - Pre-Hearing Conference

 

Thursday, August 21, 2025

1PM - Energy/telecommunications Meeting via Zoom Conferencing

Meeting Materials for the August 21, 2025 Energy/Telecommunications Meeting

Wednesday, August 27, 2025

DOCKET NO. 540– The Towers, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at 68 Danbury Road, New Milford, Connecticut.

11AM - Pre-Hearing Conference

 

Thursday, August 28, 2025

DOCKET NO. 537 – The Towers, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at 327 North Anguilla Road, Stonington, Connecticut.

2PM/6:30PM - Public Hearing/Public Comment Session

August 28, 2025 Hearing Documents, 05/16/25
1. Instructions for Public Access to Remote Public Hearing
2. Hearing Notice
3.  Hearing Program 
4.  Citizens Guide to Siting Council Procedures; and
5. Proposed Facility Site Plan

 

SEPTEMBER 2025

 

Monday, September 1, 2025

OFFICE CLOSED Labor Day

 

Thursday, September 4, 2025

1PM - Energy/telecommunications Meeting via Zoom Conferencing

Meeting Materials for the September 4, 2025 Energy/Telecommunications Meeting

 

Tuesday, September 9, 2025

DOCKET NO. 535 – The Towers, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at 835 Norwich Worcester Turnpike (Route 169), Woodstock, Connecticut.

2PM - Continued Evidentiary Hearing

Council September 9, 2025 Evidentiary Hearing Continuation Memorandum, 07/31/25
1.  Instructions for Public Access to Remote Public Hearing
2.  Hearing Program  

 

Wednesday, September 10, 2025

DOCKET NO. 492A– Gravel Pit Solar Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a 120-megawatt-AC solar photovoltaic electric generating facility on eight parcels generally located to the east and west of the Amtrak and Connecticut Rail Line, south of Apothecaries Hall Road and north of the South Windsor town boundary in East Windsor, Connecticut and associated electrical inter-connection. Reopening of this Certificate based on changed conditions pursuant to Connecticut General Statutes §4-181a(b).  Link to DOCKET NO. 492 

11AM - Pre-Hearing Conference

 

Thursday, September 11, 2025

DOCKET NO. 538 – The Towers, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at 1022 Trumbull Highway, Lebanon, Connecticut. 

2PM/6:30PM - Public Hearing/Public Comment Session

HEARING INFORMATION
September 11, 2025 Hearing Documents, 05/30/25
1. Instructions for Public Access to Remote Public Hearing
2. Hearing Notice
3  Hearing Program 
4. Citizens Guide to Siting Council Procedures; and
5. Proposed Facility Site Plan 

 

Wednesday, September 17, 2025

DOCKET NO. 541 – The Towers, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at 132 Bass Road, Windham, Connecticut.

11AM - Pre-Hearing Conference

 

Thursday, September 18, 2025

1PM - Energy/telecommunications Meeting via Zoom Conferencing

Meeting Materials for the September 18, 2025 Energy/Telecommunications Meeting

 

Thursday, September 25, 2025

DOCKET NO. 539 – The Towers, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at 424 Storrs Road, Mansfield, Connecticut.

2PM/6:30PM - Public Hearing/Public Comment Session

HEARING INFORMATION
September 25, 2025 Hearing Documents, 05/30/25
1. Instructions for Public Access to Remote Public Hearing
2. Hearing Notice
3. Hearing Program 
4. Citizens Guide to Siting Council Procedures; and
5. Proposed Facility Site Plan 

 

OCTOBER 2025

Wednesday, October 1, 2025

DOCKET NO. 542 – The Towers, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at Parcel No. 151-1-1, Pequotsepos Road, Stonington (Mystic), Connecticut.

11AM - Pre-Hearing Conference

 

Thursday, October 2, 2025

1PM - Energy/telecommunications Meeting via Zoom Conferencing

Meeting Materials for the October 2, 2025 Energy/Telecommunications Meeting

 

Thursday, October 9, 2025

DOCKET NO. 492A – Gravel Pit Solar Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a 120-megawatt-AC solar photovoltaic electric generating facility on eight parcels generally located to the east and west of the Amtrak and Connecticut Rail Line, south of Apothecaries Hall Road and north of the South Windsor town boundary in East Windsor, Connecticut and associated electrical inter-connection. Reopening of this Certificate based on changed conditions pursuant to Connecticut General Statutes §4-181a(b).  Link to DOCKET NO. 492 

2PM/6:30PM - Public Hearing/Public Comment Session

HEARING INFORMATION
October 9, 2025 Hearing Documents, 05/30/25
1. Instruction for Public Access to Remote Public Hearing
2. Public Hearing Notice
3. Hearing Program 
4. Proposed Expansion Site Plan
Zoom Remote Public Hearing Recording, 10/09/25 (Passcode: t&6KDr5^ )

 

Monday, October 13, 2025

OFFICE CLOSED Columbus Day

 

Thursday, October 16, 2025

1PM - Energy/telecommunications Meeting via Zoom Conferencing

Meeting Materials for the October 16, 2025 Energy/Telecommunications Meeting

 

Thursday, October 23, 2025

DOCKET NO. 540– The Towers, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at 68 Danbury Road, New Milford, Connecticut.

2PM/6:30PM - Public Hearing/Public Comment Session

HEARING INFORMATION
October 23, 2025 Hearing Documents, 06/26/25
1. Instructions for Public Access to Remote Public Hearing
2. Hearing Notice
3. Hearing Program
4.  Citizens Guide to Siting Council Procedures; and
5. Proposed Facility Site Plan

 

Wednesday, October 29, 2025

DOCKET NO. 543– The Towers, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at 17 Warren Road, Washington (New Preston), Connecticut.

11AM - Pre-Hearing Conference  

 

Thursday, October 30, 2025

1PM - Energy/telecommunications Meeting via Zoom Conferencing

Meeting Materials for the October 30, 2025 Energy/Telecommunications Meeting

 

 

NOVEMBER 2025

Thursday, November 6, 2025

DOCKET NO. 541 – The Towers, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at 132 Bass Road, Windham, Connecticut.

2PM/6:30PM - Public Hearing/Public Comment Session

HEARING INFORMATION
November 6, 2025 Hearing Documents, 07/25/25
1. Instructions for Public Access to Remote Public Hearing
2. Hearing Notice
3. Hearing Program 
4. Citizens Guide to Siting Council Procedures; and
5. Proposed Facility Site Plan

 

Tuesday, November 11, 2025

OFFICE CLOSED Veterans Day

 

Thursday, November 13, 2025

1PM - Energy/telecommunications Meeting via Zoom Conferencing

Meeting Materials for the November 13, 2025 Energy/Telecommunications Meeting 

 

Tuesday, November 18, 2025

DOCKET NO. 492A – Gravel Pit Solar Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a 120-megawatt-AC solar photovoltaic electric generating facility on eight parcels generally located to the east and west of the Amtrak and Connecticut Rail Line, south of Apothecaries Hall Road and north of the South Windsor town boundary in East Windsor, Connecticut and associated electrical inter-connection. Reopening of this Certificate based on changed conditions pursuant to Connecticut General Statutes §4-181a(b).  Link to DOCKET NO. 492 

2PM - Continued Evidentiary Hearing

HEARING INFORMATION
Council November 18, 2025 Continuation of Evidentiary Hearing Memorandum, 10/10/25
1. Instructions for Access to November 18, 2025 Evidentiary Hearing Session
2. Hearing Program 

 

Thursday, November 20, 2025

DOCKET NO. 516R – The United Illuminating Company (UI) application for a Certificate of Environmental Compatibility and Public Need for the Fairfield to Congress Railroad Transmission Line 115-kV Rebuild Project that consists of the relocation and rebuild of its existing 115- kilovolt (kV) electric transmission lines from the railroad catenary structures to new steel monopole structures and related modifications along approximately 7.3 miles of the Connecticut Department of Transportation’s Metro-North Railroad corridor between Structure B648S located east of Sasco Creek in Fairfield and UI’s Congress Street Substation in Bridgeport, and the rebuild of two existing 115-kV transmission lines along 0.23 mile of existing UI right-of-way to facilitate interconnection of the rebuilt 115-kV electric transmission lines at UI’s existing Ash Creek, Resco, Pequonnock and Congress Street Substations traversing the municipalities of Bridgeport and Fairfield, Connecticut. Court-ordered Remand Regarding Connecticut Siting Council’s February 15, 2024 Final Decision pursuant to Connecticut General Statutes §4-183(j). UI Petition for Reconsideration.

2 PM - Special Meeting

November 20, 2025 Special Meeting Materials

 

Thursday, November 27, 2025

OFFICE CLOSED Thanksgiving Day